X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0414253503000"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0414253503000
 
| Well ID: 0414253503000
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.567849, -113.49866 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.567849, -113.498660 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/03-35-041-25W4/0
 
| Location: 00/03-35-041-25W4/0
Line 43: Line 43:
 
| Surface Hole Latitude: 52.567849
 
| Surface Hole Latitude: 52.567849
 
|-
 
|-
| Surface Hole Longitude: -113.49866
+
| Surface Hole Longitude: -113.498660
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 162: Line 162:
 
| style="text-align: right;" | 1588.90
 
| style="text-align: right;" | 1588.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 2005-01-16
 +
| Perforation
 +
| style="text-align: right;" | 220.00
 +
| style="text-align: right;" | 220.30
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-01-16
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 220.00
 +
| style="text-align: right;" | 220.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1978-02-06
 
| 1978-02-06
Line 209: Line 221:
 
| style="text-align: right;" | 914.00
 
| style="text-align: right;" | 914.00
 
| style="text-align: right;" | 914.30
 
| style="text-align: right;" | 914.30
| style="text-align: right;" | 0
 
|-
 
| 2005-01-16
 
| Perforation
 
| style="text-align: right;" | 220.00
 
| style="text-align: right;" | 220.30
 
| style="text-align: right;" | 17
 
|-
 
| 2005-01-16
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 220.00
 
| style="text-align: right;" | 220.30
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 286: Line 286:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:28, 19 January 2021

Well Details

Well ID: 0414253503000
Loading map...
Location: 00/03-35-041-25W4/0
Location Alias: 00/03-35-41-25 W4M
Location Alias 2: 00/03-35-041-25 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 35
County/Municipality: Lacombe County
Well Name: DAYLIGHT ET AL CHIG 3-35-41-25
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0066999
License Date: 1977-11-24
License Status: Suspension
Spud Date: 1977-12-14
Final Drill Date: 1978-01-19
Well Total Depth: 2063.50 m
Surface Hole Latitude: 52.567849
Surface Hole Longitude: -113.498660

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-24 Obtained License
1978-01-09 Well Log Performed
1978-01-11 Drill Stem Test Performed
1978-01-19 Finished Drilling
1978-01-20 Well Log Performed
1978-01-21 Drill Stem Test Performed
1978-01-23 Production Casing Operation Performed
1978-02-03 Perforation Treatment Performed - Jet Perforation
1978-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-07 Perforation Treatment Performed - Fractured
1978-02-10 Well Mode changed to Drilled and Cased
1994-11-26 Well Log Performed
2004-11-17 Perforation Treatment Performed - Jet Perforation
2004-11-22 Perforation Treatment Performed - Chemical Squeeze
2004-12-08 Well Log Performed
2004-12-13 Perforation Treatment Performed - Fractured
2005-01-11 Perforation Treatment Performed - Jet Perforation
2005-01-12 Perforation Treatment Performed - Remedial Casing
2005-01-16 Perforation Treatment Performed - Jet Perforation
2005-01-16 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-02-03 Perforation 1588.00 1588.90 13
2005-01-16 Perforation 220.00 220.30 17
2005-01-16 Remedial Casing Cementing 220.00 220.30 0
1978-02-06 Acid Treatment 1588.00 1588.90 0
1978-02-07 Fracture 1588.00 1588.90 0
2004-11-17 Perforation 1622.20 1623.40 17
2004-11-17 Perforation 1613.60 1615.40 17
2004-11-22 Chemical Squeeze 1613.60 1623.40 0
2004-12-13 Fracture 1613.60 1615.40 0
2005-01-11 Perforation 914.00 914.30 17
2005-01-12 Remedial Casing Cementing 914.00 914.30 0

For data sources see[4]



References