If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-111-24865 | | Well ID: 34-111-24865 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.79, -80.98 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 11: | Line 11: | ||
| County: [[Monroe_County,_Ohio|Monroe]] | | County: [[Monroe_County,_Ohio|Monroe]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Adams_Township,_Monroe_County,_Ohio|Adams Township]] |
|- | |- | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] | ||
|- | |- | ||
− | | Well Pad ID: [[ | + | | Well Pad ID: [[US-OH-001595]] |
|- | |- | ||
| Farm/Lease Name: PYLES B | | Farm/Lease Name: PYLES B | ||
|- | |- | ||
− | | License Status: | + | | License Status: Producing |
|- | |- | ||
− | | License Date: | + | | License Date: 2019-04-05 |
|- | |- | ||
| Spud Date: 2018-12-05 | | Spud Date: 2018-12-05 | ||
Line 27: | Line 27: | ||
| Spud Drilling Contractor: | | Spud Drilling Contractor: | ||
|- | |- | ||
− | | Final Drill Date: | + | | Final Drill Date: 2019-04-12 |
|- | |- | ||
− | | Well Total Depth: | + | | Well Total Depth: 22680.00 ft |
|- | |- | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.790000 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.980000 |
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref>{{cite web |
− | | title = | + | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables |
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
− | < | + | == Well History == |
− | {| class="wikitable sortable" | + | {| class="wikitable sortable" width="95%" |
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2018-12-04 | ||
+ | | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/4/2018, Expired Date:12/3/2020 12:00:00 PM, Drilling unit acres:157.592, Proposed Well Type:OG, Proposed Well Class:EOUT | ||
+ | |- | ||
+ | | APP | ||
+ | | 2019-04-05 | ||
+ | | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/5/2019, Expired Date:4/4/2021 12:00:00 PM, Drilling unit acres:347.136, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2019-04-12 | ||
+ | | | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2021-04-04 | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
!scope="col" style="text-align: center"| Perforation Date | !scope="col" style="text-align: center"| Perforation Date | ||
!scope="col" style="text-align: center"| Interval Top (ft) | !scope="col" style="text-align: center"| Interval Top (ft) | ||
!scope="col" style="text-align: center"| Interval Base (ft) | !scope="col" style="text-align: center"| Interval Base (ft) | ||
!scope="col" style="text-align: center"| Number of Shots | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 22428 | ||
+ | | style="text-align: right;" | 22526 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 10655 | ||
+ | | style="text-align: right;" | 10657 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | | ||
+ | | style="text-align: right;" | 10655 | ||
+ | | style="text-align: right;" | 10657 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
|- | |- | ||
|}--> | |}--> | ||
− | |||
<!--== Production Data == | <!--== Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 61: | Line 145: | ||
|- | |- | ||
|}--> | |}--> | ||
− | |||
<!--== Waste Data == | <!--== Waste Data == | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
Line 71: | Line 154: | ||
|- | |- | ||
|}--> | |}--> | ||
− | |||
== Inspection Data == | == Inspection Data == | ||
==== Inspections Performed ==== | ==== Inspections Performed ==== | ||
Line 80: | Line 162: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -295952952 | ||
+ | | 2019-7-8 0:00:0 | ||
+ | | CT | ||
+ | | No Violations | ||
+ | | 0.20 | ||
+ | |- | ||
+ | | 1478174747 | ||
+ | | 2020-5-21 0:00: | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | 1.00 | ||
|- | |- | ||
| 1554061892 | | 1554061892 | ||
Line 104: | Line 198: | ||
| No Violations | | No Violations | ||
| The said well was spudded on 12/05/2018 by Precision Rat Hole with a 30 diameter conductor borehole being drilled to 118 from ground level elevation. The rig inserted 118 of 24 diameter .375 wall 94.6 pound per foot weld connection casing. C&J cement the casing on this day using a 65 barrel slurry volume consisting of 305 sacks of class A cement with 2% calcium and 1/4 pound per sack loss circulation material. The cement weight was verified at 15.6 pound per gallon by weight of scale and the cement yield was 1.2 by design. The cement was displaced with 57 barrels of fresh water with cement returns witnessed to surface at 36 barrels into displacement. | | The said well was spudded on 12/05/2018 by Precision Rat Hole with a 30 diameter conductor borehole being drilled to 118 from ground level elevation. The rig inserted 118 of 24 diameter .375 wall 94.6 pound per foot weld connection casing. C&J cement the casing on this day using a 65 barrel slurry volume consisting of 305 sacks of class A cement with 2% calcium and 1/4 pound per sack loss circulation material. The cement weight was verified at 15.6 pound per gallon by weight of scale and the cement yield was 1.2 by design. The cement was displaced with 57 barrels of fresh water with cement returns witnessed to surface at 36 barrels into displacement. | ||
+ | |- | ||
+ | | 49862188 | ||
+ | | 2019-6-25 0:00: | ||
+ | | CT | ||
+ | | No Violations | ||
+ | | 0.40 | ||
+ | |- | ||
+ | | 986096530 | ||
+ | | 2019-6-18 0:00: | ||
+ | | CT | ||
+ | | No Violations | ||
+ | | 0.20 | ||
|- | |- | ||
|} | |} | ||
Line 115: | Line 221: | ||
|- | |- | ||
|}--> | |}--> | ||
− | For data sources see<ref | + | For data sources see<ref>{{cite web |
− | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | |
− | + | |publisher = [[Ohio Department of Natural Resources]] | |
− | { | + | | date = 2020-11-16 |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2020-11-16 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | { | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-111-24865 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.79,"lon":-80.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Adams Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001595 | |
Farm/Lease Name: PYLES B | |
License Status: Producing | |
License Date: 2019-04-05 | |
Spud Date: 2018-12-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 2019-04-12 | |
Well Total Depth: 22680.00 ft | |
Configuration: Horizontal | |
Latitude: 39.790000 | |
Longitude: -80.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-12-04 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/4/2018, Expired Date:12/3/2020 12:00:00 PM, Drilling unit acres:157.592, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2019-04-05 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/5/2019, Expired Date:4/4/2021 12:00:00 PM, Drilling unit acres:347.136, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-04-12 | |
Construction Permit Expires | 2021-04-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
22428 | 22526 | 0 | |
10655 | 10657 | 0 | |
10655 | 10657 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-295952952 | 2019-7-8 0:00:0 | CT | No Violations | 0.20 |
1478174747 | 2020-5-21 0:00: | PL | No Violations | 1.00 |
1554061892 | 2019-03-31 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing cement job with H&P Drilling rig 608 on location along with Wyoming Casing and Schlumberger Cement Service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,677 and inserted 1,471 of 13.375 diameter J-55 Grade Buttress Thread casing with a casing guide shoe and float collar ran along with centralizers on every 3rd casing joint. The casing was cemented by Schlumberger using a 306 barrel cement mix consisting of 1,320 sacks of class A cement with the cement weight verified at 15.6 pound per gallon by weight of scale, the cement yield was 1.18. The cement was displaced with 220 barrels of fresh water to the casing float collar. 70 barrels of cement returns were witnessed to surface and final displacement pressure was 600 pounds pressure with the casing being pressure tested to 1,246 pounds pressure upon the landing of the plug. |
1554986992 | 2019-04-11 | Drill / Deepen / Reopen | No Violations | |
1555338507 | 2019-04-15 | Drill / Deepen / Reopen | No Violations | |
2138247895 | 2018-12-06 | Casing String Witnessed | No Violations | The said well was spudded on 12/05/2018 by Precision Rat Hole with a 30 diameter conductor borehole being drilled to 118 from ground level elevation. The rig inserted 118 of 24 diameter .375 wall 94.6 pound per foot weld connection casing. C&J cement the casing on this day using a 65 barrel slurry volume consisting of 305 sacks of class A cement with 2% calcium and 1/4 pound per sack loss circulation material. The cement weight was verified at 15.6 pound per gallon by weight of scale and the cement yield was 1.2 by design. The cement was displaced with 57 barrels of fresh water with cement returns witnessed to surface at 36 barrels into displacement. |
49862188 | 2019-6-25 0:00: | CT | No Violations | 0.40 |
986096530 | 2019-6-18 0:00: | CT | No Violations | 0.20 |
For data sources see[4]