{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.484261,"lon":-79.713103,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: CHEREP 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-15 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.484261 | |
Longitude: -79.713103 |
Date | Event |
---|---|
2010-03-15 | New Permit Application |
2010-04-12 | Performed Spud Operation |
2010-04-19 | Drilling Completion |
2010-04-27 | Perforation |
2010-09-28 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | 6,612.00 | 214 | 387.40 | 214 | 0.00 | 0 |
2011 | PENNECO OIL CO INC | 6,919.00 | 365 | 351.52 | 365 | 0.00 | 0 |
2012 | PENNECO OIL CO INC | 4,841.00 | 366 | 297.63 | 366 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 3,671.00 | 365 | 50.19 | 365 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 4,261.00 | 365 | 39.68 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 4,014.47 | 365 | 222.21 | 61 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 3,974.89 | 366 | 94.67 | 31 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 3,389.00 | 337 | 95.98 | 337 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 4,103.38 | 365 | 83.56 | 31 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 3,966.17 | 365 | 58.82 | 31 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PENNECO OIL CO INC | Produced Fluid | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Drilling Fluid Waste | 385.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PENNECO OIL CO INC | Produced Fluid | 25.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1877536 | Primary Facility | 2010-04-15 | Routine/Complete Inspection | No Violations Noted | On April 15th, 2010 I conducted a routine inspection of the above site. Drilling was taking place at the time of the inspection. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The drilling pits looked to be in good condition and were well below the minimum 2' of freeboard. |
1882813 | Primary Facility | 2010-04-20 | Complaint Inspection | No Violations Noted | COMPLAINT #27065 NOISE AND SOAP IN THE AIR. THE RIG HAS MOVED FROM THIS SITE AND THERE IS NOT ANY SOAP IN THE PIT. |
1882829 | Primary Facility | 2010-04-19 | Drilling/Alteration | No Violations Noted | DRILLING AT 3343'. ESTIMATED TD AT 3500'. |
1882842 | Primary Facility | 2010-04-15 | Drilling/Alteration | No Violations Noted | DAVE HILL DRILLING AT 1949'. 7' CASING TO BE SET AT 2109'. |
1883344 | Primary Facility | 2010-04-30 | Routine/Complete Inspection | No Violations Noted | On April 30th, 2010 I conducted an inspection of the above site in response to several odor complaints. Drilling was completed at the time of the inspection. A swabbing rig was on site and likely the source of the odors. The frac pit had been recently constructed. The drilling pits looked to be in good condition. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached. |
1884491 | Primary Facility | 2010-04-28 | Drilling/Alteration | No Violations Noted | RIG SET UP BAILING. E&S OK. |
1884504 | Primary Facility | 2010-04-28 | Complaint Inspection | No Violations Noted | COMPLAINT # 271010 FOR ODORS. RIG BAILING WELL CAUSING SOME ODORS. CREW WILL FINISH UP 4/29/10. |
1884518 | Primary Facility | 2010-04-30 | Drilling/Alteration | No Violations Noted | WELL SWABED. TUBING IN. RUNNING RODS. |
1884575 | Primary Facility | 2010-04-22 | Drilling/Alteration | No Violations Noted | SITE IS CLEAN, AND PIT LEVEL OK. SERVICE RIG ON SITE BUT NOT SET UP. |
1894963 | Primary Facility | 2010-05-13 | Drilling/Alteration | No Violations Noted | SITE IS GRADED AND PIT IS GONE.SITE NEEDS SEEDED.RODS IN NO JACK. |
1895036 | Primary Facility | 2010-06-15 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE.THERE NO JACK BUT TUBING AND RODS ARE IN. TANK IS SET AND DIKED.THE ACCESS ROAD IS STONED. |
1904613 | Primary Facility | 2010-07-09 | Routine/Complete Inspection | No Violations Noted | On July 9th, 2010 I conducted a routine inspection of the above site. Drilling had been completed and the well was in production. The pits have been closed and filled. The tanks were in place and a dike constructed around them. A site ID sign and E&S plan were posted at the site. The access road was in good condition. All E&S controls were in place and constructed according to the plan at site. The site was graded, seeded, and mulched. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and uniform 70% vegetative cover is reached. |
1912623 | Primary Facility | 2010-08-02 | Complaint Inspection | No Violations Noted | ODOR COMPLAINT #272590. SLIGHT CRUDE ODOR FROM TANK VENT. OPERATOR WILL INSTALL A CARBON FILTER. |
1927308 | Primary Facility | 2010-10-05 | Routine/Complete Inspection | No Violations Noted | OIL AND GAS WELL. SITE RESTORED. OIL TANK HAS A VAPOR FILTER. ALL WELL EQUIPTMENT IS FENCED. |
1947179 | Primary Facility | 2011-01-07 | Routine/Complete Inspection | No Violations Noted | OIL AND GAS WELL. TANKS WITH VAPOR FILTERS. EQUIPTMENT FENCED AND LOCKED. SITE AND ACCESS STONED. |