X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21454

Well Details

Well ID: 37-081-21454
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: ARD OPR LLC
Well Pad ID: 145662
Farm/Lease Name: KENMAR HC A-1H
License Status: Active
Spud Date: 2014-12-13
Permit Date: 2014-11-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.377378
Longitude: -77.209681

For data sources see[1][2][3]

Well History

Date Event
2014-11-26 New Permit Application
2014-12-13 Performed Spud Operation
2015-01-22 Drilling Completion
2016-07-10 Perforation
2016-07-17 Perforation
2016-07-17 Performed Stage 1 of Stimulation
2016-07-17 Performed Stage 2 of Stimulation
2016-07-18 Perforation
2016-07-18 Performed Stage 3 of Stimulation
2016-07-18 Performed Stage 4 of Stimulation
2016-07-18 Performed Stage 5 of Stimulation
2016-07-19 Perforation
2016-07-19 Performed Stage 10 of Stimulation
2016-07-19 Performed Stage 6 of Stimulation
2016-07-19 Performed Stage 7 of Stimulation
2016-07-19 Performed Stage 8 of Stimulation
2016-07-19 Performed Stage 9 of Stimulation
2016-07-20 Perforation
2016-07-20 Performed Stage 11 of Stimulation
2016-07-20 Performed Stage 12 of Stimulation
2016-07-20 Performed Stage 13 of Stimulation
2016-07-20 Performed Stage 14 of Stimulation
2016-07-20 Performed Stage 15 of Stimulation
2016-07-21 Perforation
2016-07-21 Performed Stage 16 of Stimulation
2016-07-21 Performed Stage 17 of Stimulation
2016-07-21 Performed Stage 18 of Stimulation
2016-07-21 Performed Stage 19 of Stimulation
2016-07-21 Performed Stage 20 of Stimulation
2016-07-21 Performed Stage 21 of Stimulation
2016-07-22 Perforation
2016-07-22 Performed Stage 22 of Stimulation
2016-07-22 Performed Stage 23 of Stimulation
2016-07-22 Performed Stage 24 of Stimulation
2016-07-22 Performed Stage 25 of Stimulation
2016-07-22 Performed Stage 26 of Stimulation
2016-07-23 Perforation
2016-07-23 Performed Stage 27 of Stimulation
2016-07-23 Performed Stage 28 of Stimulation
2016-07-23 Performed Stage 29 of Stimulation
2016-07-23 Performed Stage 30 of Stimulation
2016-07-23 Performed Stage 31 of Stimulation
2017-02-15 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-17 2016-07-23 8,833 8,877,180 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WATER ANADARKO CARRIER/BASE FLUID WATER 7732-18-5 100 89.0149 73,529,300.0
WHITE UNSPECIFIED 100 MESH HALLIBURTON PROPPING AGENT CRYSTALLINE SILICA, QUARTZ 14808-60-7 100 1.52479 1,260,120.0
WHITE UNSPECIFIED 40/70 HALLIBURTON PROPPING AGENT CRYSTALLINE SILICA, QUARTZ 14808-60-7 100 8.62175 7,125,200.0
MC B-8510 MULTICHEM BIOCIDE SODIUM BROMIDE 7647-15-6 5 0.0008834 730
DIBROMOACETONITRILE 3252-43-5 5 0.0008834 730
2,2-DIBROMO-3-NITRILOPROPIONAMIDE 10222-01-2 30 0.0053006 4380
FR-78 HALLIBURTON FRICTION REDUCER POLYACRYLATE Not Assigned 30 0.0187889 15528
FATTY NITROGEN DERIVED AMIDES Not Assigned 5 0.0031315 2588
ETHOXYLATED ALCOHOLS Not Assigned 5 0.0031315 2588
HYDROTREATED LIGHT PETROLEUM DISTILLATE 64742-47-8 30 0.0187889 15528
FR-A12 HALLIBURTON FRICTION REDUCER NO HAZARDOUS INGREDIENTS Not Assigned 100 0.0171618 14183
15% HCL HALLIBURTON ACID HYDROCHLORIC ACID 7647-01-0 30 0.0140561 11616
WATER 7732-18-5 70 0.0327975 27105
FE-1A HALLIBURTON IRON CONTROL ACETIC ACID 64-19-7 60 0.0004886 404
ACETIC ANHYDRIDE 108-24-7 100 0.0008144 673
HAI-OS HALLIBURTON CORROSION INHIBITOR METHANOL 67-56-1 60 0.0003613 299
PROPARGYL ALCOHOL 107-19-7 10 0.00006020 50
MC B-8520 MULTICHEM BIOCIDE 4,4-DIMETHYLOXAZOLIDINE 51200-87-4 100 0.0084173 6956
2-AMINO-2-METHYL-1-PROPANOL 124-68-5 1 0.00008420 70
3,4,4-TRIMETHYLOXAZOLIDINE 75673-43-7 5 0.0004209 348
7.5% HCL HALLIBURTON ACID WATER 7732-18-5 90 0.653607 540155
HYDROCHLORIC ACID 7647-01-0 10 0.072623 60017

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-07-17 1 WHITE SAND 4,968,005 8,701 7,208
2016-07-17 2 WHITE SAND 4,968,005 8,588 8,405
2016-07-18 3 WHITE SAND 4,968,005 8,505 7,858
2016-07-18 4 WHITE SAND 4,968,005 8,799 7,886
2016-07-18 5 WHITE SAND 4,968,005 8,690 8,477
2016-07-19 6 WHITE SAND 4,968,005 8,736 7,770
2016-07-19 7 WHITE SAND 4,968,005 8,974 7,310
2016-07-19 8 WHITE SAND 4,968,005 8,663 7,373
2016-07-19 9 WHITE SAND 4,968,005 8,687 7,563
2016-07-19 10 WHITE SAND 4,968,005 8,765 7,474
2016-07-20 11 WHITE SAND 4,968,005 8,795 7,133
2016-07-20 12 WHITE SAND 4,968,005 8,891 7,296
2016-07-20 13 WHITE SAND 4,968,005 8,731 6,885
2016-07-20 14 WHITE SAND 4,968,005 8,704 7,035
2016-07-20 15 WHITE SAND 4,968,005 8,742 7,643
2016-07-21 16 WHITE SAND 4,968,005 8,750 7,473
2016-07-21 17 WHITE SAND 4,968,005 8,529 6,861
2016-07-21 18 WHITE SAND 4,968,005 8,448 6,407
2016-07-21 19 WHITE SAND 4,968,005 8,639 7,108
2016-07-21 20 WHITE SAND 4,968,005 8,682 6,932
2016-07-21 21 WHITE SAND 4,968,005 8,626 7,351
2016-07-22 22 WHITE SAND 4,968,005 8,520 6,578
2016-07-22 23 WHITE SAND 4,968,005 8,876 6,326
2016-07-22 24 WHITE SAND 4,968,005 8,536 6,817
2016-07-22 25 WHITE SAND 4,968,005 8,334 6,522
2016-07-22 26 WHITE SAND 4,968,005 8,404 6,691
2016-07-23 27 WHITE SAND 4,968,005 8,250 7,055
2016-07-23 28 WHITE SAND 4,968,005 8,510 6,514
2016-07-23 29 WHITE SAND 4,968,005 8,318 6,668
2016-07-23 30 WHITE SAND 4,968,005 8,084 6,546
2016-07-23 31 WHITE SAND 4,968,005 7,936 6,642

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 1,291,097.00 129 0.00 0 0.00 0
2017 ARD OPR LLC 2,464,395.55 343 0.00 0 0.00 0
2018 ARD OPR LLC 1,689,877.48 288 0.00 0 0.00 0
2019 ARD OPR LLC 1,297,289.21 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 ANADARKO E&P ONSHORE LLC Drill Cuttings 99.39 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Drill Cuttings 1,426.96 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 505.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 6,964.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 210.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 2,403.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 803.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 1,528.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 3,143.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 569.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 798.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 224.00 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 1,607.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 1,582.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 144.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 2,712.77 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 169.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ARD OPR LLC Produced Fluid 100.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 ARD OPR LLC Produced Fluid 538.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 1,924.54 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 7.13 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 70.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2334572 Primary Facility 2015-01-07 Routine/Complete Inspection No Violations Noted
2334738 Primary Facility 2014-12-29 Drilling/Alteration No Violations Noted
2342646 Primary Facility 2015-02-04 Routine/Complete Inspection No Violations Noted At the time of inspection cloudy sky, 15” snow cover and ~25° F.
2494705 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted Inspection for Inactive status application. No violations noted.
2503915 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/17/2016.

I entered the location at 12:18 with Jared Rutt (DEP) and began the inspection. At the time of the inspection, Halliburton was finishing the hydraulic frac on the 15th stage on the Kenmar A 1H (081-21454). We walked the site with the company man and noticed some water in containment that had water between 3,000-4,000 umhos/cm. No indication was found of any leaks around the produced water tanks or around the secondary containments under the blenders or individual equipment. I recommended vacuuming the water off the containment when possible. Overall, the site is in good condition. This is the only well scheduled for completions at this time.

The well pad area and access road are all stabilized and no erosion was noted. The well site remains at its originally constructed size and the operator plans on applying for an ESCGP-2 to accommodate Post Construction Stormwater Management (PCSM) according to the identified in the restoration assessment submitted on August of 20

2505335 Primary Facility 2016-07-27 Routine/Complete Inspection No Violations Noted
2586515 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well in production. No violations noted at time of inspection.
2697845 Primary Facility 2018-02-13 Routine/Complete Inspection No Violations Noted I entered the site and spoke to the company man (Keith Heiken) and we walked the site. Conditions were sunny and above freezing with snow cover. The rig was snubbing tubing on the Kenmar 2H at the time of the inspection. The containment berm on the south/southeast side was worn and less effective than other parts of the berm. The company man said they would be moving the workover/snubbing unit off location within about a day. I recommended monitoring the containment berm since they were nearly complete. The company man pointed out the vac truck onsite and said they have been vacuuming the containment as more snow and ice melts. No violations noted.

For data sources see[9]

References