X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21455

Well Details

Well ID: 37-081-21455
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: ARD OPR LLC
Well Pad ID: 145662
Farm/Lease Name: KENMAR HC A-2H
License Status: Inactive
Spud Date: 2014-12-14
Permit Date: 2014-11-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.377386
Longitude: -77.209625

For data sources see[1][2][3]

Well History

Date Event
2014-11-26 New Permit Application
2014-12-14 Performed Spud Operation
2015-02-17 Drilling Completion
2016-09-19 Inactive Well Request Granted
2017-04-27 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-11 2018-01-25 8,710 13,553,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Glutaral 111-30-8 26.7 0.00228116 2865.14
ethylbenzene 100-41-4 1 0.00000737 9.256
Petroleum distillate 64742-47-8 20 0.0197459 24800.9
Copolymer of 2-propenamide 69418-26-4 20 0.0197459 24800.9
Methanol 67-56-1 30 0.00650262 8167.29
oleic acid diethanolamide 93-83-4 2 0.00197459 2480.09
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00003685 46.281
Fatty imidazoline 61790-69-0 5 0.00003685 46.281
Water 7732-18-5 92.5 0.0694965 87287.6
prop-2-yn-1-ol 107-19-7 5 0.00003685 46.281
ethonal 64-17-5 2.8 0.000239223 300.464
Isopropyl Alcohol 67-63-0 5 0.00003685 46.281
Citric acid 77-92-9 30 0.000625356 785.448
didecyldimethylammonium chloride 7173-51-5 8 0.000680931 855.25
alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00197459 2480.09
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000453669 569.809
xylene 1330-20-7 5 0.00003685 46.281
KFR-23 Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 2 0.00197459 2480.09
Copolymer of 2-propenamide 69418-26-4 20 0.0197459 24800.9
oleic acid diethanolamide 93-83-4 2 0.00197459 2480.09
Petroleum distillate 64742-47-8 20 0.0197459 24800.9
Water 7732-18-5 50 0.0493648 62002.2
Hydrochloric Acid (7%) Keane Acidizing Water 7732-18-5 92.5 0.0694965 87287.6
Hydrochloric Acid 7647-01-0 7.5 0.00563485 7077.38
KSI-19 Keane Scale Inhibitor Methanol 67-56-1 30 0.00650262 8167.29
Water 7732-18-5 80 0.0173403 21779.4
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 9.74374 12,238,100.0
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 90.0494 113,102,000.0
KFEAC-30 Keane Iron Control Acetic acid 64-19-7 5 0.000104226 130.908
Citric acid 77-92-9 30 0.000625356 785.448
KAI-12 Keane Acid Inhibitor Isopropyl Alcohol 67-63-0 5 0.00003685 46.281
Fatty imidazoline 61790-69-0 5 0.00003685 46.281
xylene 1330-20-7 5 0.00003685 46.281
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00003685 46.281
ethylbenzene 100-41-4 1 0.00000737 9.256
prop-2-yn-1-ol 107-19-7 5 0.00003685 46.281
Methanol 67-56-1 90 0.000663268 833.065
MBC-516 Keane Biocide Water 7732-18-5 56.7 0.00484597 6086.55
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000453669 569.809
ethonal 64-17-5 2.8 0.000239223 300.464
Glutaral 111-30-8 26.7 0.00228116 2865.14
didecyldimethylammonium chloride 7173-51-5 8 0.000680931 855.25

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2017 ARD OPR LLC 0.00 0 0.00 0 0.00 0
2018 ARD OPR LLC 2,891,660.62 307 0.00 0 0.00 0
2019 ARD OPR LLC 2,876,810.89 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 ANADARKO E&P ONSHORE LLC Drill Cuttings 12.33 Tons LANDFILL 301626
2015 ANADARKO E&P ONSHORE LLC Drill Cuttings 1,546.43 Tons LANDFILL 301626
2017 ARD OPR LLC Drilling Fluid Waste 420.00 Bbl REUSE (AT WELL PAD)
2017 ARD OPR LLC Drilling Fluid Waste 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Synthetic Liner Materials 80.64 Tons LANDFILL 100955
2018 ARD OPR LLC Produced Fluid 3,518.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 347.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ARD OPR LLC Produced Fluid 11,445.98 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 296.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 207.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 ARD OPR LLC Produced Fluid 1,122.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 4,342.44 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 147.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Other Oil & Gas Wastes 15.87 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2334574 Primary Facility 2015-01-07 Routine/Complete Inspection No Violations Noted
2334739 Primary Facility 2014-12-29 Drilling/Alteration No Violations Noted
2342642 Primary Facility 2015-02-04 Routine/Complete Inspection No Violations Noted At the time of inspection cloudy sky, 15” snow cover and ~25° F.
2494729 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted Inspection for Inactive status application. No violations noted.
2503918 Primary Facility 2016-07-20 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/17/2016.

I entered the location at 12:18 with Jared Rutt (DEP) and began the inspection. At the time of the inspection, Halliburton was finishing the hydraulic frac on the 15th stage on the Kenmar A 1H (081-21454). We walked the site with the company man and noticed some water in containment that had water between 3,000-4,000 umhos/cm. No indication was found of any leaks around the produced water tanks or around the secondary containments under the blenders or individual equipment. I recommended vacuuming the water off the containment when possible. Overall, the site is in good condition. This is the only well scheduled for completions at this time.

The well pad area and access road are all stabilized and no erosion was noted. The well site remains at its originally constructed size and the operator plans on applying for an ESCGP-2 to accommodate Post Construction Stormwater Management (PCSM) according to the identified in the restoration assessment submitted on August of 20

2505337 Primary Facility 2016-07-27 Routine/Complete Inspection No Violations Noted
2586646 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted Routine inspection of well on regulatory inactive status. No violations noted at time of inspection.
2678255 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted Weather was 10 degrees F., cloudy and windy at time of inspection. Well site is being prepared for stimulation of the Kenmar A 2-H well. Tubing was being pulled from the well-bore when we arrived on location. Met with ARD representatives Marek Romatowski and Keith Heiken. Discussed accessibility to the drilling and alteration permit. When asked for it they were unable to produce it. Rig is expected to leave location on 1/5/18 and fracturing of the well-bore is anticipated to begin early next week. No violations noted at time of inspection.
2683622 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted Weather was 35° and cloudy at time of inspection. Met with Alta resources representative Rodney Blanton at time of inspection. Also met with BCI Stimulation Specialist, Tim Bright to discuss fracturing procedures. Stimulation was currently at a stand still due to a family emergency of the onsite Fracturing Engineer. Keane was waiting on a replacement engineer to arrive on location. No violations noted at time of inspection.
2697849 Primary Facility 2018-02-13 Routine/Complete Inspection No Violations Noted I entered the site and spoke to the company man (Keith Heiken) and we walked the site. Conditions were sunny and above freezing with snow cover. The rig was snubbing tubing on the Kenmar 2H at the time of the inspection. The containment berm on the south/southeast side was worn and less effective than other parts of the berm. The company man said they would be moving the workover/snubbing unit off location within about a day. I recommended monitoring the containment berm since they were nearly complete. The company man pointed out the vac truck onsite and said they have been vacuuming the containment as more snow and ice melts. No violations noted.

For data sources see[8]

References