If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20700 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.411236,"lon":-77.142606,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Cogan House Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 148797 | |
Farm/Lease Name: LYCOMING H&FC C 18H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-09-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.411236 | |
Longitude: -77.142606 |
Date | Event |
---|---|
2011-09-30 | New Permit Application |
2011-11-15 | Performed Spud Operation |
2011-12-01 | New Permit Application |
2012-02-17 | New Permit Application |
2012-07-10 | Drilling Completion |
2013-01-15 | Perforation |
2014-03-04 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-09 | 2013-07-15 | 9,126 | 4,751,580 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Bio-Clear 1000 | Trican Well Service | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 98 | 0.0019698 | 921.754 |
Water | Anadarko | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.7368 | 39,651,900.0 | |
Hydrochloric Acid (7.5%) | Trican Well Service | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0556402 | 26036.4 | |
AI-7NR | Trican Well Service | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00002853 | 13.352 | |
Sand (Proppant) | Trican Well Service | Proppant | Quartz | 14808-60-7 | 99 | 14.3124 | 6,697,370.0 | |
Hexamethylenetretramine | 100-97-0 | 1 | 0.144569 | 67650.2 | ||||
FEAC-20 | Trican Well Service | Iron Control | Citric Acid | 77-92-9 | 30 | 0.000205153 | 96 | |
Acetic Acid | 64-19-7 | 50 | 0.000341922 | 160 | ||||
Bio-Clear 5000 | Trican Well Service | Biocide | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 10 | 0.00467377 | 2187.06 | |
Polyethylene glycol | 25322-68-3 | 70 | 0.0327164 | 15309.4 | ||||
FR-8 | Trican Well Service | Friction Reducer | Ammonium chloride | 12125-02-9 | 1.5 | 0.000182106 | 85.215 | |
Petroleum Distillate | 64742-47-8 | 28 | 0.00339931 | 1590.68 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | ANADARKO E&P ONSHORE LLC | 918,091.00 | 139 | 0.00 | 0 | 0.00 | 0 |
2014 | ANADARKO E&P ONSHORE LLC | 1,668,972.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ANADARKO E&P ONSHORE LLC | 571,158.00 | 151 | 0.00 | 0 | 0.00 | 0 |
2016 | ANADARKO E&P ONSHORE LLC | 939,280.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ARD OPR LLC | 509,355.07 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ARD OPR LLC | 539,208.75 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ARD OPR LLC | 387,934.35 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | ANADARKO E&P ONSHORE LLC | Drilling Fluid Waste | 240.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 11,160.85 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 2,149.43 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 16.62 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 31.74 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 465.85 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 73.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 66.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 54.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 315.79 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 28.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 49.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 34.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | ARD OPR LLC | Produced Fluid | 19.12 Bbl | REUSE (AT WELL PAD) | |
2018 | ARD OPR LLC | Produced Fluid | 38.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ARD OPR LLC | Produced Fluid | 222.69 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 181.58 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 0.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2025803 | Primary Facility | 2011-12-06 | Routine/Complete Inspection | No Violations Noted | Both pads have cellar and conductor (w/ mousehole) on three wells |
2052524 | Primary Facility | 2012-03-20 | Drilling/Alteration | No Violations Noted | |
2067562 | Primary Facility | 2012-05-14 | Drilling/Alteration | No Violations Noted | |
2139557 | Primary Facility | 2013-02-14 | Routine/Complete Inspection | No Violations Noted | |
2153129 | Primary Facility | 2013-04-02 | Routine/Complete Inspection | No Violations Noted | |
2155563 | Primary Facility | 2013-04-09 | Drilling/Alteration | No Violations Noted | |
2593892 | Primary Facility | 2017-04-27 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconvnetional well in production. No violations noted at time of inspection. |
2775250 | Primary Facility | 2018-09-14 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. Two sand separators. One main sand separator before GPU. No leaks detected from production equipment. Methanol tanks located near well heads. No violations noted. |
For data sources see[8]