37-129-28621

Well Details

Well ID: 37-129-28621
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148391
Farm/Lease Name: GAUT 4D
License Status:
Spud Date:
Permit Date: 2011-06-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.508269
Longitude: -79.559217

For data sources see[1][2][3]

Well History

Date Event
2011-06-23 New Permit Application
2011-08-11 Performed Spud Operation
2011-10-04 New Permit Application
2012-01-17 Drilling Completion
2012-05-03 Perforation
2013-11-06 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-05-27 2012-05-27 7,491 8,337,543

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DAP-903 Calfrac Well Services Scale Inhibitor Scale Inhibitor 100.00 0.01
DWP-603 Calfrac Well Services Friction Reducer Ammonium chloride 12125-02-9 1.00 0.00151000
Ethanaminium, n,n,n-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,chloride,
polymer with 2-propenamide
69418-26-4 40.00 0.06
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.04
Nonyl phenol ethoxylate 9016-45-9 5.00 0.00755000
DAP-925 Calfrac Well Services Corrosion Inhibitor Olefin 5.00 0.00001000
Methanol 67-56-1 60.00 0.00012000
Polyoxyalkylenes 30.00 0.00006000
Propargyl alcohol 107-19-7 10.00 0.00002000
Thiourea polymer 68527-49-1 30.00 0.00006000
Fatty Acids 30.00 0.00006000
DWP-204 Clay Control Calfrac Well Services Buffer Formic acid 64-18-6 13.00 0.00003000
DWP-944 Calfrac Well Services Biocide Polyethylene glycol 25322-68-3 60.00 0.00603000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00201000
Acetic Acid Calfrac Well Services Acid Acetic acid 64-19-7 99.00 0.04
DWP-111 Calfrac Well Services Viscosity Additive Polysaccharide Suspension 0.00469000
Water Calfrac Well Services Carrier Water 100.00 94.19
DWP-690 Calfrac Well Services Friction Reducer Breaker Hydrogen peroxide 7722-84-1 7.00 0.00063000
Sand Calfrac Well Services Proppant Sand 100.00 4.62
Hydrochloric Acid Calfrac Well Services Acid Hydrochloric acid 7647-01-0 3.00 0.93

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 880,070.00 176 0.00 0 0.00 0
2013 CNX GAS CO LLC 934,848.21 365 0.00 0 0.00 0
2014 CNX GAS CO LLC 623,861.26 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 470,042.74 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 391,854.32 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 268,704.40 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 278,249.87 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 254,002.72 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CNX GAS CO LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011 CNX GAS CO LLC Drilling Fluid Waste 410.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011 CNX GAS CO LLC Drilling Fluid Waste 2,430.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2011 CNX GAS CO LLC Produced Fluid 557.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 0250050885
2011 CNX GAS CO LLC Produced Fluid 900.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2012 CNX GAS CO LLC Produced Fluid 658.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012 CNX GAS CO LLC Produced Fluid 117.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 CNX GAS CO LLC Drill Cuttings 248.38 Tons LANDFILL 100434
2012 CNX GAS CO LLC Produced Fluid 99.37 Bbl INJECTION DISPOSAL WELL 34-013-20609
2012 CNX GAS CO LLC Produced Fluid 931.67 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 CNX GAS CO LLC Fracing Fluid Waste 10,010.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CNX GAS CO LLC Drilling Fluid Waste 239.75 Bbl LANDFILL 0250050885
2012 CNX GAS CO LLC Drill Cuttings 578.80 Tons LANDFILL 100280
2013 CNX GAS CO LLC Fracing Fluid Waste 107.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Produced Fluid 28,037.69 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 352.04 Bbl INJECTION DISPOSAL WELL 34-155-23732
2013 CNX GAS CO LLC Produced Fluid 33.54 Bbl INJECTION DISPOSAL WELL 34-155-23203
2013 CNX GAS CO LLC Produced Fluid 226.96 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 CNX GAS CO LLC Produced Fluid 209.26 Bbl INJECTION DISPOSAL WELL 34-007-22038
2013 CNX GAS CO LLC Produced Fluid 229.32 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 CNX GAS CO LLC Produced Fluid 1,240.35 Bbl INJECTION DISPOSAL WELL 34-119-28776
2013 CNX GAS CO LLC Produced Fluid 33.54 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 CNX GAS CO LLC Produced Fluid 915.00 Bbl INJECTION DISPOSAL WELL 34-167-23862
2013 CNX GAS CO LLC Produced Fluid 1,043.31 Bbl INJECTION DISPOSAL WELL 34-155-23584
2013 CNX GAS CO LLC Produced Fluid 6,258.65 Bbl INJECTION DISPOSAL WELL 34-013-20609
2013 CNX GAS CO LLC Fracing Fluid Waste 67,431.33 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CNX GAS CO LLC Produced Fluid 444.09 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 CNX GAS CO LLC Produced Fluid 131.04 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013 CNX GAS CO LLC Produced Fluid 33.54 Bbl INJECTION DISPOSAL WELL 34-155-21894
2013 CNX GAS CO LLC Produced Fluid 106.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2013 CNX GAS CO LLC Produced Fluid 625.52 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 CNX GAS CO LLC Produced Fluid 2,031.80 Bbl INJECTION DISPOSAL WELL 34-155-22403
2014 CNX GAS CO LLC Produced Fluid 4,698.91 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Produced Fluid 359.19 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 CNX GAS CO LLC Produced Fluid 31.59 Bbl INJECTION DISPOSAL WELL 34-119-28776
2014 CNX GAS CO LLC Produced Fluid 391.44 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 CNX GAS CO LLC Produced Fluid 396.63 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 CNX GAS CO LLC Produced Fluid 224.64 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 CNX GAS CO LLC Produced Fluid 2,154.20 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 28.80 Bbl INJECTION DISPOSAL WELL 34-155-23795
2015 CNX GAS CO LLC Produced Fluid 6.40 Bbl INJECTION DISPOSAL WELL 34-155-21893
2015 CNX GAS CO LLC Produced Fluid 9.60 Bbl INJECTION DISPOSAL WELL 34-133-20525
2015 CNX GAS CO LLC Produced Fluid 1,031.73 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015 CNX GAS CO LLC Produced Fluid 6.40 Bbl INJECTION DISPOSAL WELL 34-155-23203
2015 CNX GAS CO LLC Produced Fluid 151.71 Bbl INJECTION DISPOSAL WELL 34-119-28776
2015 CNX GAS CO LLC Produced Fluid 19.20 Bbl INJECTION DISPOSAL WELL 34-167-23862
2015 CNX GAS CO LLC Produced Fluid 381.14 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015 CNX GAS CO LLC Produced Fluid 6.40 Bbl INJECTION DISPOSAL WELL 34-155-21894
2015 CNX GAS CO LLC Produced Fluid 3,415.37 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 2,877.97 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 348.98 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 912.50 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 354.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 106.00 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Produced Fluid 712.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 74.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 119.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Produced Fluid 258.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 386.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 CNX GAS CO LLC Produced Fluid 961.87 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 116.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Produced Fluid 262.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 7.86 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 528.14 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Other Oil & Gas Wastes 4.82 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OHR000015792
2018 CNX GAS CO LLC Other Oil & Gas Wastes 31.42 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 73.07 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 1,656.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 513.65 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Other Oil & Gas Wastes 13.85 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 248.89 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 79.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 244.86 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Produced Fluid 58.83 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 306.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 161.42 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 925.32 Bbl SURFACE IMPOUNDMENT 95-7-37312-19

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1997091 Primary Facility 2011-08-16 Drilling/Alteration No Violations Noted Location and preparation work for rigging up Whipstock Rig#22 Speedstar ongoing at time of inspection. Well spud in 08-11-11. Pit unlined and not in use.
2004645 Primary Facility 2011-09-19 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2010361 Primary Facility 2011-10-07 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI S. Banks.
2013353 Primary Facility 2011-10-20 Drilling/Alteration No Violations Noted Waiting on cement (9 5/8" casing) at time of inspection. Pit lined and freeboard maintained. Inspection conducted w/OGI S. Banks.
2014631 Primary Facility 2011-10-28 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. A small pit had been constructed onsite and it appeared to contain drill fluids. The pit was properly lined and it had more than the required two feet of lined freeboard. All E&S controls had been installed as outlined in the E&S plan. The disturbed area had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2076907 Primary Facility 2012-06-15 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and in the beginning phases of stimulation. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
2092861 Primary Facility 2012-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and stimulated and being actively equipped for production. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The associated water impoundments appeared to be in sound condition with the required 2 feet of freeboard. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum.
2101721 Primary Facility 2012-09-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and the Operator was actively working to equip the well for production. The well apparatus, brine tanks and heating units appear to be in sounds working condition. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2108710 Primary Facility 2012-10-17 Routine/Complete Inspection No Violations Noted At the time of inspection the drill rig was onsite and on containment. During the inspection the Operator indicated that the 4G was the well actively being drilled, at this time the 4D well was drilled and equipped for production. The associated well apparatus and brine tanks located onsite appear to be in sound condition. During the inspection the Department walked the perimeter and inspected the associated spring and seeps down gradient from the well pad area, no observation of contaminate at the time of inspection. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2110421 Primary Facility 2012-10-16 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2115650 Primary Facility 2012-11-14 Routine/Complete Inspection No Violations Noted No violations noted
2116161 Primary Facility 2012-11-13 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2127476 Primary Facility 2013-01-03 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be drilled and equipped for production. The associated well apparatus, brine tanks, and production heaters appear to be in sound condition. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2232477 Primary Facility 2013-12-30 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be plugged while the Operator prepares the site to drill additional wells. The Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2244019 Primary Facility 2014-02-10 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2250106 Primary Facility 2014-02-25 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2268231 Primary Facility 2014-05-05 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2363123 Primary Facility 2015-04-21 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2368813 Primary Facility 2015-05-11 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2376327 Primary Facility 2015-06-05 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2377790 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2393115 Primary Facility 2015-07-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2439753 Primary Facility 2016-01-07 Routine/Partial Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2477486 Primary Facility 2016-04-22 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2479388 Primary Facility 2016-04-28 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2491603 Primary Facility 2016-06-09 Routine/Partial Inspection No Violations Noted At the time of inspection the well appears to be in production. The Erosion and Sedimentation plan was onsite and appeared to be implemented. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2569443 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2627174 Primary Facility 2017-08-18 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Brine tank located within secondary containment and appears to be structurally sound. No E&S issues.
2682108 Primary Facility 2018-01-12 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues. Active ESCGP issued.
2740766 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted 6-13-18 Well producing.
2773835 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted 9/12/18 Well producing.
2842321 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Well appears to be in good working condition.
2842483 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. It appears that temporary BMP's (new, unused) are being stored on-site. Nine brine tanks on site.

For data sources see[8]