X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27197

Well Details

Well ID: 37-059-27197
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Aleppo Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 153339
Farm/Lease Name: GREAT TIGER 2
License Status:
Spud Date:
Permit Date: 2016-12-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.827906
Longitude: -80.4781

For data sources see[1][2][3]

Well History

Date Event
2016-12-02 New Permit Application
2017-04-13 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-13 2018-01-10 7,891 12,331,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 14 0.00004275 51.8
Water 7732-18-5 50 0.0220714 26742.6
NE-50 Lubrizol Inverter Listed Below
MX-5-3886 Multi-Chem Bacteria Treatment Listed Below
Water Universal Carrier/Base Fluid Water 7732-18-5 100 84.9303 102,905,000.0
Scale Hib PE-18 Universal Scale Inhibitor Listed Below
Calcium Chloride Occidental Chemical Corporation Clay Stabilizer Water 7732-18-5 50 0.0220714 26742.6
Water 7732-18-5 14 0.00004275 51.8
Unislick CST-LA Chemplex Friction Reducer Listed Below
Sand (Proppant) Universal Proppant Listed Below
MX-8-4543 Multi-Chem Bacteria Treatment Listed Below
Hydrochloric Acid (15%) Universal Acidizing Water 7732-18-5 90 0.112019 135727
SFR-451 Clariant Friction Reducer Listed Below
Alcohols, C12-14, ethoxylated 68439-50-9 5 0.00179595 2176.04
Potassium Chloride 7447-40-7 3 0.00000916 11.1
Calcium Nitrate.4H2O 13477-34-4 100 0.0561951 68088.3
Ethylene Glycol 107-21-1 40 0.00972434 11782.4
Dimethylcocoamine 61788-93-0 5 0.00008073 97.81
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000882857 1069.7
Hydrotreated Distillate 64742-47-8 20 0.00882857 10697.1
Alcohols, Ethoxylated 68551-12-2 5 0.000151487 183.548
Hydrogen Chloride 7647-01-0 36.9 0.0459279 55648.1
Hydrotreated Distillate 64742-47-8 20 0.00882857 10697.1
Dimethylcocoamine 61788-93-0 5 0.00008073 97.81
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.000908925 1101.29
Calcium Chloride 10043-52-4 87 0.000265673 321.9
Copolymer of 2-propenamide Proprietary 20 0.00882857 10697.1
Formaldehyde 0000050-00-0 1 0.00000102 1.234
Silica Substrate 14808-60-7 100 14.7748 17,901,700.0
Alcohols, Ethoxylated 68439-50-9 5 0.000151487 183.548
Hydrogen Chloride 7647-01-0 36.9 0.0459279 55648.1
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.00005092 61.699
Copolymer of 2-propenamide Proprietary 20 0.00882857 10697.1
Sodium Chloride 7647-14-5 2 0.00000611 7.4
Alcohols, C10-16, ethoxylated 0068002-97-1 50 0.00005092 61.699
Alcohols, Ethoxylated 68002-97-1 5 0.000151487 183.548
Alcohols, Ethoxylated 68002-97-1 5 0.000151487 183.548
Methanol 67-56-1 10 0.000161451 195.62
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000882857 1069.7
Isopropyl Alcohol 67-63-0 30 0.000484352 586.86
Methanol 67-56-1 10 0.000161451 195.62
Thiourea 0000062-56-6 1 0.00000102 1.234
Methanol 0000067-56-1 5 0.00000509 6.17
Alcohols, C10-16, ethoxylated 68002-97-1 5 0.00179595 2176.04
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.000908925 1101.29
Dimethylcocoamine, bis (chloreothyl)
ether, diquaternary ammonium salt
68607-28-3 20 0.000322901 391.24
Calcium Chloride 10043-52-4 87 0.000265673 321.9
Ammonium Acetate 631-61-8 10 0.00359189 4352.08
Thiourea 0000062-56-6 1 0.00000102 1.234
Dimethylcocoamine, bis (chloreothyl)
ether, diquaternary ammonium salt
68607-28-3 20 0.000322901 391.24
Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0107757 13056.3
Methanol 0000067-56-1 5 0.00000509 6.17
Oleic Acid Diethanolamide 93-83-4 2 0.000882857 1069.7
Butyl Diglycol 0000112-34-5 75 0.00007638 92.548
Ammonium Acetate 631-61-8 13 0.000393867 477.226
Contains no hazardous substances
in concentrations above
cut-off values according to the competent authority
Proprietary 100 0.00489339 5929.03
Alcohols, Ethoxylated 68551-12-2 5 0.000151487 183.548
Ammonium Acetate 631-61-8 13 0.000393867 477.226
Isopropyl Alcohol 67-63-0 30 0.000484352 586.86
Oleic Acid Diethanolamide 93-83-4 2 0.000882857 1069.7
Potassium Chloride 7447-40-7 3 0.00000916 11.1
Alcohols, Ethoxylated 68439-50-9 5 0.000151487 183.548
Proprietary Scale Inhibitor Proprietary 30 0.00729325 8836.8
Sodium Chloride 7647-14-5 2 0.00000611 7.4
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00179595 2176.04
Formaldehyde 0000050-00-0 1 0.00000102 1.234
Butyl Diglycol 0000112-34-5 75 0.00007638 92.548
Unislick ST-50 Universal Friction Reducer Listed Below
Unihib-G GeoSafe Acid Corrosion Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2018 RICE DRILLING B LLC 1,388,628.00 201 0.00 0 0.00 0
2019 RICE DRILLING B LLC 817,899.00 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 RICE DRILLING B LLC Synthetic Liner Materials 0.84 Tons LANDFILL 100419
2017 RICE DRILLING B LLC Drilling Fluid Waste 83.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 RICE DRILLING B LLC Servicing Fluid 0.57 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 194.75 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Drilling Fluid Waste 2.76 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 144.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 179.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drill Cuttings 28.87 Tons LANDFILL 06-08438
2017 RICE DRILLING B LLC Produced Fluid 62.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Drill Cuttings 10.01 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2017 RICE DRILLING B LLC Produced Fluid 84.50 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Synthetic Liner Materials 5.44 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 142.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 RICE DRILLING B LLC Drill Cuttings 255.29 Tons LANDFILL 100172
2017 RICE DRILLING B LLC Drill Cuttings 44.18 Tons LANDFILL 100620
2017 RICE DRILLING B LLC Synthetic Liner Materials 0.34 Tons LANDFILL 06-08438
2017 RICE DRILLING B LLC Synthetic Liner Materials 5.68 Tons LANDFILL 100663
2017 RICE DRILLING B LLC Drilling Fluid Waste 433.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 5.12 Tons LANDFILL MID000724831
2018 RICE DRILLING B LLC Soil Contaminated by Oil 0.10 Tons LANDFILL CID: 29084
2018 RICE DRILLING B LLC Servicing Fluid 60.85 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 1,116.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 28.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 RICE DRILLING B LLC Produced Fluid 23.41 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 152.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 1,694.13 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Servicing Fluid 541.76 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 53.68 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.10 Tons LANDFILL CID: 29084
2018 RICE DRILLING B LLC Produced Fluid 82.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 850.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Synthetic Liner Materials 25.81 Tons LANDFILL 100419
2019 RICE DRILLING B LLC Produced Fluid 494.13 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019 RICE DRILLING B LLC Produced Fluid 82.55 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 370.59 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 RICE DRILLING B LLC Produced Fluid 1.70 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Produced Fluid 54.90 Bbl INJECTION DISPOSAL WELL 2D0859721
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 23.13 Bbl INJECTION DISPOSAL WELL 2D0859721
2019 RICE DRILLING B LLC Produced Fluid 53.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 483.75 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 8,111.63 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 3,866.08 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 RICE DRILLING B LLC Produced Fluid 27.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2582990 Primary Facility 2017-04-14 Drilling/Alteration No Violations Noted Well spud on 4/13/2017. Operator drilled 36-inch borehole and set and cemented 26-inch conductor pipe at 40 ft. Cylindrical well cellar installed around conductor.
2589081 Primary Facility 2017-04-20 Routine/Complete Inspection No Violations Noted On 4/20/2017, the Department performed an inspection of the Rice Energy Great Tiger well pad site. Present at time of inspection was Clay Clifford (Rice). The site is located in Aleppo Twp., Greene Co. The inspection was a routine inspection post setting of conductors for newly permitted wells on the site.

The site is stable with greater than 70% vegetative cover, accept for a small slope failure in the PCSM structure on the northeast corner of the well pad. The operator will need to re-stabilize and repair the Retention Basin.

The operator has set 4 well conductors on the site in preparation for future drilling on these wells. Conductors have been set to 40' on the 2H, 4H, 6H, and 8H.

2591941 Primary Facility 2017-05-02 Drilling/Alteration No Violations Noted Well spud on 4/13/2017. Operator rigging up on well. Operator has installed containment and rig mats. Falcon # 1 rig on site.
2599021 Primary Facility 2017-05-23 Drilling/Alteration No Violations Noted Top hole portion of the well is complete. Surface, coal, and intermediate casings set and cemented to the surface. Operator experienced circulation issues on 24” borehole section during 20” cement job. Operator circulated out cement. Operator was able to establish circulation after use of lcm and conditioning. Full cement job was successfully pumped. Borehole drilled to 6,622’ TMD. Borehole loaded with drilling mud.
2733926 Primary Facility 2018-05-03 Routine/Complete Inspection No Violations Noted On May 3, 2018, the Department performed an inspection of the EQT, Great Tiger well site. Present at time of inspection was Walter Nelson, and Jamie Davis (EQT). The site is located in Aleppo Twp., Greene Co. The inspection was related to a request by the operator for a minor modification to the Glass Joe, ESCGP2 permit.

The operator has requested to enlarge the excess material stockpile along the Glass Joe and Great Tiger stockpile to allow for storage of the excess material/stone generated by the placement of the well production lines on the Great Tiger well pad. The minor modification was reviewed by the Department in the field and approved. The minor modification was redlined on the E&S plans for the ESCGP2 permit on the site.

A slide has developed in the well pad fill slope up gradient of the sediment trap on the northeast corner of the site. The operator is monitoring the soil movement and is currently developing a plan to stabilize the area.

4 wells have been drilled on the site to TD and have

2846715 Primary Facility 2019-02-28 Routine/Complete Inspection No Violations Noted

For data sources see[8]

References