If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47469 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.815633,"lon":-79.156542,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Pleasant Township | |
Operator Name: BAILEY & HOLDEN ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: ORTH B 15 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-11-01 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.815633 | |
Longitude: -79.156542 |
Date | Event |
---|---|
2013-11-01 | New Permit Application |
2014-07-08 | Performed Spud Operation |
2014-07-21 | Perforation |
2014-07-22 | Drilling Completion |
2015-02-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | BAILEY & HOLDEN ENERGY LLC | 328.00 | 198 | 174.55 | 198 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | BAILEY & HOLDEN ENERGY LLC | Produced Fluid | 45.45 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2286606 | Primary Facility | 2014-07-10 | Drilling/Alteration | No Violations Noted | |
2289810 | Primary Facility | 2014-07-22 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being fraced at the time of inspection. The operator was on stage 6 of an 18 stage frac. Fluids were contained in a lined pit on the lower side of the location and were being recirculated into frac tank. The location was stable but will need additional mulching. No violations noted at this time. |
2331964 | Primary Facility | 2014-10-01 | Administrative/File Review | Violation(s) Noted | |
2331967 | Primary Facility | 2014-10-01 | Administrative/File Review | Violation(s) Noted | |
2335090 | Primary Facility | 2015-01-13 | Administrative/File Review | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2331964 | 713165 | 10/01/2014 | 2014-10-01 | OGA 3222(B) - Failure to submit well record / completion report. | Administrative | Well record not submitted within 30 days of cessation of drilling. |
2331967 | 713167 | 10/01/2014 | 2014-10-01 | OGA 3222(B) - Failure to submit well record / completion report. | Administrative | Completion Report not submitted within 30 days after completion of the well. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
713165 | 318671 | NOV - Notice of Violation | Comply/Closed | 2014-10-01 | |||
713167 | 318671 | NOV - Notice of Violation | Comply/Closed | 2014-10-01 |
For data sources see[7]