If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-46041 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.399628,"lon":-79.771547,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: TAYLOR 5061 | |
License Status: Active | |
Spud Date: 2016-08-11 | |
Permit Date: 2015-09-18 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.399628 | |
Longitude: -79.771547 |
Date | Event |
---|---|
2015-09-18 | New Permit Application |
2016-08-11 | Performed Spud Operation |
2016-08-12 | Drilling Completion |
2016-09-01 | Performed Stage 1 of Stimulation |
2016-09-01 | Performed Stage 2 of Stimulation |
2016-09-01 | Performed Stage 3 of Stimulation |
2016-09-01 | Performed Stage 4 of Stimulation |
2016-09-01 | Performed Stage 5 of Stimulation |
2016-09-01 | Performed Stage 6 of Stimulation |
2016-12-12 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-09-01 | 1 | SAND | 0 | 2,500 | 3,500 |
2016-09-01 | 2 | SAND | 0 | 3,000 | 4,500 |
2016-09-01 | 3 | SAND | 0 | 2,500 | 500 |
2016-09-01 | 4 | SAND | 0 | 2,000 | 2,400 |
2016-09-01 | 5 | SAND | 0 | 0 | 0 |
2016-09-01 | 6 | SAND | 0 | 3,000 | 4,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | 0.00 | 0 | 385.52 | 122 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 361.92 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 217.60 | 365 | 0.00 | 0 |
2019 | CATALYST ENERGY INC | 0.00 | 0 | 143.00 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 653.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 33.33 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 653.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 33.33 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 1,509.05 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 1,056.67 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 273.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 568.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 73.33 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2501340 | Primary Facility | 2016-07-15 | Administrative/File Review | No Violations Noted | |
2506007 | Primary Facility | 2016-07-25 | Routine/Complete Inspection | No Violations Noted | |
2508274 | Primary Facility | 2016-08-04 | Routine/Complete Inspection | No Violations Noted | |
2509766 | Primary Facility | 2016-08-08 | Routine/Complete Inspection | No Violations Noted | |
2509774 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | |
2509789 | Primary Facility | 2016-08-11 | Drilling/Alteration | No Violations Noted | |
2512079 | Primary Facility | 2016-08-12 | Routine/Complete Inspection | No Violations Noted | |
2517828 | Primary Facility | 2016-09-09 | Routine/Complete Inspection | No Violations Noted | |
2520157 | Primary Facility | 2016-09-20 | Administrative/File Review | No Violations Noted | |
2526251 | Primary Facility | 2016-10-06 | Routine/Complete Inspection | No Violations Noted | |
2530473 | Primary Facility | 2016-10-21 | Routine/Complete Inspection | No Violations Noted | |
2541107 | Primary Facility | 2016-11-30 | Site Restoration | No Violations Noted | |
2545488 | Primary Facility | 2016-12-16 | Routine/Complete Inspection | No Violations Noted | |
2552146 | Primary Facility | 2017-01-12 | Routine/Partial Inspection | No Violations Noted | |
2557609 | Primary Facility | 2017-02-01 | Routine/Complete Inspection | No Violations Noted | |
2563908 | Primary Facility | 2017-02-22 | Routine/Complete Inspection | No Violations Noted | On site for a routine inspection. The well is producing, labeled, and the annulus is plumbed into a tank. The well site is stable and has greater than 70% vegetative cover. The E&S issues noted in the inspection report should be addressed. |
2581025 | Primary Facility | 2017-04-10 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented into a tank. The access roads are dry but rutted. The well site has greater than 70% vegetative cover and is stable. The area of the stone pit has not been reclaimed. |
2604652 | Primary Facility | 2017-06-15 | Routine/Complete Inspection | No Violations Noted | Onsite form a routine inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is stable. There are no E&S issues. |
2627214 | Primary Facility | 2017-08-16 | Site Restoration | No Violations Noted | Onsite for a restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater than 70% vegetative cover and is permanently stabilized. There are no E&S issues. The site is considered restored. |
2695538 | Primary Facility | 2018-02-09 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is frozen and snow covered. There are no E&S issues. |
2818976 | Primary Facility | 2018-12-18 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is stable with greater than 70% vegetative cover. There are no E&S issues. |
2849597 | Primary Facility | 2019-02-22 | Routine/Complete Inspection | No Violations Noted | Onste for a routine inspection. The well is producing, labeled, and the annulus is vented. Site is stable and snow covered. There are no E&S issues. |
For data sources see[8]