If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48082 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.627694,"lon":-79.006028,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: DAVIS LOT 7 | |
License Status: Active | |
Spud Date: 2018-11-29 | |
Permit Date: 2017-06-08 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.627694 | |
Longitude: -79.006028 |
Date | Event |
---|---|
2017-06-08 | New Permit Application |
2017-11-29 | Performed Spud Operation |
2017-12-21 | Drilling Completion |
2018-05-15 | Perforation |
2018-05-15 | Performed Stage 1 of Stimulation |
2018-05-15 | Performed Stage 10 of Stimulation |
2018-05-15 | Performed Stage 11 of Stimulation |
2018-05-15 | Performed Stage 12 of Stimulation |
2018-05-15 | Performed Stage 13 of Stimulation |
2018-05-15 | Performed Stage 14 of Stimulation |
2018-05-15 | Performed Stage 15 of Stimulation |
2018-05-15 | Performed Stage 16 of Stimulation |
2018-05-15 | Performed Stage 17 of Stimulation |
2018-05-15 | Performed Stage 18 of Stimulation |
2018-05-15 | Performed Stage 2 of Stimulation |
2018-05-15 | Performed Stage 3 of Stimulation |
2018-05-15 | Performed Stage 4 of Stimulation |
2018-05-15 | Performed Stage 5 of Stimulation |
2018-05-15 | Performed Stage 6 of Stimulation |
2018-05-15 | Performed Stage 7 of Stimulation |
2018-05-15 | Performed Stage 8 of Stimulation |
2018-05-15 | Performed Stage 9 of Stimulation |
2019-04-25 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-05-15 | 1 | Ottawa | 154,266 | 1,500 | 2,800 |
2018-05-15 | 2 | Ottawa | 154,266 | 1,500 | 2,300 |
2018-05-15 | 3 | Ottawa | 154,266 | 1,600 | 4,000 |
2018-05-15 | 4 | Ottawa | 154,266 | 2,100 | 4,000 |
2018-05-15 | 5 | Ottawa | 154,266 | 1,800 | 3,500 |
2018-05-15 | 6 | Ottawa | 154,266 | 1,700 | 3,200 |
2018-05-15 | 7 | Ottawa | 154,266 | 2,500 | 2,500 |
2018-05-15 | 8 | Ottawa | 154,266 | 2,800 | 2,700 |
2018-05-15 | 9 | Ottawa | 154,266 | 2,600 | 2,300 |
2018-05-15 | 10 | Ottawa | 154,266 | 2,400 | 2,400 |
2018-05-15 | 11 | Ottawa | 154,266 | 2,500 | 2,800 |
2018-05-15 | 12 | Ottawa | 154,266 | 1,900 | 2,400 |
2018-05-15 | 13 | Ottawa | 154,266 | 2,100 | 2,700 |
2018-05-15 | 14 | Ottawa | 154,266 | 2,200 | 2,400 |
2018-05-15 | 15 | Ottawa | 154,266 | 2,800 | 2,500 |
2018-05-15 | 16 | Ottawa | 154,266 | 2,800 | 3,900 |
2018-05-15 | 17 | Ottawa | 154,266 | 2,800 | 2,700 |
2018-05-15 | 18 | Ottawa | 154,266 | 3,200 | 3,100 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CAMERON ENERGY CO | 434.56 | 365 | 77.34 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 7.27 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 5.87 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 18.88 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 3.50 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2664565 | Primary Facility | 2017-11-28 | Drilling/Alteration | No Violations Noted | Drilling rig set up on location. Equipment necessary for drilling is on site. Drilling has not yet commenced. A temporary drill pit has been constructed for containment of drill cuttings. |
2666314 | Primary Facility | 2017-12-01 | Drilling/Alteration | No Violations Noted | Drilling top hole section of wellbore at this time. 8" bore will be drilled to 588'. Surface casing will be run to this depth and cemented on Tuesday 12/05. Drill cuttings contained in atemporary drill pit. |
2669474 | Primary Facility | 2017-12-04 | Routine/Partial Inspection | No Violations Noted | Drilling operations were underway on this well during this inspection. |
2670445 | Primary Facility | 2017-12-13 | Drilling/Alteration | No Violations Noted | Received notification from operator on 12/07/2017 regarding a possible defective surface casing cement job. A downhole camera was run inside of casing and a tight spot was observed at approximately 330'. Casing was swedged out with a 6 1/4" drill bit. Cement was not returned on surface casing. Production casing will be set on a packer with the annulus vented to remain consistent with 78.83b(a)(2). Surface casing was pressure tested as required by 78.84(d)(1), with no decrease in pressure. Drilling will resume tomorrow, 12/14/2017. |
2673725 | Primary Facility | 2017-12-14 | Routine/Complete Inspection | No Violations Noted | Drilling operations continue on this well at the time of this inspection. |
2675846 | Primary Facility | 2017-12-28 | Routine/Complete Inspection | No Violations Noted | This well has been drilled and the well is currently shut in. There was no activity on site during this inspection. |
2697999 | Primary Facility | 2018-02-26 | Administrative/File Review | No Violations Noted | |
2731697 | Primary Facility | 2018-05-17 | Routine/Complete Inspection | No Violations Noted | Crews are currently in the process of stimulating this well. |
2753505 | Primary Facility | 2018-07-19 | Administrative/File Review | No Violations Noted | |
2812920 | Primary Facility | 2018-12-11 | Administrative/File Review | No Violations Noted |
For data sources see[8]