X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24491"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-111-24491
 
| Well ID: 34-111-24491
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8322344936, -81.2609447421 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.83223449, -81.26094474 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Monroe County, Ohio|Monroe]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date: 2014-09-18
 
|-
 
|-
| Unconventional:
+
| Unconventional:  
 
|-
 
|-
| Horizontal:
+
| Configuration:  
 
|-
 
|-
| Producing:
+
| Well Status: Cancelled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.8322344936
+
| Latitude: 39.83223449
 
|-
 
|-
| Longitude: -81.2609447421
+
| Longitude: -81.26094474
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1411161090
 +
| 2014-09-19
 +
|
 +
| Status check inspection found Rocky Mountain drillings top hole rig has drilled a 32'' x 80' conductor borehole and set 80' of 26'' conductor in place with a variance granted by the Division to set 80' of conductor due to being in solid limestone bedrock at 60' freshwater was also encountered at 27'. Allied cement services are on location and cementing the casing using 228 sacks of class A-2% calcium .25 pps flake with 30% open hole excess ran and 46.5 barrels of fresh water used for cement displacement with good cement returns to surface. The hole was spudded on 09/18/14.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1415997179
 +
| 2014-11-14
 +
|
 +
| On the day of my inspection to witness the surface casing cement job the following was observed- Dallas Morris Drilling rig # 24 is now on the hole and has drilled a 24''x 397' surface borehole and ran 376' of 18.625'' J-55 casing. Allied Cement services are on location to cement the casing using 376 sacks of Class A 2% calcium .25 pps flake cement with 100% open hole cement excess ran and 25 barrels of 6% gel ran ahead with cement displacement to be 102 barrels of fresh water and the casing to be pressure tested to 500 psi above lift pressure upon the landing of the plug and good cement returns to surface.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1640490395
 +
| 2014-11-17
 +
|
 +
| Status check inspection of the running and cementing of the 13.375''  1st intermediate casing string set to a depth of 2,131' with Dallas Morris rig 24 on location and the 17.5'' 1st intermediate well bore drilled to 2,152'. Allied Cement service are on location to cement the casing using 1,805 sacks of Class A-2% Calcium .25 pps flake cement.
 +
|
 +
|
 +
|
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 18:47, 14 July 2015

Well Details

Well ID: 34-111-24491
Loading map...
County: Monroe
Municipality:
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-09-18
Unconventional:
Configuration:
Well Status: Cancelled
Violations: 0
Latitude: 39.83223449
Longitude: -81.26094474

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1411161090 2014-09-19 Status check inspection found Rocky Mountain drillings top hole rig has drilled a 32 x 80' conductor borehole and set 80' of 26 conductor in place with a variance granted by the Division to set 80' of conductor due to being in solid limestone bedrock at 60' freshwater was also encountered at 27'. Allied cement services are on location and cementing the casing using 228 sacks of class A-2% calcium .25 pps flake with 30% open hole excess ran and 46.5 barrels of fresh water used for cement displacement with good cement returns to surface. The hole was spudded on 09/18/14.
1415997179 2014-11-14 On the day of my inspection to witness the surface casing cement job the following was observed- Dallas Morris Drilling rig # 24 is now on the hole and has drilled a 24x 397' surface borehole and ran 376' of 18.625 J-55 casing. Allied Cement services are on location to cement the casing using 376 sacks of Class A 2% calcium .25 pps flake cement with 100% open hole cement excess ran and 25 barrels of 6% gel ran ahead with cement displacement to be 102 barrels of fresh water and the casing to be pressure tested to 500 psi above lift pressure upon the landing of the plug and good cement returns to surface.
1640490395 2014-11-17 Status check inspection of the running and cementing of the 13.375 1st intermediate casing string set to a depth of 2,131' with Dallas Morris rig 24 on location and the 17.5 1st intermediate well bore drilled to 2,152'. Allied Cement service are on location to cement the casing using 1,805 sacks of Class A-2% Calcium .25 pps flake cement.