If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-47896 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.635194,"lon":-79.067944,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: WARRANT 2877 | |
License Status: Active | |
Spud Date: 2016-09-27 | |
Permit Date: 2015-09-29 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.635194 | |
Longitude: -79.067944 |
Date | Event |
---|---|
2015-09-29 | New Permit Application |
2016-09-27 | Performed Spud Operation |
2016-09-30 | Drilling Completion |
2016-10-31 | Perforation |
2016-11-02 | Performed Stage 1 of Stimulation |
2016-11-02 | Performed Stage 10 of Stimulation |
2016-11-02 | Performed Stage 11 of Stimulation |
2016-11-02 | Performed Stage 12 of Stimulation |
2016-11-02 | Performed Stage 13 of Stimulation |
2016-11-02 | Performed Stage 14 of Stimulation |
2016-11-02 | Performed Stage 15 of Stimulation |
2016-11-02 | Performed Stage 2 of Stimulation |
2016-11-02 | Performed Stage 3 of Stimulation |
2016-11-02 | Performed Stage 4 of Stimulation |
2016-11-02 | Performed Stage 5 of Stimulation |
2016-11-02 | Performed Stage 6 of Stimulation |
2016-11-02 | Performed Stage 7 of Stimulation |
2016-11-02 | Performed Stage 8 of Stimulation |
2016-11-02 | Performed Stage 9 of Stimulation |
2019-05-07 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-11-02 | 1 | Ottawa | 31,342 | 1,500 | 3,000 |
2016-11-02 | 2 | Ottawa | 31,342 | 1,700 | 3,800 |
2016-11-02 | 3 | Ottawa | 31,342 | 1,800 | 4,000 |
2016-11-02 | 4 | Ottawa | 31,342 | 1,700 | 2,500 |
2016-11-02 | 5 | Ottawa | 31,342 | 1,700 | 3,200 |
2016-11-02 | 6 | Ottawa | 31,342 | 2,300 | 3,100 |
2016-11-02 | 7 | Ottawa | 31,342 | 2,500 | 2,800 |
2016-11-02 | 8 | Ottawa | 31,342 | 1,900 | 2,500 |
2016-11-02 | 9 | Ottawa | 31,342 | 2,300 | 3,500 |
2016-11-02 | 10 | Ottawa | 31,342 | 1,800 | 4,000 |
2016-11-02 | 11 | Ottawa | 31,342 | 2,500 | 2,500 |
2016-11-02 | 12 | Ottawa | 31,342 | 3,500 | 4,000 |
2016-11-02 | 13 | Ottawa | 31,342 | 2,000 | 3,000 |
2016-11-02 | 14 | Ottawa | 31,342 | 2,400 | 4,000 |
2016-11-02 | 15 | Ottawa | 31,342 | 2,300 | 4,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | CAMERON ENERGY CO | 194.08 | 365 | 255.80 | 365 | 0 | 365 |
2017 | CAMERON ENERGY CO | 153.29 | 365 | 278.73 | 365 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 100.71 | 365 | 297.76 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CAMERON ENERGY CO | Fracturing Fluid Waste | 4.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CAMERON ENERGY CO | Produced Fluid | 33.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 111.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CAMERON ENERGY CO | Produced Fluid | 35.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 17.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 35.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 29.09 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 10.91 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2424409 | Primary Facility | 2015-11-09 | Routine/Complete Inspection | No Violations Noted | Conventional oil well. The location has been built but not yet stabillized. No violations at this time but will contact the operator |
2523084 | Primary Facility | 2016-09-27 | Drilling/Alteration | No Violations Noted | |
2523610 | Primary Facility | 2016-09-29 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being drilled. A rig was on site and the operator was in the process of installing surface casing at the time of inspection.. Drill cuttings were "dusted" into an unlined pit. The location appeared stable. No violations noted at this time |
2527645 | Primary Facility | 2016-09-29 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being drilled.The operator was in the process of installing surface casing at the time of inspection. Drill cuttings were being directed into an unlined pit. The well location and access road were vegetated and stable. No violations noted at this time |
2535748 | Primary Facility | 2016-11-02 | Routine/Complete Inspection | No Violations Noted | Conventional oil well in the process of being fraced. The operator was on stage 4 of a 20 stage frac. Fluids were being directed into a lined pit. All fluids appeared contained. No violations noted at this time. |
2535785 | Primary Facility | 2016-11-02 | Routine/Complete Inspection | No Violations Noted | |
2537908 | Primary Facility | 2016-11-17 | Routine/Complete Inspection | No Violations Noted | |
2538132 | Primary Facility | 2016-11-21 | Administrative/File Review | No Violations Noted | |
2538135 | Primary Facility | 2016-11-21 | Administrative/File Review | No Violations Noted | |
2553868 | Primary Facility | 2017-01-18 | Routine/Complete Inspection | No Violations Noted | Conventional oil well recently completed and operational at the time of inspection. The pit has been properly closed and the location has been seeded and mulched. No violations noted at this time |
2600655 | Primary Facility | 2017-06-05 | Site Restoration | No Violations Noted | Conventional oil well completed and in production. The pit has been properly closed and there is adequate vegetative cover. No leaks or spills. There are no violations noted. The site meets restoration requirements |
2824716 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]