If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45913 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.374108,"lon":-79.786347,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: BELDEN | |
License Status: Active | |
Spud Date: 2015-08-31 | |
Permit Date: 2015-01-20 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.374108 | |
Longitude: -79.786347 |
Date | Event |
---|---|
2015-01-20 | New Permit Application |
2015-08-31 | Performed Spud Operation |
2015-09-02 | Drilling Completion |
2016-08-21 | Perforation |
2016-08-22 | Performed Stage 1 of Stimulation |
2016-08-22 | Performed Stage 2 of Stimulation |
2016-08-22 | Performed Stage 3 of Stimulation |
2016-08-22 | Performed Stage 4 of Stimulation |
2016-08-22 | Performed Stage 5 of Stimulation |
2016-08-22 | Performed Stage 6 of Stimulation |
2017-02-21 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-08-22 | 1 | SAND | 25,494 | 1,500 | 2,200 |
2016-08-22 | 2 | SAND | 25,494 | 1,100 | 1,000 |
2016-08-22 | 3 | SAND | 25,494 | 1,100 | 500 |
2016-08-22 | 4 | SAND | 25,494 | 1,100 | 500 |
2016-08-22 | 5 | SAND | 25,494 | 1,200 | 1,200 |
2016-08-22 | 6 | SAND | 25,494 | 1,700 | 1,500 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 13.51 | 50 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 328.25 | 122 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 356.06 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 493.46 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | Produced Fluid | 133.4 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 133.40 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,745.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 12.22 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,745.00 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 2,126.12 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 129.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 2,273.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 917.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 1,791.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 22.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 258.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 33.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2357913 | Primary Facility | 2015-04-01 | Routine/Complete Inspection | No Violations Noted | |
2403286 | Primary Facility | 2015-08-31 | Routine/Complete Inspection | No Violations Noted | |
2404139 | Primary Facility | 2015-09-02 | Administrative/File Review | No Violations Noted | |
2404975 | Primary Facility | 2015-09-02 | Routine/Complete Inspection | No Violations Noted | |
2406341 | Primary Facility | 2015-09-08 | Routine/Complete Inspection | No Violations Noted | |
2413542 | Primary Facility | 2015-10-06 | Routine/Complete Inspection | No Violations Noted | |
2413793 | Primary Facility | 2015-10-08 | Administrative/File Review | No Violations Noted | |
2512099 | Primary Facility | 2016-08-18 | Routine/Complete Inspection | No Violations Noted | |
2512158 | Primary Facility | 2016-08-19 | Drilling/Alteration | No Violations Noted | |
2512888 | Primary Facility | 2016-08-22 | Drilling/Alteration | No Violations Noted | |
2514048 | Primary Facility | 2016-08-23 | Routine/Complete Inspection | No Violations Noted | |
2516745 | Primary Facility | 2016-09-07 | Administrative/File Review | No Violations Noted | |
2547073 | Primary Facility | 2016-12-22 | Routine/Complete Inspection | No Violations Noted | |
2649518 | Primary Facility | 2017-10-19 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. The site is considered restored. |
2724836 | Primary Facility | 2018-04-30 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable with greater than 70% vegetative cover. There are no E&S issues. |
For data sources see[8]