If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47225 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.657333,"lon":-79.002333,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 409 | |
License Status: Active | |
Spud Date: 2013-09-05 | |
Permit Date: 2013-05-13 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.657333 | |
Longitude: -79.002333 |
Date | Event |
---|---|
2013-05-13 | New Permit Application |
2013-09-02 | Perforation |
2013-09-04 | Performed Spud Operation |
2013-09-09 | Drilling Completion |
2013-09-20 | Perforation |
2013-09-24 | Performed Stage 1 of Stimulation |
2013-09-24 | Performed Stage 10 of Stimulation |
2013-09-24 | Performed Stage 11 of Stimulation |
2013-09-24 | Performed Stage 12 of Stimulation |
2013-09-24 | Performed Stage 13 of Stimulation |
2013-09-24 | Performed Stage 14 of Stimulation |
2013-09-24 | Performed Stage 15 of Stimulation |
2013-09-24 | Performed Stage 16 of Stimulation |
2013-09-24 | Performed Stage 17 of Stimulation |
2013-09-24 | Performed Stage 18 of Stimulation |
2013-09-24 | Performed Stage 19 of Stimulation |
2013-09-24 | Performed Stage 2 of Stimulation |
2013-09-24 | Performed Stage 20 of Stimulation |
2013-09-24 | Performed Stage 3 of Stimulation |
2013-09-24 | Performed Stage 4 of Stimulation |
2013-09-24 | Performed Stage 5 of Stimulation |
2013-09-24 | Performed Stage 6 of Stimulation |
2013-09-24 | Performed Stage 7 of Stimulation |
2013-09-24 | Performed Stage 8 of Stimulation |
2013-09-24 | Performed Stage 9 of Stimulation |
2019-04-02 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-09-24 | 1 | Ottawa | 145,110 | 1,500 | 2,200 |
2013-09-24 | 2 | Ottawa | 145,110 | 1,600 | 2,300 |
2013-09-24 | 3 | Ottawa | 145,110 | 1,700 | 2,000 |
2013-09-24 | 4 | Ottawa | 145,110 | 2,000 | 3,400 |
2013-09-24 | 5 | Ottawa | 145,110 | 2,000 | 3,700 |
2013-09-24 | 6 | Ottawa | 145,110 | 2,300 | 3,200 |
2013-09-24 | 7 | Ottawa | 145,110 | 3,000 | 3,700 |
2013-09-24 | 8 | Ottawa | 145,110 | 2,200 | 2,700 |
2013-09-24 | 9 | Ottawa | 145,110 | 2,200 | 2,800 |
2013-09-24 | 10 | Ottawa | 145,110 | 3,600 | 2,800 |
2013-09-24 | 11 | Ottawa | 145,110 | 2,100 | 2,900 |
2013-09-24 | 12 | Ottawa | 145,110 | 2,500 | 2,700 |
2013-09-24 | 13 | Ottawa | 145,110 | 3,000 | 3,400 |
2013-09-24 | 14 | Ottawa | 145,110 | 2,800 | 4,000 |
2013-09-24 | 15 | Ottawa | 145,110 | 3,600 | 4,000 |
2013-09-24 | 16 | Ottawa | 145,110 | 2,600 | 4,000 |
2013-09-24 | 17 | Ottawa | 145,110 | 2,600 | 3,400 |
2013-09-24 | 18 | Ottawa | 145,110 | 2,800 | 4,100 |
2013-09-24 | 19 | Ottawa | 145,110 | 2,800 | 4,100 |
2013-09-24 | 20 | Ottawa | 145,110 | 2,800 | 4,100 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CAMERON ENERGY CO | 325.8 | 365 | 383.53 | 365 | 0 | 365 |
2014 | CAMERON ENERGY CO | 125.07 | 365 | 348.61 | 365 | 0 | 365 |
2015 | CAMERON ENERGY CO | 144.72 | 365 | 171.33 | 365 | 0 | 365 |
2016 | CAMERON ENERGY CO | 412.5 | 365 | 204.75 | 365 | 0 | 365 |
2017 | CAMERON ENERGY CO | 501.89 | 365 | 177.98 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 538.96 | 365 | 159.75 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CAMERON ENERGY CO | Fracing Fluid Waste | 10.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CAMERON ENERGY CO | Produced Fluid | 35.73 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CAMERON ENERGY CO | Produced Fluid | 26.13 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CAMERON ENERGY CO | Produced Fluid | 6.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 20.64 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Fracing Fluid Waste | 1.39 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CAMERON ENERGY CO | Produced Fluid | 15.06 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | CAMERON ENERGY CO | Produced Fluid | 4.89 Bbl | ROAD SPREADING | |
2016 | CAMERON ENERGY CO | Produced Fluid | 13.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 49.44 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 40.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 8.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 18.62 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 6.90 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2172328 | Primary Facility | 2013-06-06 | Administrative/File Review | No Violations Noted | |
2266160 | Primary Facility | 2014-04-16 | Routine/Complete Inspection | No Violations Noted | |
2412031 | Primary Facility | 2015-09-22 | Site Restoration | No Violations Noted | |
2824834 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]