If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-123-48191 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.631639,"lon":-79.004556,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Warren | |
Municipality: Sheffield Township | |
Operator Name: CAMERON ENERGY CO | |
Well Pad ID: | |
Farm/Lease Name: DAVIS LOT 7 | |
License Status: Active | |
Spud Date: 2018-12-11 | |
Permit Date: 2018-07-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.631639 | |
Longitude: -79.004556 |
Date | Event |
---|---|
2018-07-06 | New Permit Application |
2018-12-11 | Performed Spud Operation |
2018-12-20 | Drilling Completion |
2019-01-11 | Perforation |
2019-01-16 | Performed Stage 1 of Stimulation |
2019-01-16 | Performed Stage 10 of Stimulation |
2019-01-16 | Performed Stage 11 of Stimulation |
2019-01-16 | Performed Stage 12 of Stimulation |
2019-01-16 | Performed Stage 13 of Stimulation |
2019-01-16 | Performed Stage 14 of Stimulation |
2019-01-16 | Performed Stage 15 of Stimulation |
2019-01-16 | Performed Stage 2 of Stimulation |
2019-01-16 | Performed Stage 3 of Stimulation |
2019-01-16 | Performed Stage 4 of Stimulation |
2019-01-16 | Performed Stage 5 of Stimulation |
2019-01-16 | Performed Stage 6 of Stimulation |
2019-01-16 | Performed Stage 7 of Stimulation |
2019-01-16 | Performed Stage 8 of Stimulation |
2019-01-16 | Performed Stage 9 of Stimulation |
2019-05-28 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2019-01-16 | 1 | Ottawa | 32,928 | 1,500 | 2,500 |
2019-01-16 | 2 | Ottawa | 32,928 | 1,800 | 2,400 |
2019-01-16 | 3 | Ottawa | 32,928 | 2,200 | 2,500 |
2019-01-16 | 4 | Ottawa | 32,928 | 2,100 | 4,000 |
2019-01-16 | 5 | Ottawa | 32,928 | 2,000 | 3,700 |
2019-01-16 | 6 | Ottawa | 32,928 | 2,700 | 3,400 |
2019-01-16 | 7 | Ottawa | 32,928 | 3,300 | 3,800 |
2019-01-16 | 8 | Ottawa | 32,928 | 1,900 | 2,600 |
2019-01-16 | 9 | Ottawa | 32,928 | 1,800 | 2,500 |
2019-01-16 | 10 | Ottawa | 32,928 | 2,000 | 2,500 |
2019-01-16 | 11 | Ottawa | 32,928 | 2,100 | 2,500 |
2019-01-16 | 12 | Ottawa | 32,928 | 2,400 | 2,500 |
2019-01-16 | 13 | Ottawa | 32,928 | 2,800 | 2,600 |
2019-01-16 | 14 | Ottawa | 32,928 | 2,900 | 2,700 |
2019-01-16 | 15 | Ottawa | 32,928 | 3,300 | 3,000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | CAMERON ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2019 | CAMERON ENERGY CO | Unused Fracturing Fluid Waste | 3.50 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2019 | CAMERON ENERGY CO | Produced Fluid | 18.88 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2815622 | Primary Facility | 2018-12-14 | Drilling/Alteration | No Violations Noted | Preparing to cement surface casing at this time. Total depth of well bore is anticipated at 2125'. Drill cuttings are contained in a temporary drill pit. |
2818872 | Primary Facility | 2018-12-24 | Routine/Complete Inspection | No Violations Noted | Recently drilled well that is currently shut in. There is no activity on the lease at this time. |
2833059 | Primary Facility | 2019-01-29 | Routine/Complete Inspection | No Violations Noted | Recently completed well that is equipped with rods and tubing. The well is currently shut in. |
For data sources see[8]