If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48137 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.640222,"lon":-78.982444,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: LOT 8 8 98 | |
License Status: Active | |
Spud Date: 2018-10-03 | |
Permit Date: 2018-03-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.640222 | |
Longitude: -78.982444 |
Date | Event |
---|---|
2018-03-06 | New Permit Application |
2018-10-03 | Performed Spud Operation |
2018-10-15 | Drilling Completion |
2018-10-29 | Perforation |
2018-11-01 | Performed Stage 1 of Stimulation |
2018-11-01 | Performed Stage 10 of Stimulation |
2018-11-01 | Performed Stage 11 of Stimulation |
2018-11-01 | Performed Stage 12 of Stimulation |
2018-11-01 | Performed Stage 13 of Stimulation |
2018-11-01 | Performed Stage 14 of Stimulation |
2018-11-01 | Performed Stage 15 of Stimulation |
2018-11-01 | Performed Stage 16 of Stimulation |
2018-11-01 | Performed Stage 2 of Stimulation |
2018-11-01 | Performed Stage 3 of Stimulation |
2018-11-01 | Performed Stage 4 of Stimulation |
2018-11-01 | Performed Stage 5 of Stimulation |
2018-11-01 | Performed Stage 6 of Stimulation |
2018-11-01 | Performed Stage 7 of Stimulation |
2018-11-01 | Performed Stage 8 of Stimulation |
2018-11-01 | Performed Stage 9 of Stimulation |
2019-03-21 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-11-01 | 1 | Ottawa | 34,671 | 1,700 | 3,000 |
2018-11-01 | 2 | Ottawa | 34,671 | 3,600 | 3,000 |
2018-11-01 | 3 | Ottawa | 34,671 | 2,500 | 3,000 |
2018-11-01 | 4 | Ottawa | 34,671 | 2,100 | 3,000 |
2018-11-01 | 5 | Ottawa | 34,671 | 2,400 | 3,100 |
2018-11-01 | 6 | Ottawa | 34,671 | 2,700 | 3,800 |
2018-11-01 | 7 | Ottawa | 34,671 | 2,400 | 3,800 |
2018-11-01 | 8 | Ottawa | 34,671 | 2,400 | 3,800 |
2018-11-01 | 9 | Ottawa | 34,671 | 2,400 | 3,800 |
2018-11-01 | 10 | Ottawa | 34,671 | 2,400 | 3,800 |
2018-11-01 | 11 | Ottawa | 34,671 | 2,200 | 2,300 |
2018-11-01 | 12 | Ottawa | 34,671 | 2,300 | 2,600 |
2018-11-01 | 13 | Ottawa | 34,671 | 2,400 | 3,000 |
2018-11-01 | 14 | Ottawa | 34,671 | 2,500 | 3,200 |
2018-11-01 | 15 | Ottawa | 34,671 | 2,400 | 3,000 |
2018-11-01 | 16 | Ottawa | 34,671 | 2,700 | 4,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | 156.67 | 365 | 162.64 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | Produced Fluid | 26.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | CAMERON ENERGY CO | Produced Fluid | 11.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2784342 | Primary Facility | 2018-10-04 | Drilling/Alteration | No Violations Noted | Top hole section of wellbore has been drilled in to its total depth. Surface casing will be run today and cemented tomorrow. Drill cuttings are contained in a temporary drill pit. |
2786716 | Primary Facility | 2018-10-10 | Routine/Complete Inspection | No Violations Noted | The drilling rig is setup on this well, there is no activity on location at this time. |
2802170 | Primary Facility | 2018-11-08 | Routine/Complete Inspection | No Violations Noted | Recently completed well that is currently shut in and has been equipped with rods and tubing. |
2803311 | Primary Facility | 2018-11-15 | Administrative/File Review | No Violations Noted | |
2824882 | Primary Facility | 2019-01-10 | Administrative/File Review | No Violations Noted |
For data sources see[8]