X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-21166

Well Details

Well ID: 37-115-21166
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 146670
Farm/Lease Name: T KROPA 1
License Status:
Spud Date:
Permit Date: 2013-03-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.651419
Longitude: -75.932683

For data sources see[1][2][3]

Well History

Date Event
2013-03-11 New Permit Application
2013-04-01 Performed Spud Operation
2013-04-25 Drilling Completion
2013-06-19 Perforation
2013-07-08 Performed Stimulation
2014-03-14 DEVIATED
2016-04-29 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-08 2013-07-14 7,600 4,569,680 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CS-500 SI FTSI Scale inhibitor Sodium Polyacrylate 9003-04-7 5 0.0015 0
Ethylene glycol 107-21-1 10 0.00301 0
Water 7732-18-5 55 0.01655 0
Sodium chloride 7647-14-5 6 0.0018 0
FRW-200 FTSI Friction reducer Sorbitan Monooleate 1338-43-8 3 0.0023 0
Water 7732-18-5 48 0.03681 0
Alkyloxypolyethyleneoxyethanol 84133-50-6 1 0.00077 0
Ammonium Acrylate 10604-69-0 0.5 0.00038 0
Polyethylene glycol monooleate 9004-96-0 3 0.0023 0
Proprietary Component Proprietary 1.5 0.00115 0
Sorbitol Tetraoleate 61723-83-9 2 0.00153 0
Acrylamide P/W acrylic acid, ammonium salt 26100-47-0 25 0.01917 0
Ammonium Chloride 12125-02-9 12 0.0092 0
Petroleum distillate hydrotreated light 64742-47-8 26 0.01994 0
Alcohols (C12-C16), ethoxylated 68551-12-2 4 0.00307 0
Alcohols (C12-C14), ethoxylated 68439-50-9 4 0.00307 0
Surfactant Proprietary 7 0.00537 0
Alcohols (C10-C16), ethoxylated 68002-97-1 4 0.00307 0
Acrylamide 79-06-1 0.1 0.00008000 0
Copolymer of acrylamide and sodium acrylate 25987-30-8 33 0.02531 0
40/70 White FTSI Proppant 40/70 White 14808-60-7 100 10.8421 0
100 Mesh Sand FTSI Proppant 100 Mesh Sand 14808-60-7 100 0.59774 0
Water Operator Carrier Water 7732-18-5 100 87.8848 0
FE-100L FTSI Iron control Citric acid 77-92-9 55 0.00092 0
Water 7732-18-5 60 0.00101 0
BIO-3240 FTSI Biocide Sodium Hydroxide 1310-73-2 23 0.00701 0
Water 7732-18-5 55 0.01676 0
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,
3, 5-thiadiazine-2-thione.
533-74-4 24 0.00731 0
Hydrochloric Acid (HCl) FTSI Acid Hydrogen Chloride 7647-01-0 15 0.08034 0
Water 7732-18-5 85 0.45524 0
CI-150 FTSI Acid Corrosion Inhibitor Fatty Acid Salt Proprietary 0.1 0.00001000 0
Isopropanol 67-63-0 30 0.00028 0
Aromatic aldehyde Proprietary 10 0.00009000 0
Dimethylformamide 68-12-2 10 0.00009000 0
Ethylene Glycol 107-21-1 30 0.00028 0
Diethylene glycol 111-46-6 1 0.00001000 0
Alkylene Oxide Block Polymer Proprietary 10 0.00009000 0
Aliphatic alcohol Proprietary 0.1 0.00001000 0
Quaternary ammonium compound Proprietary 10 0.00009000 0
Water 7732-18-5 5 0.00005000 0
Fatty Acid Proprietary 0.1 0.00001000 0
Organic amine resin salt Proprietary 30 0.00028 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-07-08 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CABOT OIL & GAS CORP 1,716,517.15 155 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,500,016.91 362 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 801,967.17 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 438,846.11 220 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 591,960.55 268 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 484,279.16 364 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 301,947.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 100.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 10,591.16 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 380.46 Tons LANDFILL 101247
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 206.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 465.71 Tons LANDFILL THR029
2013 CABOT OIL & GAS CORP Produced Fluid 138.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 3,388.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 31.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 2,420.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 4.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 259.22 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 388.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 186.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 1.27 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 313.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 1,219.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 133.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 119.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 255.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 1.50 Tons LANDFILL 101247

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2150060 Primary Facility 2013-03-21 Routine/Partial Inspection No Violations Noted
2159396 Primary Facility 2013-04-12 Drilling/Alteration No Violations Noted
2244566 Primary Facility 2014-01-27 Incident- Response to Accident or Event No Violations Noted Violations and details associated with this inspection can be referred to in the T Kropa 3H 1-27-14 inspection report. Permit number is 115-21167. E-facts identification number is 2244547.
2505853 Primary Facility 2016-07-29 Routine/Complete Inspection No Violations Noted
2513586 Primary Facility 2016-08-23 Drilling/Alteration No Violations Noted
2518578 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted
2525587 Primary Facility 2016-10-04 Routine/Complete Inspection No Violations Noted
2565987 Primary Facility 2017-02-22 Routine/Complete Inspection No Violations Noted The Department (Eric Rooney and I) stopped at the well site after finding that the road seemed to have been collecting sediment from vehicles leaving the site earlier in the day as we were en route to a meeting. At the time of our inspection, it was noted that it appeared as though the access road had recently been maintained. Additionally, it appeared as though sediment was no longer leaving the site in the amount it was prior.
2568339 Primary Facility 2017-02-24 Follow-up Inspection No Violations Noted The Department returned to the site to conduct a Follow-Up Inspection concerning the sediment being deposited on State Route 29. Ken Wilson (EHS Foreman -Cabot Completions) was on site and walked along the access road and SR 29 with me. I also met with Larry Fulmer (Frac Superintendent). We walked along the road and found that the sediment mentioned in the Department's 2/22/2017 inspection is still present. Mr. Wilson explained that they have added rock to an area adjacent to the access road and that they have been adding stone to the access road which has built it up.

While on site I explained that any sediment that originated from their site should be collected and returned to within their limits of disturbance (LOD) and stabilized. I requested that they come up with a plan to remove the sediment in a timely and safe manner. Mr. Wilson also explained that they will be relocating a small pile of sediment adjacent to their access road, near the base of the road, and stabilizing it.

2570091 Primary Facility 2017-03-08 Routine/Complete Inspection No Violations Noted I conducted a Follow-Up Inspection in response to Steve Watson's (Cabot) email dated 2/27/17 concerning the clean up of sediment accumulations along SR 29. Photos attached to the email were dated 2/24/17.
2659471 Primary Facility 2017-11-13 Routine/Complete Inspection No Violations Noted Arrived on location at: 10:00. Weather: Winter mix, Cold, ~ 35 degs. A total of (9) wells have been drilled on this pad, the Kropa, T. 1H, 3H, 4H, 5H, 6H, 7H, 8H, 9H and 10H. All wells were in production at time of inspection. All wells (13x9) and (9x5) annuli were open and venting, plumbed to a common vent tank. The 5H, 6H, 7H, 8H, 9H and 10H wells (20x13) annuli were also open and venting, plumbed to a common vent tank. A Gas check performed at the common annular vent tank showed 100% LEL, 100% CH4.

All wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units to onsite Total Flow Control Unit "TFCU". (See individual well insp. reports for pressures.) TFCU readings were taken off control panel at ~ 10:45. (SP= static press., CP= prod. casing press., DP= differential press.) - 1H: SP= 540 psi, CP= 545 psi., DP= 65 psi. Overall, wells and pad were found in good condition. No obvious concerns noted at time of inspection. No violations noted. Left location at 11:30.

2659846 Primary Facility 2017-11-13 Routine/Complete Inspection No Violations Noted Ken Kennedy (OGI) was on-site during the inspection. There was no activity occurring at the site during the inspection. No violations were noted. If you have any questions, please contact me.
2834514 Primary Facility 2019-01-23 Routine/Complete Inspection No Violations Noted I arrived on site at 1449 to conduct a site restoration inspection in response to a post-drilling site restoration report received from the Operator. The weather was ~38 degrees F and cloudy with moderate freezing rain. There was no activity onsite at the time of inspection. The pad surface was plowed but extremely icy.

Vegetative stabilization requirements were unable to be assessed due to snow cover. Another inspection will have to be conducted when the snow melts in order to determine whether the site meets the post-drilling restoration requirements.

No violations were noted. Please contact me with any questions.

For data sources see[9]

References