Well Details

Well ID: 37-131-20188
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CARRIZO (MARCELLUS) LLC
Well Pad ID: 145314
Farm/Lease Name: MAZZARA
License Status: Plugged and Abandoned
Spud Date: 2013-11-20
Permit Date: 2011-07-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.621433
Longitude: -75.994644

For data sources see[1][2][3]

Well History

Date Event
Fully Plugged
2011-07-12 New Permit Application
2011-08-17 Performed Spud Operation
2013-11-20 Begin Plugging
2013-11-20 Drilling Completion
2013-11-20 Finished Plugging

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1990322 Primary Facility 2011-07-26 Routine/Complete Inspection No Violations Noted
2038881 Primary Facility 2012-02-01 Routine/Complete Inspection No Violations Noted
2106140 Primary Facility 2012-10-09 Routine/Complete Inspection Pending Visited site last week, after rig had moved off. Returned to check how clean-up was progressing. Slowly. The OBM tanks were emptied and there was OBM and other on the tank containment. Berms were removed and there were holes in containment. There's been quite a bit of rain lately. Need to get tanks and containment out. Called Tom Weller and Jesse Bonnice of Carrizo. Discussed need to progress more quickly after rig leaves with site clean-up. Another crew is being sent to clean up problem areas.
2110036 Primary Facility 2012-10-11 Follow-up Inspection No Violations Noted Follow up to PEND earlier in the week. Work is continueing on cleaning up the pad, but OBM tanks & containment have been removed and cleaned up. Mats have all been picked up and cleaned. Still a relatively small area of containment to be removed.
2176415 Primary Facility 2013-06-19 Routine/Complete Inspection No Violations Noted

For data sources see[6]