X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27229

Well Details

Well ID: 37-125-27229
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Somerset Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 145010
Farm/Lease Name: BIG DADDY SHAW
License Status: Active
Spud Date: 2014-01-15
Permit Date: 2013-12-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.116706
Longitude: -80.074714

For data sources see[1][2][3]

Well History

Date Event
2013-12-30 New Permit Application
2014-01-13 Performed Spud Operation
2014-02-08 Drilling Completion
2014-04-19 Drilling Completion
2014-06-29 Perforation
2014-08-04 Perforation
2014-08-11 Performed Stage 1 of Stimulation
2014-08-12 Perforation
2014-08-12 Performed Stage 2 of Stimulation
2014-08-12 Performed Stage 3 of Stimulation
2014-08-12 Performed Stage 4 of Stimulation
2014-08-13 Performed Stage 5 of Stimulation
2014-08-25 Perforation
2014-08-25 Performed Stage 6 of Stimulation
2014-08-26 Perforation
2014-08-26 Performed Stage 7 of Stimulation
2014-08-27 Perforation
2014-08-27 Performed Stage 10 of Stimulation
2014-08-27 Performed Stage 8 of Stimulation
2014-08-27 Performed Stage 9 of Stimulation
2014-08-28 Perforation
2014-08-28 Performed Stage 11 of Stimulation
2014-08-28 Performed Stage 12 of Stimulation
2014-08-29 Perforation
2014-08-29 Performed Stage 13 of Stimulation
2014-08-29 Performed Stage 14 of Stimulation
2014-08-29 Performed Stage 15 of Stimulation
2014-08-29 Performed Stage 16 of Stimulation
2014-08-29 Performed Stage 17 of Stimulation
2014-08-30 Perforation
2014-08-30 Performed Stage 18 of Stimulation
2014-08-30 Performed Stage 19 of Stimulation
2014-08-30 Performed Stage 20 of Stimulation
2014-08-31 Perforation
2014-08-31 Performed Stage 21 of Stimulation
2014-08-31 Performed Stage 22 of Stimulation
2014-08-31 Performed Stage 23 of Stimulation
2014-09-01 Perforation
2014-09-01 Performed Stage 24 of Stimulation
2014-09-03 Perforation
2014-09-03 Performed Stage 25 of Stimulation
2014-09-04 Perforation
2014-09-04 Performed Stage 26 of Stimulation
2014-09-05 Perforation
2014-09-05 Performed Stage 27 of Stimulation
2014-09-06 Perforation
2014-09-06 Performed Stage 28 of Stimulation
2014-09-07 Perforation
2014-09-07 Performed Stage 29 of Stimulation
2014-09-07 Performed Stage 30 of Stimulation
2014-09-07 Performed Stage 31 of Stimulation
2014-09-07 Performed Stage 32 of Stimulation
2014-09-08 Perforation
2014-09-08 Performed Stage 33 of Stimulation
2014-09-08 Performed Stage 34 of Stimulation
2014-09-27 Perforation
2014-09-27 Performed Stage 35 of Stimulation
2014-09-28 Perforation
2014-09-28 Performed Stage 36 of Stimulation
2014-09-28 Performed Stage 37 of Stimulation
2014-09-28 Performed Stage 38 of Stimulation
2014-09-28 Performed Stage 39 of Stimulation
2018-07-05 Deviated
2018-07-05 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-08-11 1 Silica Sand 62,823 8,682 8,919
2014-08-12 2 Silica Sand 62,823 8,787 9,024
2014-08-12 3 Silica Sand 62,823 8,551 9,049
2014-08-12 4 Silica Sand 62,823 8,674 9,046
2014-08-13 5 Silica Sand 62,823 8,679 8,714
2014-08-25 6 Silica Sand 62,823 8,923 9,268
2014-08-26 7 Silica Sand 62,823 8,872 9,358
2014-08-27 8 Silica Sand 62,823 9,015 9,261
2014-08-27 9 Silica Sand 62,823 8,760 9,200
2014-08-27 10 Silica Sand 62,823 8,809 9,213
2014-08-28 11 Silica Sand 62,823 8,460 9,427
2014-08-28 12 Silica Sand 62,823 8,353 8,824
2014-08-29 13 Silica Sand 62,823 8,759 9,090
2014-08-29 14 Silica Sand 62,823 8,418 9,309
2014-08-29 15 Silica Sand 62,823 8,465 9,333
2014-08-29 16 Silica Sand 62,823 8,388 8,918
2014-08-29 17 Silica Sand 62,823 8,427 9,280
2014-08-30 18 Silica Sand 62,823 8,720 9,020
2014-08-30 19 Silica Sand 62,823 8,548 8,936
2014-08-30 20 Silica Sand 62,823 8,222 8,421
2014-08-31 21 Silica Sand 62,823 8,439 8,953
2014-08-31 22 Silica Sand 62,823 8,587 9,011
2014-08-31 23 Silica Sand 62,823 8,487 9,499
2014-09-01 24 Silica Sand 62,823 8,151 8,978
2014-09-03 25 Silica Sand 62,823 8,275 8,651
2014-09-04 26 Silica Sand 62,823 8,275 8,985
2014-09-05 27 Silica Sand 62,823 8,562 8,913
2014-09-06 28 Silica Sand 62,823 8,470 8,805
2014-09-07 29 Silica Sand 62,823 8,134 8,611
2014-09-07 30 Silica Sand 62,823 8,086 8,798
2014-09-07 31 Silica Sand 62,823 7,856 8,414
2014-09-07 32 Silica Sand 62,823 8,165 8,750
2014-09-08 33 Silica Sand 62,823 7,724 9,184
2014-09-08 34 Silica Sand 62,823 7,972 8,534
2014-09-27 35 Silica Sand 62,823 7,859 8,791
2014-09-28 36 Silica Sand 62,823 7,345 9,103
2014-09-28 37 Silica Sand 62,823 7,847 8,733
2014-09-28 38 Silica Sand 62,823 7,563 9,120
2014-09-28 39 Silica Sand 62,823 7,520 8,440

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 RICE DRILLING B LLC 765,577.00 70 0.00 0 0.00 0
2015 RICE DRILLING B LLC 2,215,467.00 364 0.00 0 0.00 0
2016 RICE DRILLING B LLC 931,675.48 337 0.00 0 0.00 0
2017 RICE DRILLING B LLC 755,587.11 332 0.00 0 0.00 0
2018 RICE DRILLING B LLC 616,591.00 365 0.00 0 0.00 0
2019 RICE DRILLING B LLC 612,567.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 RICE DRILLING B LLC Fracturing Fluid Waste 37.82 Tons LANDFILL 100172
2014 RICE DRILLING B LLC Produced Fluid 18.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2014 RICE DRILLING B LLC Drill Cuttings 94.28 Tons LANDFILL 100277
2014 RICE DRILLING B LLC Produced Fluid 1,951.43 Bbl INJECTION DISPOSAL WELL 34-157-25511
2014 RICE DRILLING B LLC Produced Fluid 6,986.29 Bbl CENT WASTE TRT FAC NPDES PA0254185
2014 RICE DRILLING B LLC Drill Cuttings 630.53 Tons LANDFILL 100172
2014 RICE DRILLING B LLC Produced Fluid 6,986.29 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2015 RICE DRILLING B LLC Fracturing Fluid Waste 2.85 Tons LANDFILL 100172
2015 RICE DRILLING B LLC Produced Fluid 122.57 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 RICE DRILLING B LLC Drilling Fluid Waste 68.05 Bbl LANDFILL 100592
2015 RICE DRILLING B LLC Produced Fluid 157.14 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015 RICE DRILLING B LLC Fracturing Fluid Waste 2.36 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2015 RICE DRILLING B LLC Produced Fluid 15.71 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 RICE DRILLING B LLC Produced Fluid 4,360.71 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 RICE DRILLING B LLC Fracturing Fluid Waste 2.00 Tons INJECTION DISPOSAL WELL 42-003-38495
2015 RICE DRILLING B LLC Fracturing Fluid Waste 5.53 Tons LANDFILL 100592
2015 RICE DRILLING B LLC Produced Fluid 12,327.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 9.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 178.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 1.07 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 305.86 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RICE DRILLING B LLC Produced Fluid 173.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RICE DRILLING B LLC Filter Socks 0.02 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2016 RICE DRILLING B LLC Waste Water Treatment Sludge 2.88 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2016 RICE DRILLING B LLC Other Oil & Gas Wastes 9.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 496.44 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RICE DRILLING B LLC Produced Fluid 123.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 RICE DRILLING B LLC Produced Fluid 4,876.88 Bbl REUSE OTHER THAN ROAD SPREADING
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 115.32 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 44.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RICE DRILLING B LLC Produced Fluid 425.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 RICE DRILLING B LLC Filter Socks 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2017 RICE DRILLING B LLC Produced Fluid 609.88 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 38.56 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Produced Fluid 354.75 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 12.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Produced Fluid 36.27 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 110.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 675.32 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 43.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 100.53 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2238545 Primary Facility 2014-01-15 Drilling/Alteration No Violations Noted
2255840 Primary Facility 2014-03-13 Drilling/Alteration No Violations Noted
2264310 Primary Facility 2014-04-16 Drilling/Alteration No Violations Noted Patterson UTI drilling for Rice Energy using closed loop system and flare stack. Currently drilling ahead @8364ft. BOP tested good at nipple up. Containment under rig and support equipment in good condition.
2768825 Primary Facility 2018-08-29 Routine/Complete Inspection No Violations Noted Well appears to be maintained and producing. Water in cellar.
2824369 Primary Facility 2019-01-09 Routine/Complete Inspection No Violations Noted On 1/9/19 a routine complete inspection of the Big Daddy Shaw Well Pad was conducted in response to an operator request. The following was observed:

>>The operator representative reported plans to revisit the site to drill further wells.

>>A minor modification to place a raised berm around the perimeter of the pad was requested and denied due to substantial changes in flow patterns around the pad necessitating engineer review.

>>The site was in generally good condition with no noted violations or concerns.

2837719 Primary Facility 2019-02-08 Routine/Complete Inspection No Violations Noted Well appears to be well maintained and producing.

Cellar Tech/NOV auger rig on location to spud 7 new wells.

2838443 Primary Facility 2019-02-07 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present.

For data sources see[8]

References