37-129-28648

Well Details

Well ID: 37-129-28648
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Fairfield Township
Operator Name: BURNETT OIL CO INC
Well Pad ID: 149371
Farm/Lease Name: STICKLE ROSS MOUNTAIN UNIT
License Status: Plugged and Abandoned
Spud Date: 2011-09-25
Permit Date: 2011-08-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.331964
Longitude: -79.095989

For data sources see[1][2][3]

Well History

Date Event
2011-08-25 New Permit Application
2011-09-25 Performed Spud Operation
2011-10-26 Drilling Completion
2011-11-21 Perforation
2012-11-06 DEVIATED
2018-06-21 Begin Plugging
2018-07-16 Finished Plugging
2019-10-18 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-11-21 2011-11-21 12,028 4,825,086

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer J609 Schlumberger Friction Reducer Ammonium sulfate 7783-20-2 30.00 0.00120000
A264 Corrosion Inhibitor Schlumberger Inhibitor Methanol 67-56-1 40.00 0.00003000
Aliphatic alcohols, ethoxylated #1 30.00 0.00003000
Propargyl alcohol 107-19-7 10.00 0.00003000
Aliphatic acids 30.00 0.00003000
Scale Inhibitor B317 Schlumberger Inhibitor Ethylene glycol 107-21-1 5.00 0.00020000
Trisodium phosphate 7601-54-9 5.00 0.00020000
Rheology Modifier ClearFrac XT J589 Schlumberger Activator Isopropanol 67-63-0 30.00 0.00007000
Iron Stabilizer L58 Schlumberger Reducer Sodium erythorbate 6381-77-7 100.00 0.00060000
Green-Cide 25G Special Products Aldehydes Glutaraldehyde 111-30-8 25.00 0.00050000
Hydrochloric Acid 7.5 H75 Schlumberger Acidizing Hydrochloric acid 7647-01-0 7.50 0.01
Gelling Agent ClearFrac XT J590 Schlumberger Gelling Agent Fatty acid amidoalkyl betaine 60.00 0.00007000
Isopropanol 67-63-0 30.00 0.00007000
ClearFrac Encapsulated Breaker J567 Schlumberger Breaker Sulfonated polystyrene 100.00 0.00040000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 BURNETT OIL CO INC 0.00 0 0.00 0 0.00 0
2012 BURNETT OIL CO INC 359,951.00 307 0.00 0 0.00 0
2013 BURNETT OIL CO INC 223,744.00 365 0.00 0 0.00 0
2014 BURNETT OIL CO INC 190,599.00 365 0.00 0 0.00 0
2015 BURNETT OIL CO INC 159,429.00 365 0.00 0 0.00 0
2016 BURNETT OIL CO INC 113,209.00 304 0.00 0 0.00 0
2017 BURNETT OIL CO INC 106,257.00 335 0.00 0 0.00 0
2018 BURNETT OIL CO INC 22,696.00 116 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 BURNETT OIL CO INC Produced Fluid 690.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2012 BURNETT OIL CO INC Produced Fluid 3,015.50 Bbl INJECTION DISPOSAL WELL 2D0855151
2012 BURNETT OIL CO INC Produced Fluid 8,000.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 BURNETT OIL CO INC Produced Fluid 580.00 Bbl INJECTION DISPOSAL WELL 2D0855151
2013 BURNETT OIL CO INC Produced Fluid 180.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 BURNETT OIL CO INC Produced Fluid 300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 BURNETT OIL CO INC Produced Fluid 475.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW010
2013 BURNETT OIL CO INC Produced Fluid 940.00 Bbl INJECTION DISPOSAL WELL 2D0550319
2013 BURNETT OIL CO INC Produced Fluid 1,109.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2013 BURNETT OIL CO INC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 BURNETT OIL CO INC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2013 BURNETT OIL CO INC Produced Fluid 493.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013 BURNETT OIL CO INC Produced Fluid 405.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2013 BURNETT OIL CO INC Produced Fluid 235.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2013 BURNETT OIL CO INC Produced Fluid 180.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 BURNETT OIL CO INC Fracturing Fluid Waste 78.03 Tons LANDFILL 100434
2014 BURNETT OIL CO INC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2014 BURNETT OIL CO INC Produced Fluid 549.50 Bbl INJECTION DISPOSAL WELL 34-155-23795
2014 BURNETT OIL CO INC Produced Fluid 663.50 Bbl INJECTION DISPOSAL WELL 34-155-21893
2014 BURNETT OIL CO INC Produced Fluid 162.50 Bbl INJECTION DISPOSAL WELL 2D0855151
2014 BURNETT OIL CO INC Produced Fluid 229.50 Bbl INJECTION DISPOSAL WELL 34-151-23420
2014 BURNETT OIL CO INC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2014 BURNETT OIL CO INC Produced Fluid 172.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2015 BURNETT OIL CO INC Produced Fluid 75.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2015 BURNETT OIL CO INC Produced Fluid 895.80 Bbl CENT WASTE TRT FAC NPDES PA0254185
2015 BURNETT OIL CO INC Produced Fluid 182.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2015 BURNETT OIL CO INC Produced Fluid 115.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 BURNETT OIL CO INC Produced Fluid 895.80 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2016 BURNETT OIL CO INC Produced Fluid 1,832.46 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2016 BURNETT OIL CO INC Produced Fluid 1,832.46 Bbl CENT WASTE TRT FAC NPDES PA0254185
2016 BURNETT OIL CO INC Produced Fluid 18.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 BURNETT OIL CO INC Produced Fluid 545.05 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2018 BURNETT OIL CO INC Produced Fluid 110.05 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2004336 Primary Facility 2011-09-07 Drilling/Alteration No Violations Noted BURNETT IS WAITING ON SPUD RIG.
2004338 Primary Facility 2011-09-12 Drilling/Alteration No Violations Noted CONDUCTOR AND CELLAR ARE BOTH SET, WAITING ON BIG RIG.
2006721 Primary Facility 2011-09-30 Drilling/Alteration No Violations Noted SAVANNA RIG DRILLING ON BURNETT PAD, DEPTH OF 485'. NIPPLING UP ON THE16" CSG.
2010369 Primary Facility 2011-10-05 Drilling/Alteration No Violations Noted SAVANNA RIG DRILLING ON BURNETT PAD, DEPTH OF 2640'.
2012741 Primary Facility 2011-10-05 Routine/Complete Inspection No Violations Noted Site visit was in response to spud notification. Jason Brannan DEP Inspector was present during inspection.
2014008 Primary Facility 2011-10-24 Drilling/Alteration No Violations Noted SAVANNA RIG DRILLING ON BURNETT PAD, DEPTH OF 12028'.
2024185 Primary Facility 2011-12-06 Routine/Complete Inspection No Violations Noted E&S Inspection. No violations noted.
2174386 Primary Facility 2013-06-12 Routine/Complete Inspection No Violations Noted Routine inspection no vilations noted.
2176070 Primary Facility 2013-06-18 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2217624 Primary Facility 2013-10-30 Routine/Complete Inspection No Violations Noted This was a routine inspection. Met on site with Danny Hopkins, Production Superintendent with Burnett.
2332340 Primary Facility 2014-12-29 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks and associated production equipment appeared to be in sound condition.
2541718 Primary Facility 2016-11-23 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2681010 Primary Facility 2018-01-10 Routine/Partial Inspection No Violations Noted Routine partial inspection due to snow cover. Well appears to be in production. Production Foreman Ed Moorhead on site during inspection.
2688165 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2705596 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Land owner present during inspection.
2722185 Primary Facility 2018-04-24 Plugging(Includes Plugged/Mined Through) No Violations Noted Review of plugging information
2746185 Primary Facility 2018-06-26 Plugging(Includes Plugged/Mined Through) No Violations Noted Quest contracted Pa Production Services to plug well. Brine tank present onsite. Casing pressure was 0 psi. Annulus pressure was 10 psi and released to 0 psi. Open mine at 201 to 210 ft. Convention well. Perfs for extraction at 2025, 3422, 3599, and 3910. Drilled 1986. Collar at 166 ft. Camera run to 201. High flow and turbulence.
2746213 Primary Facility 2018-06-26 Plugging(Includes Plugged/Mined Through) No Violations Noted Plugging of Marcellus well. Containment was set under rig. Conserv contracted to plug well. CIB set at 8100 ft. Tubing pulled at 8473. Preparation to set 600 ft plug on CIB. Second well onsite producing. 5 1/2 ft production cemented to 5700 ft. 8 5/8 pipe and 11 3/4 inches cemented to surface.
2749856 Primary Facility 2018-06-27 Plugging(Includes Plugged/Mined Through) No Violations Noted Bennet contracted conserv. Setting 600 ft of cement on bridge plug set at 8100. Well 2in production No issues at site
2750805 Primary Facility 2018-07-05 Plugging(Includes Plugged/Mined Through) No Violations Noted Feet and set second plug from 7450 feet to 6750 feet on june 29, set cement plug on from 6750 ft to 6000 ft on July 2 set another plug from 6000 ft to 5250 feet with 83 sacks . On July 9, cement plug set at 5250. On july 10, cement plug using 83 sacks set at 4000 to 3250 ft. Set second plug at 3250 to 2500 ft with 83 sacks. Well pressure on casing and annulus was 0 psi.
2751262 Primary Facility 2018-07-12 Plugging(Includes Plugged/Mined Through) No Violations Noted Work completed on july 11


RIH and tag TOC at 2550 feet RU cement trucks Set a cement plug from 2550 feet up to 1750 feet with 83 sks of cement TOOH WOC RIH and tag TOC at 1750 feet Set a cement plug from 1750 feet up to 7

Progress of cement plugs using class A.

Bottom of Plug - Top of Plug / Tag TOC / Sacks of Cement 8100-7500 / 7450 / 67 sks 7450-6750 / 6750 / 83 sks 6750-6000 / 6000 / 20 sks 6000-5250 / 5500 / 83 sks 5500-4750 / 4760 / 83 sks 4760-4000 / 4000 / 84 sks 4000-3250 / 3250 / 83 sks 3250-2500 / 2550 / 83 sks 2550-1750 / 1750 / 83 sks 1750-700 / / 117 sks

2752111 Primary Facility 2018-07-13 Plugging(Includes Plugged/Mined Through) No Violations Noted RU wireline truck

RIH and make a jet cut in 5 1/2 casing at 570 feet Attempt to pull casing with no success RIH and make a jet cut in 5 1/2 casing at 500 feet Attempt to pull casing with no success RIH and make a jet cut in 5 1/2 casing at 350 feet Attempt to pull casing with no success RD wireline truck

For data sources see[8]