If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48098 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.652611,"lon":-79.001667,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 409 | |
License Status: Active | |
Spud Date: 2018-07-13 | |
Permit Date: 2017-08-16 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.652611 | |
Longitude: -79.001667 |
Date | Event |
---|---|
2017-08-16 | New Permit Application |
2018-07-13 | Performed Spud Operation |
2018-07-27 | Drilling Completion |
2018-08-20 | Performed Stage 1 of Stimulation |
2018-08-20 | Performed Stage 10 of Stimulation |
2018-08-20 | Performed Stage 11 of Stimulation |
2018-08-20 | Performed Stage 12 of Stimulation |
2018-08-20 | Performed Stage 13 of Stimulation |
2018-08-20 | Performed Stage 2 of Stimulation |
2018-08-20 | Performed Stage 3 of Stimulation |
2018-08-20 | Performed Stage 4 of Stimulation |
2018-08-20 | Performed Stage 5 of Stimulation |
2018-08-20 | Performed Stage 6 of Stimulation |
2018-08-20 | Performed Stage 7 of Stimulation |
2018-08-20 | Performed Stage 8 of Stimulation |
2018-08-20 | Performed Stage 9 of Stimulation |
2018-08-21 | Performed Stage 14 of Stimulation |
2019-03-21 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-08-20 | 1 | Ottawa Sand | 29,106 | 1,900 | 2,400 |
2018-08-20 | 2 | Ottawa Sand | 29,106 | 2,200 | 2,800 |
2018-08-20 | 3 | Ottawa Sand | 29,106 | 2,200 | 3,000 |
2018-08-20 | 4 | Ottawa Sand | 29,106 | 1,900 | 2,000 |
2018-08-20 | 5 | Ottawa Sand | 29,106 | 2,500 | 2,200 |
2018-08-20 | 6 | Ottawa Sand | 29,106 | 2,300 | 2,800 |
2018-08-20 | 7 | Ottawa Sand | 29,106 | 2,400 | 4,000 |
2018-08-20 | 8 | Ottawa Sand | 29,106 | 2,400 | 3,600 |
2018-08-20 | 9 | Ottawa Sand | 29,106 | 2,300 | 3,500 |
2018-08-20 | 10 | Ottawa Sand | 29,106 | 2,200 | 2,200 |
2018-08-20 | 11 | Ottawa Sand | 29,106 | 3,000 | 3,400 |
2018-08-20 | 12 | Ottawa Sand | 29,106 | 2,100 | 3,300 |
2018-08-20 | 13 | Ottawa Sand | 29,106 | 2,400 | 3,500 |
2018-08-21 | 14 | Ottawa Sand | 29,106 | 2,400 | 3,500 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | 538.96 | 365 | 159.75 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 8.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CAMERON ENERGY CO | Produced Fluid | 40.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 18.62 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 6.90 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2752377 | Primary Facility | 2018-07-17 | Drilling/Alteration | No Violations Noted | Top hole has been drilled to total depth. 11' of rat hole has been drilled below casing seat. Conditioning well bore for cementing at this time. Casing will be run and cemented tomorrow at a depth of 546'. Drill cuttings contained in a temporary drill pit. |
2759111 | Primary Facility | 2018-08-01 | Routine/Complete Inspection | No Violations Noted | Recently drilled well, there is no activity on site at this time. |
2772582 | Primary Facility | 2018-09-05 | Routine/Complete Inspection | No Violations Noted | Recently completed well that is equipped with a pump jack and site ID sign. |
2787041 | Primary Facility | 2018-10-11 | Administrative/File Review | No Violations Noted | |
2812928 | Primary Facility | 2018-12-11 | Administrative/File Review | No Violations Noted |
For data sources see[8]