If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28267 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.434436,"lon":-79.354689,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: EDWARD W CULP 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-01-26 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.434436 | |
Longitude: -79.354689 |
Date | Event |
---|---|
2010-01-26 | New Permit Application |
2010-06-04 | Performed Spud Operation |
2010-06-14 | Drilling Completion |
2010-06-22 | Perforation |
2013-04-12 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 3,479.00 | 126 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 10,100.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 5,530.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 4,029.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 2,583.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 2,102.00 | 358 | 35.49 | 358 | 0.00 | 0 |
2016 | XTO ENERGY INC | 1,766.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 1,340.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 1,491.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 13.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 14.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 114.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 14.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2012 | XTO ENERGY INC | Produced Fluid | 39.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | XTO ENERGY INC | Produced Fluid | 19.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2015 | XTO ENERGY INC | Produced Fluid | 5 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 5.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1896372 | Primary Facility | 2010-06-25 | Routine/Complete Inspection | No Violations Noted | Well site has been drilled, but is not equipped for production. Pit is still on-site / appears to be in sound condition. Site ID sign and E&S plan located. At this time there are no signs of accelerated erosion and sedimentation noted on the access road or well site. However, it was noted that the silt fence was installed incorrectly. This should be addressed to avoid any future erosion problems. |
2273331 | Primary Facility | 2014-05-23 | Routine/Complete Inspection | No Violations Noted | Producing gas. Tag, tank, e&s ok. |
2723354 | Primary Facility | 2018-04-26 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank appears structurally sound. Well tagged, however well permit incorrectly listed as 129-28265. Department records indicate correct well permit to be 129-28267. Department requests Operator correct well permit tag.No E&S issues. |
2734548 | Primary Facility | 2018-05-25 | Follow-up Inspection | No Violations Noted | Follow-up inspection to 4/26/2018 inspection. Previously noted incorrect well tag from 4/26/2018 inspection has been corrected. |
For data sources see[7]