X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22111"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-22111
 
| Well ID: 37-003-22111
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.484261, -79.713102 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.484261, -79.713102 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Allegheny County, Pennsylvania|Allegheny]]
 +
|-
 +
| Municipality: [[Plum Borough, Allegheny County, Pennsylvania|Plum Borough]]
 
|-
 
|-
 
| Operator Name: [[PENNECO OIL CO INC]]
 
| Operator Name: [[PENNECO OIL CO INC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: CHEREP 5
 
|-
 
|-
 
| First Permit Date: 2010-03-15
 
| First Permit Date: 2010-03-15
Line 17: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Violations: None
+
| Well Status: ACTIVE
 +
|-
 +
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.484261
 
| Latitude: 40.484261
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2010-0
| style="text-align:right;" | 3671.0
+
| style="text-align:right;" | 6612.0
 +
| style="text-align:right;" | 214.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 387.4
 +
| style="text-align:right;" | 214.0
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 6919.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 50.19
+
| style="text-align:right;" | 351.52
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
|-
 
|-
Line 52: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2013-0
| style="text-align:right;" | 6919.0
+
| style="text-align:right;" | 3671.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 351.52
+
| style="text-align:right;" | 50.19
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2014-0
| style="text-align:right;" | 6612.0
+
| style="text-align:right;" | 4261.0
| style="text-align:right;" | 214.0
+
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
| style="text-align:right;" | 387.4
+
| style="text-align:right;" | 39.68
| style="text-align:right;" | 214.0
+
| style="text-align:right;" | 365.0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 88: Line 113:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 95: Line 120:
 
| 2010-0
 
| 2010-0
 
| FRACING FLUID WASTE
 
| FRACING FLUID WASTE
| style="text-align:right;" | 1360.0
+
| style="text-align:right;" | 1.0
 
| Bbl
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 110: Line 135:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| SALTSBURG
 
| PA
 
| PA
Line 121: Line 146:
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
| HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE
+
| CREEKSIDE TREATMENT FACILITY
 
| CREEKSIDE
 
| CREEKSIDE
 
| PA
 
| PA
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 133: Line 164:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1877536
 
| 1877536
Line 138: Line 171:
 
| No Violations Noted
 
| No Violations Noted
 
| On April 15th, 2010 I conducted a routine inspection of the above site.  Drilling was taking place at the time of the inspection.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The drilling pits looked to be in good condition and were well below the minimum 2' of freeboard.
 
| On April 15th, 2010 I conducted a routine inspection of the above site.  Drilling was taking place at the time of the inspection.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The drilling pits looked to be in good condition and were well below the minimum 2' of freeboard.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 145: Line 180:
 
| No Violations Noted
 
| No Violations Noted
 
| COMPLAINT #27065 NOISE AND SOAP IN THE AIR. THE RIG HAS MOVED FROM THIS SITE AND THERE IS NOT ANY SOAP IN THE PIT.
 
| COMPLAINT #27065 NOISE AND SOAP IN THE AIR. THE RIG HAS MOVED FROM THIS SITE AND THERE IS NOT ANY SOAP IN THE PIT.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 152: Line 189:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING AT 3343'. ESTIMATED TD AT 3500'.
 
| DRILLING AT 3343'. ESTIMATED TD AT 3500'.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 159: Line 198:
 
| No Violations Noted
 
| No Violations Noted
 
| DAVE HILL DRILLING AT 1949'. 7' CASING TO BE SET AT 2109'.
 
| DAVE HILL DRILLING AT 1949'. 7' CASING TO BE SET AT 2109'.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 166: Line 207:
 
| No Violations Noted
 
| No Violations Noted
 
| On April 30th, 2010 I conducted an inspection of the above site in response to several odor complaints.  Drilling was completed at the time of the inspection.  A swabbing rig was on site and likely the source of the odors.  The frac pit had been recently constructed.  The drilling pits looked to be in good condition.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached.
 
| On April 30th, 2010 I conducted an inspection of the above site in response to several odor complaints.  Drilling was completed at the time of the inspection.  A swabbing rig was on site and likely the source of the odors.  The frac pit had been recently constructed.  The drilling pits looked to be in good condition.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 173: Line 216:
 
| No Violations Noted
 
| No Violations Noted
 
| RIG SET UP BAILING. E&S OK.
 
| RIG SET UP BAILING. E&S OK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 180: Line 225:
 
| No Violations Noted
 
| No Violations Noted
 
| COMPLAINT # 271010 FOR ODORS. RIG BAILING WELL CAUSING SOME ODORS. CREW WILL FINISH UP 4/29/10.
 
| COMPLAINT # 271010 FOR ODORS. RIG BAILING WELL CAUSING SOME ODORS. CREW WILL FINISH UP 4/29/10.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 187: Line 234:
 
| No Violations Noted
 
| No Violations Noted
 
| WELL SWABED. TUBING IN. RUNNING RODS.
 
| WELL SWABED. TUBING IN. RUNNING RODS.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 194: Line 243:
 
| No Violations Noted
 
| No Violations Noted
 
| SITE IS CLEAN, AND PIT LEVEL OK. SERVICE RIG ON SITE BUT NOT SET UP.
 
| SITE IS CLEAN, AND PIT LEVEL OK. SERVICE RIG ON SITE BUT NOT SET UP.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 201: Line 252:
 
| No Violations Noted
 
| No Violations Noted
 
| SITE IS GRADED AND PIT IS GONE.SITE NEEDS SEEDED.RODS IN NO JACK.
 
| SITE IS GRADED AND PIT IS GONE.SITE NEEDS SEEDED.RODS IN NO JACK.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 208: Line 261:
 
| No Violations Noted
 
| No Violations Noted
 
| DRILLING COMPLETE.THERE NO JACK BUT TUBING AND RODS ARE IN. TANK IS SET AND DIKED.THE ACCESS ROAD IS STONED.
 
| DRILLING COMPLETE.THERE NO JACK BUT TUBING AND RODS ARE IN. TANK IS SET AND DIKED.THE ACCESS ROAD IS STONED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 215: Line 270:
 
| No Violations Noted
 
| No Violations Noted
 
| On July 9th, 2010 I conducted a routine inspection of the above site.  Drilling had been completed and the well was in production.  The pits have been closed and filled.  The tanks were in place and a dike constructed around them.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The site was graded, seeded, and mulched.  The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached.
 
| On July 9th, 2010 I conducted a routine inspection of the above site.  Drilling had been completed and the well was in production.  The pits have been closed and filled.  The tanks were in place and a dike constructed around them.  A site ID sign and E&S plan were posted at the site.  The access road was in good condition.  All E&S controls were in place and constructed according to the plan at site.  The site was graded, seeded, and mulched.  The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 222: Line 279:
 
| No Violations Noted
 
| No Violations Noted
 
| ODOR COMPLAINT #272590. SLIGHT CRUDE ODOR FROM TANK VENT. OPERATOR WILL INSTALL A CARBON FILTER.
 
| ODOR COMPLAINT #272590. SLIGHT CRUDE ODOR FROM TANK VENT. OPERATOR WILL INSTALL A CARBON FILTER.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 229: Line 288:
 
| No Violations Noted
 
| No Violations Noted
 
| OIL AND GAS WELL. SITE RESTORED. OIL TANK HAS A VAPOR FILTER. ALL WELL EQUIPTMENT IS FENCED.
 
| OIL AND GAS WELL. SITE RESTORED. OIL TANK HAS A VAPOR FILTER. ALL WELL EQUIPTMENT IS FENCED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 236: Line 297:
 
| No Violations Noted
 
| No Violations Noted
 
| OIL AND GAS WELL. TANKS WITH VAPOR FILTERS. EQUIPTMENT FENCED AND LOCKED. SITE AND ACCESS STONED.
 
| OIL AND GAS WELL. TANKS WITH VAPOR FILTERS. EQUIPTMENT FENCED AND LOCKED. SITE AND ACCESS STONED.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 21:49, 25 June 2015

Well Details

Well ID: 37-003-22111
Loading map...
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: CHEREP 5
First Permit Date: 2010-03-15
Last Permit Date: 2010-03-15
Spud Date: 2010-04-12
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.484261
Longitude: -79.713102

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 6612.0 214.0 0.0 0.0 387.4 214.0
2011-0 6919.0 365.0 0.0 0.0 351.52 365.0
2012-0 4841.0 366.0 0.0 0.0 297.63 366.0
2013-0 3671.0 365.0 0.0 0.0 50.19 365.0
2014-0 4261.0 365.0 0.0 0.0 39.68 365.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-0 DRILLING FLUID WASTE 385.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 PRODUCED FLUID 25.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-0 PRODUCED FLUID 25.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1877536 2010-04-15 No Violations Noted On April 15th, 2010 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The drilling pits looked to be in good condition and were well below the minimum 2' of freeboard.
1882813 2010-04-20 No Violations Noted COMPLAINT #27065 NOISE AND SOAP IN THE AIR. THE RIG HAS MOVED FROM THIS SITE AND THERE IS NOT ANY SOAP IN THE PIT.
1882829 2010-04-19 No Violations Noted DRILLING AT 3343'. ESTIMATED TD AT 3500'.
1882842 2010-04-15 No Violations Noted DAVE HILL DRILLING AT 1949'. 7' CASING TO BE SET AT 2109'.
1883344 2010-04-30 No Violations Noted On April 30th, 2010 I conducted an inspection of the above site in response to several odor complaints. Drilling was completed at the time of the inspection. A swabbing rig was on site and likely the source of the odors. The frac pit had been recently constructed. The drilling pits looked to be in good condition. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached.
1884491 2010-04-28 No Violations Noted RIG SET UP BAILING. E&S OK.
1884504 2010-04-28 No Violations Noted COMPLAINT # 271010 FOR ODORS. RIG BAILING WELL CAUSING SOME ODORS. CREW WILL FINISH UP 4/29/10.
1884518 2010-04-30 No Violations Noted WELL SWABED. TUBING IN. RUNNING RODS.
1884575 2010-04-22 No Violations Noted SITE IS CLEAN, AND PIT LEVEL OK. SERVICE RIG ON SITE BUT NOT SET UP.
1894963 2010-05-13 No Violations Noted SITE IS GRADED AND PIT IS GONE.SITE NEEDS SEEDED.RODS IN NO JACK.
1895036 2010-06-15 No Violations Noted DRILLING COMPLETE.THERE NO JACK BUT TUBING AND RODS ARE IN. TANK IS SET AND DIKED.THE ACCESS ROAD IS STONED.
1904613 2010-07-09 No Violations Noted On July 9th, 2010 I conducted a routine inspection of the above site. Drilling had been completed and the well was in production. The pits have been closed and filled. The tanks were in place and a dike constructed around them. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The site was graded, seeded, and mulched. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached.
1912623 2010-08-02 No Violations Noted ODOR COMPLAINT #272590. SLIGHT CRUDE ODOR FROM TANK VENT. OPERATOR WILL INSTALL A CARBON FILTER.
1927308 2010-10-05 No Violations Noted OIL AND GAS WELL. SITE RESTORED. OIL TANK HAS A VAPOR FILTER. ALL WELL EQUIPTMENT IS FENCED.
1947179 2011-01-07 No Violations Noted OIL AND GAS WELL. TANKS WITH VAPOR FILTERS. EQUIPTMENT FENCED AND LOCKED. SITE AND ACCESS STONED.