X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0414241102000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0414241102000
 
| Well ID: 0414241102000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.5085730000000126, -113.34850099999999884 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.508573, -113.348501 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/02-11-041-24W4/0
 
| Location: 00/02-11-041-24W4/0
 +
|-
 +
| Location Alias: 00/02-11-41-24 W4M
 +
|-
 +
| Location Alias 2: 00/02-11-041-24 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 041
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 11
 +
|-
 +
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
 
|-
 
|-
 
| Well Name: PETROMK CHIGWELL 2-11-41-24
 
| Well Name: PETROMK CHIGWELL 2-11-41-24
 +
|-
 +
| Operator Name: [[Petromark Minerals Ltd.]]
 +
|-
 +
| License Number: 0014146
 
|-
 
|-
 
| License Date: 1957-10-18
 
| License Date: 1957-10-18
 
|-
 
|-
| Final Drilling Date: 1957-11-11
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1957-10-20
 +
|-
 +
| Final Drill Date: 1957-11-11
 +
|-
 +
| Well Total Depth: 1859.30 m
 +
|-
 +
| Surface Hole Latitude: 52.508573
 +
|-
 +
| Surface Hole Longitude: -113.348501
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1957-10-18
 +
| Obtained License
 +
|-
 +
| 1957-10-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1957-10-31
 +
| Drill Stem Test Performed
 +
|-
 +
| 1957-11-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1957-11-10
 +
| Drill Stem Test Performed
 
|-
 
|-
| Total Depth: 1859.3m
+
| 1957-11-11
 +
| Finished Drilling
 
|-
 
|-
| Fluid Type: Gas
+
| 1957-11-11
 +
| Lost Circulation Occurred
 
|-
 
|-
| Status: Abandoned
+
| 1957-11-13
 +
| Production Casing Operation Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 1957-12-02
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Configuration: Vertical
+
| 1960-08-10
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Latitude: 52.5085730000000126
+
| 1962-01-02
 +
| Well Began Production
 
|-
 
|-
| Longitude: -113.34850099999999884
+
| 1962-01-02
 +
| Well Fluid changed to Gas
 
|-
 
|-
 +
| 1962-01-02
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1962-10-18
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-10-19
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 1962-10-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-11-13
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-11-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-11-20
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1962-12-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-06-10
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1963-06-10
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1963-06-12
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1963-06-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1969-11-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1969-11-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1985-03-04
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-03-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1985-03-04
 +
| Plug Back Performed
 +
|-
 +
| 1985-03-04
 +
| Well Log Performed
 +
|-
 +
| 1985-03-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-03-07
 +
| Plug Back Performed
 +
|-
 +
| 1985-03-07
 +
| Well Abandoned
 +
|-
 +
| 1985-03-07
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1985-03-07
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1960-08-10
 +
| Perforation
 +
| style="text-align: right;" | 1571.20
 +
| style="text-align: right;" | 1574.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1963-06-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1559.10
 +
| style="text-align: right;" | 1560.30
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1963-06-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1565.10
 +
| style="text-align: right;" | 1567.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1963-06-12
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1549.30
 +
| style="text-align: right;" | 1551.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1963-06-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 1549.30
 +
| style="text-align: right;" | 1560.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-03-04
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1535.00
 +
| style="text-align: right;" | 1543.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985-03-04
 +
| Perforation
 +
| style="text-align: right;" | 1357.50
 +
| style="text-align: right;" | 1361.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1985-03-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1341.00
 +
| style="text-align: right;" | 1349.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-18
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1571.20
 +
| style="text-align: right;" | 1574.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-19
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-11-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-11-18
 +
| Perforation
 +
| style="text-align: right;" | 1570.60
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-11-20
 +
| Acid Wash
 +
| style="text-align: right;" | 1570.60
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-12-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 1570.60
 +
| style="text-align: right;" | 1571.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-06-10
 +
| Cement Plug
 +
| style="text-align: right;" | 1568.80
 +
| style="text-align: right;" | 1568.80
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 1562
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 1957-11-11
 +
| Lost Circulation
 +
| style="text-align: right;" | 1496.90
 +
| style="text-align: right;" | 1496.90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:08, 19 January 2021

Well Details

Well ID: 0414241102000
Loading map...
Location: 00/02-11-041-24W4/0
Location Alias: 00/02-11-41-24 W4M
Location Alias 2: 00/02-11-041-24 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 24
Section: 11
County/Municipality: Lacombe County
Well Name: PETROMK CHIGWELL 2-11-41-24
Operator Name: Petromark Minerals Ltd.
License Number: 0014146
License Date: 1957-10-18
License Status: Abandoned
Spud Date: 1957-10-20
Final Drill Date: 1957-11-11
Well Total Depth: 1859.30 m
Surface Hole Latitude: 52.508573
Surface Hole Longitude: -113.348501

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-10-18 Obtained License
1957-10-28 Drill Stem Test Performed
1957-10-31 Drill Stem Test Performed
1957-11-07 Drill Stem Test Performed
1957-11-10 Drill Stem Test Performed
1957-11-11 Finished Drilling
1957-11-11 Lost Circulation Occurred
1957-11-13 Production Casing Operation Performed
1957-12-02 Well Mode changed to Drilled and Cased
1960-08-10 Perforation Treatment Performed - Jet Perforation
1962-01-02 Well Began Production
1962-01-02 Well Fluid changed to Gas
1962-01-02 Well Mode changed to Flowing
1962-10-18 Perforation Treatment Performed - Cement Squeeze
1962-10-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-13 Perforation Treatment Performed - Cement Squeeze
1962-11-18 Perforation Treatment Performed - Jet Perforation
1962-11-20 Perforation Treatment Performed - Acid Wash - No Pressure
1962-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-10 Perforation Treatment Performed - Bullet Perforation
1963-06-10 Perforation Treatment Performed - Cement Plug
1963-06-12 Perforation Treatment Performed - Bullet Perforation
1963-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-01 Well Fluid changed to Gas
1969-11-01 Well Mode changed to Suspended
1985-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-04 Perforation Treatment Performed - Jet Perforation
1985-03-04 Plug Back Performed
1985-03-04 Well Log Performed
1985-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-07 Plug Back Performed
1985-03-07 Well Abandoned
1985-03-07 Well Fluid changed to Gas
1985-03-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-10 Perforation 1571.20 1574.30 13
1963-06-10 Bullet Perforation 1559.10 1560.30 7
1963-06-10 Bullet Perforation 1565.10 1567.00 7
1963-06-12 Bullet Perforation 1549.30 1551.70 7
1963-06-14 Acid Treatment 1549.30 1560.30 0
1985-03-04 Packing Device Capped w/Cement 1535.00 1543.00 0
1985-03-04 Perforation 1357.50 1361.20 13
1985-03-07 Packing Device Capped w/Cement 1341.00 1349.00 0
1962-10-18 Cement Squeeze 1571.20 1574.30 0
1962-10-19 Hydra Jet Perforation 1571.50 1571.50 0
1962-10-21 Acid Treatment 1571.50 1571.50 0
1962-11-13 Cement Squeeze 1571.50 1571.50 0
1962-11-18 Perforation 1570.60 1571.50 0
1962-11-20 Acid Wash 1570.60 1571.50 0
1962-12-05 Acid Treatment 1570.60 1571.50 0
1963-06-10 Cement Plug 1568.80 1568.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1979 1562 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1957-11-11 Lost Circulation 1496.90 1496.90

For data sources see[6]

References