X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-105-21874

Well Details

Well ID: 37-105-21874
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Eulalia Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153811
Farm/Lease Name: REESE HOLLOW 115 6HU
License Status:
Spud Date: 2016-09-30
Permit Date: 2016-08-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.798673
Longitude: -77.976387

For data sources see[1][2][3]

Well History

Date Event
Deviated
2016-08-05 New Permit Application
2016-09-22 Performed Spud Operation
2017-03-28 MOD
2017-05-15 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-04 2017-12-16 10,869 9,595,820 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KAI-12 Keane Acid Inhibitor Fatty imidazoline 61790-69-0 5 0.00008073 75.03
Methanol 67-56-1 90 0.00145316 1350.54
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00008073 75.03
xylene 1330-20-7 5 0.00008073 75.03
prop-2-yn-1-ol 107-19-7 5 0.00008073 75.03
isoproyl alcohol 67-63-0 5 0.00008073 75.03
ethylbenzene 100-41-4 1 0.00001615 15.006
KFEAC-30 Keane Iron Control Citric acid 77-92-9 30 0.000933864 867.913
Acetic acid 64-19-7 5 0.000155644 144.652
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-ol 107-19-7 5 0.00008073 75.03
Water 7732-18-5 92.5 0.70659 656689
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0155186 14422.7
oleic acid diethanolamide 93-83-4 2 0.00155186 1442.27
Citric acid 77-92-9 30 0.000933864 867.913
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00008073 75.03
Polyurethane Resin 57029-46-6 2 0 0
Water 7732-18-5 85 0 0
ethylbenzene 100-41-4 1 0.00001615 15.006
copolymer of 2-propenamide 69418-26-4 20 0.0155186 14422.7
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00155186 1442.27
Fatty imidazoline 61790-69-0 5 0.00008073 75.03
isoproyl alcohol 67-63-0 5 0.00008073 75.03
xylene 1330-20-7 5 0.00008073 75.03
KFR-23 Keane Friction Reducer Water 7732-18-5 50 0.0387965 36056.7
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00155186 1442.27
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0155186 14422.7
oleic acid diethanolamide 93-83-4 2 0.00155186 1442.27
copolymer of 2-propenamide 69418-26-4 20 0.0155186 14422.7
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 7.5 0.0572911 53245.1
Water 7732-18-5 92.5 0.70659 656689
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.9918 12,074,300.0
Water JKLM Carrier/Base Fluid Water 7732-18-5 100 86.162 80,077,200.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2018 JKLM ENERGY LLC 1,051,406.00 242 0.00 0 0.00 0
2019 JKLM ENERGY LLC 713,220.00 318 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 JKLM ENERGY LLC Drill Cuttings 628.50 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Produced Fluid 448.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 359.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Drilling Fluid Waste 104.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 1,305.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 18.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 917.67 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drilling Fluid Waste 1,120.16 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drill Cuttings 1,426.66 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 18.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Synthetic Liner Materials 20.22 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid 364.67 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid 424.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Produced Fluid 7,213.72 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 37,017.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 173.35 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Drill Cuttings 17.29 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Unused Fracturing Fluid Waste 11.17 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 JKLM ENERGY LLC Synthetic Liner Materials 28.63 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 50.06 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Soil Contaminated by Oil & Gas Related Spills 58.44 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 2,333.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 980.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Produced Fluid 3,361.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Soil Contaminated by Oil 58.44 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3,355.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid 728.34 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 JKLM ENERGY LLC Produced Fluid 661.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 JKLM ENERGY LLC Drilling Fluid Waste 91.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 284.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Waste Water Treatment Sludge 10.08 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3.40 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3,015.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 80.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Produced Fluid 947.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 JKLM ENERGY LLC Synthetic Liner Materials 6.43 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 36.67 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Produced Fluid 1,646.66 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2499682 Primary Facility 2016-07-08 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Reese Hollow 115 well pad. JKLM, J.L. Watts and New Growth Resources present. Site will consist of a 350' x 500' well pad and improvement of an existing access road. New Growth Resources plans to begin logging/chipping operations in the next several days; J.L. Watts will begin site construction after clearing operations are completed. One permit, the Reese Hollow 115 4HU (105-21872) has been issued. Applications for the 1HU - 3HU, 5HU and 6HU are under review. TLT
2519945 Primary Facility 2016-09-16 Preoperation Inspection No Violations Noted Preoperation inspection prior to spudding 1HU - 6HU wells. Site construction is complete. E&S controls have been installed and disturbed areas seeded and mulched. TLT
2541208 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted
2548282 Primary Facility 2016-12-29 Routine/Partial Inspection No Violations Noted Partial inspection. The site was snow covered. Drilling of the 1HU - 6HU topholes was completed in November. Site is being used to store equipment and materials in anticipation of the arrival of the H&P 500 rig. Materials on site are stored in containment. Sediment traps were frozen over and snow covered. Some vegetation was visible above the snow cover on the topsoil stockpiles and well pad cut slope. No violations noted. TLT
2548988 Primary Facility 2016-12-28 Routine/Complete Inspection No Violations Noted
2580954 Primary Facility 2017-04-10 Routine/Complete Inspection No Violations Noted
2601578 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted
2621827 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted
2626427 Primary Facility 2017-08-10 Routine/Complete Inspection No Violations Noted
2665028 Primary Facility 2017-11-21 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected This inpsection was created in error; See inpsection 2665099 for the corrected report
2665099 Primary Facility 2017-11-21 Routine/Complete Inspection Violation(s) Noted A routine inspection was conducted at the JKLM Reese Hollow 115 well pad (ESX29-105-16-0003) located in Sweden Twp., Potter Co. on November 21, 2017 @1235 hours. Keane Group, Inc. was onsite conducting stimulation activities on the 6HU well (API#10521874). Scott West, a Consultant for JKLM, was present onsite for the inspection. Mr. West contacted Mr. Jon Manuel, he arrived onsite after fluid exhibiting high conductivity was discovered off containment.

Fluid was observed along the western side of the pad containment. The fluid level was up to the top of the rig matting. An Oakton Multi-Parameter PCSTestr 35 was used to test the field conductivity of the fluid in containment at "Or" or >20.00 mS/cm (see Photo#1). Photos #2 and #3 show the level of fluid in the primary containment. A puddle just off containment (see photo #4), on the west side of the pad, had a field tested conductivity of "Or" or >20.00 mS/cm (see photo #5).

The pollutional material was observed spilling out of the corner of the pad contain

2667115 Primary Facility 2017-12-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this well had been already simulated(hydraulic fractured). The stimulation for this well was started on 11/14/17 and finished on 12/2/17. No issues were noted during this stimulation.
2668838 Primary Facility 2017-12-07 Routine/Complete Inspection Outstanding Violations - Viols Req'd I arrived on site with Clark Smith of the Environmental Cleanups program and was met by Tyler McConnell of JKLM. We were there to follow up on the containment violations and release noted in an 11/21 inspection by Elizabeth Niles, WQS for the Oil & Gas program. We proceeded to the northwest corner of the pad to the level spreader and sediment trap where Ellie noted the high conductance fluid both in and outside the containment. We noted that the sediment trap had obviously been excavated to an unspecified depth; the water in the trap showed conductance of .63 mS/cm and had frozen enough to walk on. A small amount of slushy water (1-2 gallons) in the containment corner had conductance that read as "OR" on my meter (over 20 mS/cm). Tyler pointed out a vac truck in this area, and told us they had one on the opposite corner as well, as both spots were low spots where water collects. Tyler informed me that JKLM had had 2 of their employees on location during all operations since the incident, as well as uti
2671978 Primary Facility 2017-12-18 Administrative/File Review Violation(s) Noted Upon receipt and review of the operator response for the Notice of Violation cited for the release of regulated substance to the ground surface discovered during an inspection on November 21, 2017 the violation for 25 PA Code Section 78a.64a(d) has been revised. The violation 25 PA Code Section 78a.64a(d) has been closed and a violation has been cited against 25 PA Code Section 78a.64a(e); for failure to remove stormwater as soon as possible and prior to the capacity of second payment being reduced by 10 % or more.
2679747 Primary Facility 2018-01-08 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was hydraulically fractured (stimulated). The well was not producing and was not connected to a gas sales line. The 9 5/8" x 13 3/8" annulus was open and was tested with a gas meter with no gas detected. The 5 1/2" x 9 5/8" annulus was also vented but was shut and no gas was detected on this annulus at this inspection. No violations were noted at this inspection.
2693905 Primary Facility 2018-02-12 Routine/Complete Inspection Outstanding Violations - Viols Req'd The Department of Environmental Protection inspected the JKLM Reese Hollow 115 well pad located in Sweden Twp., Potter Co. on 2/12/2018 @1130 hours. Scott West, JKLM was present for the inspection. JKLM is in the process of pulling up the pad-wide containment. Approximately ¼ of the containment was remaining during the inspection. A large pile of snow was observed stockpiled on the remaining containment. Mr. West stated they are using two gas busters onsite to melt the snow. The recovered liquids are being stored in the Aboveground Storage Tank (AST) onsite, awaiting transfer to the frack at the Headwaters 145 site. Any recovered solids are being placed in residual waste containers awaiting transfer to a disposal facility.

Due to recent weather the pad surface is a mix of large puddles, ice and snow. The field conductivity of the large puddles at the center of the pad were ~2.0 mS/cm. A vac truck was in the process of removing the puddles. The standing fluid in the remaining containment had a field conducti

2703302 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was not in production. This well was temp. shut in for work being done on the annulus vents. The annulus vent lines on the following annulus 20x13,13x9 and 9x5 were being put in place on the wellhead assembly at the time of this inspection.
2711134 Primary Facility 2018-03-28 Administrative/File Review No Violations Noted The DEP reviewed the document titled "Final Report/Remedial Action Completion Report" for the JKLM Reese Hollow 115 brine release that occurred in November 2017. The final report was approved on March 9, 2018. The violations cited in inspections conducted by the DEP on November 21, 2017, December 7, 2017 and February 12, 2017 are closed. No violations remain outstanding at this time.
2719843 Primary Facility 2018-04-17 Routine/Complete Inspection No Violations Noted At the time of this inspection the well was stimulated(Hydraulic fractured) and was temp. shut-in. The well was being set up for production.
2721172 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted Some activity on pad when I arrived. Many puddles present on the pad, with conductivity ranging from .35-.90 mS/cm. AST still present on the pad, filled to within 8-9' of the top. Some water had collected in the secondary tank (4-6"); I recommend that it be vacced ASAP to maintain leak detection in this tank. I was unable to locate any well tags; I recommend that tags be affixed ASAP. If tags were present, I recommend that the tags be made more visible.
2736585 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At the time of this inspection flow back was ongoing
2742364 Primary Facility 2018-06-14 Routine/Complete Inspection No Violations Noted The DEP conducted a ROUTINE inspection of the JKLM – Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 6/14/2018 @1100 hours. The weather was 70 degrees, sunny, 38% humidity and winds WNW 20 mph. The site appears to be setup for flowback activity. The weekly E&S site inspection was last conducted on 6/14/2018 with the comment “housekeeping remains an issue”.

As of today’s inspection, numerous puddles were observed on the pad surface. Standing water was observed on the pad surface along the edge of the gas buster containment. The Electrical Conductivity was field measured With an Oakton Multiparameter PCSTestr and found to be 18.90mS/cm (see attached photo #3 and #4). A smaller “duck pond” containment was located ~1’ away from the gas buster containment. Fluid in the duck pond had a field measured conductivity of 6.72mS/cm(see photo #5). Fluid in the gas buster containment had a field measured conductivity of “Or” or >20.00 mS/cm (see photo #6). The volume is unknown, but it is estimated the rel

2748277 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The Flow back process(cleaning out the well of excess hydraulic fracturing water) had been completed. The annulus vent 9 5/8" x 5" detected a combustable gas reading. During a discussion with Jake Long ,a JKLM Engineer, he informed me that as a result of high pressures and temperatures going through the well during flow back it is not uncommon to see a combustable gas reading on different annulus vents until the well stabilizes the high pressures and temperatures. The gas %(percentage) reading is in the findings section of this inspection. Annulus vent monitoring will be ongoing until the well stabilizes its pressures and temperatures.
2759015 Primary Facility 2018-07-30 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. Flow back, the last part of well development before the well is put intoproduction ended on 6-12-18. Combustible gas was detected on the 9 3/8" x 13 5/8" annulus vent. This is not uncommon after flow back and going into production as residual flow back will continue for an unspecified amount of time . No violations were noted at this inspection.
2763199 Primary Facility 2018-08-09 Compliance Evaluation No Violations Noted The DEP conducted a Follow-Up Inspection (FUI) at the JKLM Reese Hollow 115 well site located in Sweden Twp., Potter Co. on 8/9/2018 @1030 hours. The weather was 74°, Sunny, Humidity 62%, winds WNW 8mph. Korey Starkey, DEP Env Trainee was present for the inspection.

The well pad is currently setup for flowback activities. A damp area and a small puddle were observed along the front edge of the gas buster containment. The electrical conductivity was field measured with an Oakton PCSTestr 50 and found to be 2.2 mS/cm(Photo#3). Fluid in the gas buster containment had a field measured conductivity of 1700 µS/cm. Numerous patches were observed in the gas buster containment(Photo#4). A vac truck driver onsite was notified of the puddle, exhibiting elevated conductivity, along the front edge of the gas buster containment and the fluid was removed. Puddles were observed around the “duck ponds” adjacent to the production fluid tank containment (Photo#5,6). The electrical conductivity was field measured with an Oak

2772131 Primary Facility 2018-09-06 Administrative/File Review Violation(s) Noted Administrative inspection created to cite an additional violation included in the Consent Assessment of Civil Penalty (Enforcment Record # 367242) not previously cited in an NOV, regarding the release of elevated conductivity fluid from containment on the Reese Hollow 115 well pad during drilling operations on the Reese Hollow 115 6HU gas well.
2803098 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. Annulus vent intermediate one (1) x intermediate two (2) ( 13 3/8" x 9 5/8") was noted venting 100% LEL (lower explosion limit) and 100% METHANE combustible gas at this inspection. Although the Intermediate 2 casing string was not cemented to surface under an approved alternate method, combustible gas detected at this annulus indicates potential defective cement. JKLM should monitor combustible gas levels at this annulus on a monthly basis and report any significant changes to the Department as soon as possible. No other annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2813889 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM - Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 12/11/2018 @1145 hours. The weather was 25 degrees, partly sunny, 2-4 inches of snow on the ground. Winds WSW @10mph, 68% humidity. NORtech personnel were present onsite during the inspection.

The well site appears to be setup for production. 6 wells were observed onsite. The pad surface was covered by snow and ice. No issues were observed. No new violations are noted at this time. I departed the site at 1245 hours.

The following violations remain OUTSTANDING against the 1H well from inspection report #2778074 dated 9/21/2018, awaiting approval of the Final Report/Remedial Action Completion Report from the ECB. 25 Pa Code 78a.56(a) regarding Temporary Storage 35 PS § 691.402 (Potential to Pollute Waters of then Commonwealth) 35 PS § 6018.301 SWMA

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2665028 802869 2017-11-21 2017-11-21 78a54 Environmental Health & Safety
2665099 802856 2017-11-21 2018-03-09 91.33(A) Environmental Health & Safety Failure to immediately notify the Department of a pollutional incident. Release discovered as the result of a routine inspection conducted by the DEP.
2665099 802857 2017-11-21 2018-03-09 CSL 402(b) Environmental Health & Safety Fluid exhibiting an elevated conductivity was released to the pad service in multiple areas with the potential to pollute Waters of the Commonwealth.
2665099 802858 2017-11-21 2018-03-09 SWMA 301 Environmental Health & Safety Failure to properly store, transport, process or dispose of a residual waste.
2665099 802859 2017-11-21 2018-03-09 OGA3218.2(A) Environmental Health & Safety Failure to design and construct unconventional well site to prevent spills to the ground surface and off well site.
2665099 802860 2017-11-21 2017-12-18 78A64A(D)__ Environmental Health & Safety Failure to provide adequate storage for precipitation in the primary containment, resulting in overtopping of the containment and a release to the pad surface.
2665099 802861 2017-11-21 2018-03-09 78a54 Environmental Health & Safety Operator failed to control and dispose of stimulation fluids.
2668838 803646 2017-12-08 2018-03-09 91.33(A) Environmental Health & Safety Outstanding violation
2668838 803647 2017-12-08 2018-03-09 OGA3218.2(A) Environmental Health & Safety Outstanding violation
2668838 803648 2017-12-07 2018-03-09 78a54 Environmental Health & Safety Outstanding violation
2668838 803649 2017-12-07 2018-03-09 SWMA 301 Environmental Health & Safety Outstanding violation
2668838 803650 2017-12-08 2018-03-09 78a64a(d) Environmental Health & Safety Outstanding violation
2668838 803651 2017-12-07 2018-03-09 CSL 402(b) Environmental Health & Safety Outstanding violation
2668838 812087 2017-12-07 2018-03-09 78A64A(E)___ Environmental Health & Safety Revised the violation previously cited
2668838 812088 2017-12-07 2018-03-09 CSL 402(b) Environmental Health & Safety Fluid exhibiting an elevated conductivity was released to the pad service in multiple areas with the potential to pollute Waters of the Commonwealth.
2668838 812089 2017-12-07 2018-03-09 91.33(A) Environmental Health & Safety Failure to immediately notify the Department of a pollutional incident. Release discovered as the result of a routine inspection conducted by the DEP.
2668838 812090 2017-12-07 2018-03-09 78a54 Environmental Health & Safety Operator failed to control and dispose of stimulation fluids.
2668838 812091 2017-12-07 2018-03-09 SWMA 301 Environmental Health & Safety Failure to properly store, transport, process or dispose of a residual waste.
2671978 804255 2017-12-18 2018-03-09 78A64A(E)___ Environmental Health & Safety Revised the violation previously cited
2693905 808192 2018-02-12 2018-03-09 CSL 402(b) Environmental Health & Safety Fluid exhibiting an elevated conductivity was released to the pad service in multiple areas with the potential to pollute Waters of the Commonwealth.
2693905 808193 2018-02-12 2018-03-09 91.33(A) Environmental Health & Safety Failure to immediately notify the Department of a pollutional incident. Release discovered as the result of a routine inspection conducted by the DEP.
2693905 808194 2018-02-12 2018-03-09 OGA3218.2(A) Environmental Health & Safety Failure to design and construct unconventional well site to prevent spills to the ground surface and off well site.
2693905 808195 2018-02-12 2018-03-09 78a54 Environmental Health & Safety Operator failed to control and dispose of stimulation fluids.
2693905 808196 2018-02-12 2018-03-09 SWMA 301 Environmental Health & Safety Failure to properly store, transport, process or dispose of a residual waste.
2693905 808197 2018-02-12 2018-03-09 78A64A(E)___ Environmental Health & Safety Revised the violation previously cited
2693905 812092 2018-02-12 2018-03-09 78A64A(E)___ Environmental Health & Safety Revised the violation previously cited
2772131 827228 2018-09-06 2018-09-06 78a64a(f) Environmental Health & Safety Additional violation not previously cited in NOV that was cited in the CACP.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
802856 359827 NOV - Notice of Violation 2018-09-06
802857 359827 NOV - Notice of Violation 2018-09-06
802857 367242 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-09-06 2018-09-06 $20,000.00 $20,000.00
802858 359827 NOV - Notice of Violation 2018-09-06
802858 367242 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-09-06 2018-09-06 $20,000.00 $20,000.00
802859 359827 NOV - Notice of Violation 2018-09-06
802859 367242 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-09-06 2018-09-06 $20,000.00 $20,000.00
802860 359827 NOV - Notice of Violation 2018-09-06
802861 359827 NOV - Notice of Violation 2018-09-06
802861 367242 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-09-06 2018-09-06 $20,000.00 $20,000.00
804255 359827 NOV - Notice of Violation 2018-09-06
804255 367242 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-09-06 2018-09-06 $20,000.00 $20,000.00
827228 367242 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-09-06 2018-09-06 $20,000.00 $20,000.00

For data sources see[8]

References