Well Details

Well ID: 34-111-24491
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001063
Farm/Lease Name: LORADITCH SOUTH UNIT
License Status: Final Restoration
License Date: 2018-11-29
Spud Date: 2014-09-18
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-11-17
Well Total Depth: 2152.00 ft
Configuration: Horizontal
Latitude: 39.830000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-16 Proposed Formations:POINT PLEASANT, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-11-10 Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:659.424, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-11-17
APP 2016-01-27 Proposed Formations:POINT PLEASANT, Issued Date:1/27/2016, Expired Date:1/26/2018 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:POOL
Completion Report Received 2018-08-22
APP 2018-11-29 Proposed Formations:POINT PLEASANT, Issued Date:11/29/2018, Expired Date:11/28/2020 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2019-01-18
Record Last Modified 2019-05-01
Construction Permit Expires 2020-11-28

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-319226595 2019-1-18 0:00: PB No Violations 4.50
0118425426 2018-03-07 Drill / Deepen / Reopen No Violations Status check inspection found a night cap installed on the B-section of the well head. Records indicate the well was drilled to the point of the 13.375 1st intermediate with conductor and 18.625 surface being set also. The drilling permit expired on 01/26/2018.
0319226595 2019-01-18 Plug / Plug Back No Violations On this day, I am onsite to witness the plugging operation conducted by Stalnaker Energy Corporation and Formation Cementing. Antero Representative Barney Etcher is onsite. The 13.375 inch diameter intermediate casing string set at a depth of 2,132 feet, and never drilled out. 9-Energy ran a Cement Bond Log on 1/16/2019 confirming the casing was cemented to surface, and tagged bottom at a depth of 2,047 feet. Stalnaker Energy has a service rig on the hole with 2.375 inch diameter upset tubing set at a depth of 2,041 feet within the 13.375 inch diameter intermediate casing. The bottom plug covers approximately 310 feet (2,041-1731) and consists of 230 sacks Class A Cement (48 barrels total volume) with 1.18 yield and a weight of 15.6 pounds per gallon. It was displaced with 6.5 barrels of fresh water. Then, 49 joints of tubing were pulled to a depth of 489 feet. The bottom of surface plug covers approximately 250 feet (489-239) and consists of 184 sacks Class A Cement (39 barrels total volume) with 1.18 yield and a weight of 15.6 pounds per gallon. It was displaced with 1 barrel of fresh water. Prior to the surface plug being set, the wellhead is being broken down below grade. It is welded together and will be cut off, before cementing. The surface plug will be unwitnessed.
0551787909 2016-04-07 Preliminary Restoration No Violations The company has restored the area affected by the well pad construction in accordance of ORC 1509.072 with erosion control and vegetation established. Addressing the well status - the company has canceled the permit and will finish drilling the well under a new API #. The well has had the conductor -surface and 1st intermediate casing strings set. Multiple wells exist on the well pad.
0554980276 2019-03-01 Final Restoration No Violations On this day, I am conducting a final restoration inspection. The pad has existing wells in production, and the cellar remains, but has been filled with gravel. Site meets ORC 1509.072 (B).
1135549497 2019-01-14 Plug / Plug Back No Violations On this day, I spoke with Antero Company Representative Jayson Lukes during the inspection. The producing wells on the pad (permit numbers 4489, 4490, 4492, 4494) are being prepped per Anteros SIMOPS plan that was submitted and reviewed by the ODNR DOGRM, before Stalnaker Energy rigs-up for the plug and abandonment of permit numbers 4491 and 4493. TekSolv is currently onsite setting the back pressure valve. The producing wells have been blown down, are having back pressure valves installed in the tubing hangers, steel cages placed over the wellheads, LEL monitors in place, and concrete Jersey barriers spotted around the perimeter of the wellheads. It will be noted that a 2-way check valve will not be placed in the tubing, as the SIMOPS plan originally stated. I spoke with Jayson Lukes and ODNR Inspector Ken Frye about the amendment to the plan.
118425426 2018-3-7 0:00:0 DD No Violations
1411161090 2014-09-19 Casing String Witnessed No Violations Status check inspection found Rocky Mountain drillings top hole rig has drilled a 32 x 80 conductor borehole and set 80 of 26 conductor in place with a variance granted by the Division to set 80 of conductor due to being in solid limestone bedrock at 60 freshwater was also encountered at 27. Allied cement services are on location and cementing the casing using 228 sacks of class A-2% calcium .25 pps flake with 30% open hole excess ran and 46.5 barrels of fresh water used for cement displacement with good cement returns to surface. The hole was spudded on 09/18/14.
1415997179 2014-11-14 Casing String Witnessed No Violations On the day of my inspection to witness the surface casing cement job the following was observed- Dallas Morris Drilling rig # 24 is now on the hole and has drilled a 24x 397 surface borehole and ran 376 of 18.625 J-55 casing. Allied Cement services are on location to cement the casing using 376 sacks of Class A 2% calcium .25 pps flake cement with 100% open hole cement excess ran and 25 barrels of 6% gel ran ahead with cement displacement to be 102 barrels of fresh water and the casing to be pressure tested to 500 psi above lift pressure upon the landing of the plug and good cement returns to surface.
1640490395 2014-11-17 Casing String Witnessed No Violations Status check inspection of the running and cementing of the 13.375 1st intermediate casing string set to a depth of 2,131 with Dallas Morris rig 24 on location and the 17.5 1st intermediate well bore drilled to 2,152. Allied Cement service are on location to cement the casing using 1,805 sacks of Class A-2% Calcium .25 pps flake cement.
551787909 2016-4-7 0:00:0 PL No Violations 0.20
554980276 2019-3-1 0:00:0 FR No Violations 0.10

For data sources see[3]