X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24525"

m
m
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Franklin,_Monroe_County,_Ohio|Franklin]]
+
| Municipality: [[Franklin_Township,_Monroe_County,_Ohio|Franklin Township]]
 
|-
 
|-
 
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID: [[1132]]
+
| Well Pad ID: [[001132]]
 
|-
 
|-
 
| Farm/Lease Name: BENATAR UNIT
 
| Farm/Lease Name: BENATAR UNIT
Line 37: Line 37:
 
| Longitude: -81.29766906
 
| Longitude: -81.29766906
 
|}
 
|}
For data sources see<ref name=RBDMS>{{cite web
+
For data sources see<ref>{{cite web
  | title = RBDMS
+
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  | date =  2019-05-07  
 
  | date =  2019-05-07  
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Perforation Treatments ==
+
== Well History ==
{| class="wikitable sortable" style="width: 50%"
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Interval Top (ft)
 
!scope="col" style="text-align: center"| Interval Base (ft)
 
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|}-->
 
 
 
== Production Data ==
 
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Period
+
!scope="col" style="text-align: center"| Well Status
!scope="col" style="text-align: center"| Operator Name
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" style="text-align: center"| Gas Quantity (mcf)
+
!scope="col" style="text-align: center"| Comment
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 
!scope="col" style="text-align: center"| Production Days
 
 
|-
 
|-
| 2016
+
| APP
| [[ANTERO RESOURCES  CORPORATION]]
+
| 2014-09-25
| style="text-align: right;" | 2069742
+
| Proposed Formations:POINT PLEASANT, Issued Date:9/25/2014, Expired Date:9/24/2016 12:00:00 PM, Drilling unit acres:203.771, Proposed Well Type:OG, Proposed Well Class:EOUT
| style="text-align: right;" | 586
 
| style="text-align: right;" | 353
 
 
|-
 
|-
| 2017
+
| APP
| [[ANTERO RESOURCES  CORPORATION]]
+
| 2015-02-06
| style="text-align: right;" | 846275
+
| Proposed Formations:POINT PLEASANT, Issued Date:2/6/2015, Expired Date:2/5/2017 12:00:00 PM, Drilling unit acres:293.016, Proposed Well Type:OG, Proposed Well Class:EOUT
| style="text-align: right;" | 165
 
| style="text-align: right;" | 365
 
 
|-
 
|-
| 2018
+
| Correction to Well
| [[ANTERO RESOURCES  CORPORATION]]
+
| 2015-07-31
| style="text-align: right;" | 522784
+
| CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
| style="text-align: right;" | 186
 
| style="text-align: right;" | 362
 
 
|-
 
|-
| 2019
+
| Reached Total Depth
| [[ANTERO RESOURCES  CORPORATION]]
+
| 2016-03-04
| style="text-align: right;" | 98392
+
|  
| style="text-align: right;" | 75
 
| style="text-align: right;" | 90
 
 
|-
 
|-
|}
+
| Completion Report Received
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
+
| 2016-03-23
| title = Ohio Combined Annual Production Data
+
|  
|publisher = [[Ohio Department of Natural Resources]]
 
| date = 2019-05-07
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable"
 
!scope="col" style="text-align: center"| Period
 
!scope="col" style="text-align: center"| Operator Name
 
!scope="col" style="text-align: center"| Waste Type
 
!scope="col" style="text-align: center"| Quantity (bbl)
 
!scope="col" style="text-align: center"| Production Days
 
 
|-
 
|-
| 2016
+
| Construction Permit Expires
| [[ANTERO RESOURCES  CORPORATION]]
+
| 2017-02-05
| Brine
+
|  
| style="text-align: right;" | 25521
 
| style="text-align: right;" | 353
 
 
|-
 
|-
| 2017
+
| Record Last Modified
| [[ANTERO RESOURCES  CORPORATION]]
+
| 2017-10-23
| Brine
+
|  
| style="text-align: right;" | 5401
 
| style="text-align: right;" | 365
 
|-
 
| 2018
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| Brine
 
| style="text-align: right;" | 3131
 
| style="text-align: right;" | 362
 
|-
 
| 2019
 
| [[ANTERO RESOURCES  CORPORATION]]
 
| Brine
 
| style="text-align: right;" | 548
 
| style="text-align: right;" | 90
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
+
For data sources see<ref>{{cite web
== Inspection Data ==
+
| title = Risk Based Data Management System - Well and WellHistry Tables
==== Inspections Performed ====
+
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Inspection ID
+
!scope="col" style="text-align: center"| Perforation Date
!scope="col" style="text-align: center"| Inspection Date
+
!scope="col" style="text-align: center"| Interval Top (ft)
!scope="col" style="text-align: center"| Inspection Type
+
!scope="col" style="text-align: center"| Interval Base (ft)
!scope="col" style="text-align: center"| Inspection Result
+
!scope="col" style="text-align: center"| Number of Shots
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
| 0156915331
 
| 2015-05-05
 
| Casing String Witnessed
 
| No Violations
 
|  Status check inspection to witness the cementing of the 369 of 18.625 surface casing inside a 24 borehole with CalFrac cement service on location to cement the casing using 616 sacks of class A-2% calcium .25 pps lcm cement with 50% open hole cement excess ran and circulation established prior to cementing with 6% gel ran ahead and good cement returns witnessed to surface with the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug.
 
|-
 
| 0278756150
 
| 2019-02-07
 
| Production Wells
 
| No Violations
 
| On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (5) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,650 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 120 psi.
 
|-
 
| 0569941269
 
| 2015-05-12
 
| Drill / Deepen /  Reopen
 
| No Violations
 
|  Status check inspection on the current drilling process found Patterson Drilling on location drilling the 12.250 2nd intermediate well bore section at a current depth of 5,204 and implementing a 15 degree borehole nudge in the direction of 73 degrees azimuth with the company using a tri cone drill bit and misting on air with a proposed total depth to be 7,540 for this section being drilled.
 
|-
 
| 0849972733
 
| 2015-05-15
 
| Drill / Deepen /  Reopen
 
| No Violations
 
|  Status check inspection on the current drilling process fount Patterson Drilling rig # 332 on location drilling the 12.250 2nd intermediate well bore section at a current depth of 7,486 with the company currently conditioning the hole on air. The current borehole position is 70.04 degrees azimuth with a 16 degree inclination.
 
|-
 
| 0970204103
 
| 2015-05-26
 
| Drill / Deepen /  Reopen
 
| No Violations
 
|  Status check inspection on the current drilling process found Patterson Drilling rig # 332 on location drilling the 8.750 production borehole at a depth of 14,809 in the horizontal well bore section. The company is currently practicing managed pressure drilling using 12.9# mud weight and holding back 110 pounds pressure on the annular side of the drill string at surface.
 
|-
 
| 1280431380
 
| 2015-05-19
 
| Drill / Deepen /  Reopen
 
| No Violations
 
|  Status check inspection on the current drilling process found Patterson drilling rig 332 on the hole with the 9.625 2nd intermediate casing recently set to a depth of 7,564. The company has ran in the hole with the directional drilling assembly and is preparing to begin drilling the 8.750 production borehole curve and lateral, a Formation Integrity Test will be performed on the casing shoe.
 
|-
 
| 1424729509
 
| 2015-02-23
 
| Casing String Witnessed
 
| No Violations
 
|  The said well was spudded on 02/20/2015 and due to hole conditions a 36 x 40 liner string was set at surface, this was due to the well pad being a built on a old limestone quarry and the conductor hole collapsing. 02/23/2015 Express Energys top hole rig is on location and as drilled a 32 x 94 conductor borehole and ran 94 of 26 conductor pipe. Express Energy cement service is on location to cement the casing using 330 sacks of class A-2% calcium .125 pps flake with 100% open hole cement excess ran and the cement water tested for chlorides and PH prior to cementing with good cement returns witnessed to surface.
 
|-
 
| 1455736825
 
| 2016-02-17
 
| Preliminary Restoration
 
| No Violations
 
|  Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. Addressing the well status, The well drilling and completion process is now complete and all (5) of the wells on the pad are capable of production and are currently in the flow back testing stages with a company on location identified as Solid Oak flow back services monitoring the well testing. There is 3 vertical sand trap separators and 5 gas processing units on location with the sand trap separators being evacuated into a 500 barrel tank. Addressing the production fluid storage area- A total of (8) 400 barrel capacity tanks are present inside a polymer lined steel containment dike area.
 
|-
 
| 1519998364
 
| 2018-03-02
 
| Preliminary Restoration
 
| No Violations
 
|  Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section along with a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 100 (psi) pound per square inch indicated between the 9.65 and 13.375 and 900 psi between the 5.5 and 9.625.  Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Inspection ID
 
!scope="col" style="text-align: center"| Violation ID
 
!scope="col" style="text-align: center"| Violation Date
 
!scope="col" style="text-align: center"| Violation Code
 
!scope="col" style="text-align: center"| Violation Comments
 
 
|-
 
|-
 
|}-->
 
|}-->
For data sources see<ref name=RBDMS/>
 
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 446: Line 339:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name = RBDMS/>
+
For data sources see<ref>{{cite web
== Well History ==
+
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2016
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 2069742
 +
| style="text-align: right;" | 586
 +
| style="text-align: right;" | 353
 +
|-
 +
| 2017
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 846275
 +
| style="text-align: right;" | 165
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 522784
 +
| style="text-align: right;" | 186
 +
| style="text-align: right;" | 362
 +
|-
 +
| 2019
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| style="text-align: right;" | 98392
 +
| style="text-align: right;" | 75
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2016
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 25521
 +
| style="text-align: right;" | 353
 +
|-
 +
| 2017
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 5401
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 3131
 +
| style="text-align: right;" | 362
 +
|-
 +
| 2019
 +
| [[ANTERO RESOURCES  CORPORATION]]
 +
| Brine
 +
| style="text-align: right;" | 548
 +
| style="text-align: right;" | 90
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" style="text-align: center"| Well Status
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" style="width: 15%;text-align: center"| Well Status Date
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" style="text-align: center"| Comment
+
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| 0156915331
 +
| 2015-05-05
 +
| Casing String Witnessed
 +
| No Violations
 +
|  Status check inspection to witness the cementing of the 369 of 18.625 surface casing inside a 24 borehole with CalFrac cement service on location to cement the casing using 616 sacks of class A-2% calcium .25 pps lcm cement with 50% open hole cement excess ran and circulation established prior to cementing with 6% gel ran ahead and good cement returns witnessed to surface with the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug.
 +
|-
 +
| 0278756150
 +
| 2019-02-07
 +
| Production Wells
 +
| No Violations
 +
| On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (5) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,650 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 120 psi.
 
|-
 
|-
| APP
+
| 0569941269
| 2014-09-25
+
| 2015-05-12
| Proposed Formations:POINT PLEASANT, Issued Date:9/25/2014, Expired Date:9/24/2016 12:00:00 PM, Drilling unit acres:203.771, Proposed Well Type:OG, Proposed Well Class:EOUT
+
| Drill / Deepen / Reopen
 +
| No Violations
 +
|  Status check inspection on the current drilling process found Patterson Drilling on location drilling the 12.250 2nd intermediate well bore section at a current depth of 5,204 and implementing a 15 degree borehole nudge in the direction of 73 degrees azimuth with the company using a tri cone drill bit and misting on air with a proposed total depth to be 7,540 for this section being drilled.
 
|-
 
|-
| APP
+
| 0849972733
| 2015-02-06
+
| 2015-05-15
| Proposed Formations:POINT PLEASANT, Issued Date:2/6/2015, Expired Date:2/5/2017 12:00:00 PM, Drilling unit acres:293.016, Proposed Well Type:OG, Proposed Well Class:EOUT
+
| Drill / Deepen / Reopen
 +
| No Violations
 +
|  Status check inspection on the current drilling process fount Patterson Drilling rig # 332 on location drilling the 12.250 2nd intermediate well bore section at a current depth of 7,486 with the company currently conditioning the hole on air. The current borehole position is 70.04 degrees azimuth with a 16 degree inclination.
 
|-
 
|-
| Correction to Well
+
| 0970204103
| 2015-07-31
+
| 2015-05-26
| CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
+
| Drill / Deepen /  Reopen
 +
| No Violations
 +
|  Status check inspection on the current drilling process found Patterson Drilling rig # 332 on location drilling the 8.750 production borehole at a depth of 14,809 in the horizontal well bore section. The company is currently practicing managed pressure drilling using 12.9# mud weight and holding back 110 pounds pressure on the annular side of the drill string at surface.
 
|-
 
|-
| Reached Total Depth
+
| 1280431380
| 2016-03-04
+
| 2015-05-19
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 +
|  Status check inspection on the current drilling process found Patterson drilling rig 332 on the hole with the 9.625 2nd intermediate casing recently set to a depth of 7,564. The company has ran in the hole with the directional drilling assembly and is preparing to begin drilling the 8.750 production borehole curve and lateral, a Formation Integrity Test will be performed on the casing shoe.
 
|-
 
|-
| Completion Report Received
+
| 1424729509
| 2016-03-23
+
| 2015-02-23
|  
+
| Casing String Witnessed
 +
| No Violations
 +
|  The said well was spudded on 02/20/2015 and due to hole conditions a 36 x 40 liner string was set at surface, this was due to the well pad being a built on a old limestone quarry and the conductor hole collapsing. 02/23/2015 Express Energys top hole rig is on location and as drilled a 32 x 94 conductor borehole and ran 94 of 26 conductor pipe. Express Energy cement service is on location to cement the casing using 330 sacks of class A-2% calcium .125 pps flake with 100% open hole cement excess ran and the cement water tested for chlorides and PH prior to cementing with good cement returns witnessed to surface.
 
|-
 
|-
| Construction Permit Expires
+
| 1455736825
| 2017-02-05
+
| 2016-02-17
|  
+
| Preliminary Restoration
 +
| No Violations
 +
|  Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. Addressing the well status, The well drilling and completion process is now complete and all (5) of the wells on the pad are capable of production and are currently in the flow back testing stages with a company on location identified as Solid Oak flow back services monitoring the well testing. There is 3 vertical sand trap separators and 5 gas processing units on location with the sand trap separators being evacuated into a 500 barrel tank. Addressing the production fluid storage area- A total of (8) 400 barrel capacity tanks are present inside a polymer lined steel containment dike area.
 
|-
 
|-
| Record Last Modified
+
| 1519998364
| 2017-10-23
+
| 2018-03-02
|  
+
| Preliminary Restoration
 +
| No Violations
 +
|  Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section along with a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 100 (psi) pound per square inch indicated between the 9.65 and 13.375 and 900 psi between the 5.5 and 9.625.  Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site.
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/>
+
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 23:20, 23 July 2019

Well Details

Well ID: 34-111-24525
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Franklin Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: 001132
Farm/Lease Name: BENATAR UNIT
License Status: Producing
License Date: 2015-07-31
Spud Date: 2015-02-20
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2016-03-04
Well Total Depth: 15745 ft
Configuration: Horizontal
Latitude: 39.773898270
Longitude: -81.29766906

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-09-25 Proposed Formations:POINT PLEASANT, Issued Date:9/25/2014, Expired Date:9/24/2016 12:00:00 PM, Drilling unit acres:203.771, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2015-02-06 Proposed Formations:POINT PLEASANT, Issued Date:2/6/2015, Expired Date:2/5/2017 12:00:00 PM, Drilling unit acres:293.016, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2015-07-31 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2016-03-04
Completion Report Received 2016-03-23
Construction Permit Expires 2017-02-05
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/23/2015 01/08/2016 8255 10,812,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.1516 150987
Hydrogen Chloride 7647-01-0 18 0.03621 36066
WFRA-405 U.S. Well Services Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.02007 19992.1
Water 7732-18-5 60 0.04987 49669.7
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02494 24834.9
Ethoxylated alcohol blend 68002-97-1 4 0.00332 3311.31
LGC-15 U.S. Well Services Gelling Agents Guar Gum 9000-30-0 50 0.09103 90665.5
Petroleum Distillates 64742-47-8 60 0.08621 85865.5
Surfactant 68439-51-0 3 0.00546 5439.93
Suspending agent (solid) 14808-60-7 3 0.01392 13866.5
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00227 2265
AI-302 U.S. Well Services Acid Corrosion Inhibitors 2-Propyn-1-olcompound with methyloxirane 38172-91-7 15 0.0001 100.08
Water 7732-18-5 95 0.00064 633.84
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00425 4231.36
Deionized Water 7732-18-5 28 0.00243 2416.93
SI-1100 U.S. Well Services Scale Inhibitor Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00083 825.618
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.0015 1498.81
Water 7732-18-5 80 0.0102 10161.5
Ethylene Glycol 107-21-1 25 0.0036 3588.26
Potassium salt of diethylene triamine penta (methylene phosphonic acid) 15827-60-8 7.5 0.00129 1286.06
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00033 330.247
Phosphino carboxylic acid polymer 71050-62-9 5 0.00083 825.618
Water Antero Resources Base Fluid Water 7732-18-5 100 90.5439 90,177,500.0
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 8.94514 8,908,940.0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-12-23 H2O 15 6232 Bbl 220670 US Well Services Inc STAGE 1/40

60 SHOTS STAGES 2-39 SEE IMAGES

2016-01-08 H2O 15 6412 Bbl 230180 US Well Services Inc STAGE 40/40

60 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ANTERO RESOURCES CORPORATION 2069742 586 353
2017 ANTERO RESOURCES CORPORATION 846275 165 365
2018 ANTERO RESOURCES CORPORATION 522784 186 362
2019 ANTERO RESOURCES CORPORATION 98392 75 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ANTERO RESOURCES CORPORATION Brine 25521 353
2017 ANTERO RESOURCES CORPORATION Brine 5401 365
2018 ANTERO RESOURCES CORPORATION Brine 3131 362
2019 ANTERO RESOURCES CORPORATION Brine 548 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0156915331 2015-05-05 Casing String Witnessed No Violations Status check inspection to witness the cementing of the 369 of 18.625 surface casing inside a 24 borehole with CalFrac cement service on location to cement the casing using 616 sacks of class A-2% calcium .25 pps lcm cement with 50% open hole cement excess ran and circulation established prior to cementing with 6% gel ran ahead and good cement returns witnessed to surface with the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug.
0278756150 2019-02-07 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (5) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,650 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 120 psi.
0569941269 2015-05-12 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Patterson Drilling on location drilling the 12.250 2nd intermediate well bore section at a current depth of 5,204 and implementing a 15 degree borehole nudge in the direction of 73 degrees azimuth with the company using a tri cone drill bit and misting on air with a proposed total depth to be 7,540 for this section being drilled.
0849972733 2015-05-15 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process fount Patterson Drilling rig # 332 on location drilling the 12.250 2nd intermediate well bore section at a current depth of 7,486 with the company currently conditioning the hole on air. The current borehole position is 70.04 degrees azimuth with a 16 degree inclination.
0970204103 2015-05-26 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Patterson Drilling rig # 332 on location drilling the 8.750 production borehole at a depth of 14,809 in the horizontal well bore section. The company is currently practicing managed pressure drilling using 12.9# mud weight and holding back 110 pounds pressure on the annular side of the drill string at surface.
1280431380 2015-05-19 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Patterson drilling rig 332 on the hole with the 9.625 2nd intermediate casing recently set to a depth of 7,564. The company has ran in the hole with the directional drilling assembly and is preparing to begin drilling the 8.750 production borehole curve and lateral, a Formation Integrity Test will be performed on the casing shoe.
1424729509 2015-02-23 Casing String Witnessed No Violations The said well was spudded on 02/20/2015 and due to hole conditions a 36 x 40 liner string was set at surface, this was due to the well pad being a built on a old limestone quarry and the conductor hole collapsing. 02/23/2015 Express Energys top hole rig is on location and as drilled a 32 x 94 conductor borehole and ran 94 of 26 conductor pipe. Express Energy cement service is on location to cement the casing using 330 sacks of class A-2% calcium .125 pps flake with 100% open hole cement excess ran and the cement water tested for chlorides and PH prior to cementing with good cement returns witnessed to surface.
1455736825 2016-02-17 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. Addressing the well status, The well drilling and completion process is now complete and all (5) of the wells on the pad are capable of production and are currently in the flow back testing stages with a company on location identified as Solid Oak flow back services monitoring the well testing. There is 3 vertical sand trap separators and 5 gas processing units on location with the sand trap separators being evacuated into a 500 barrel tank. Addressing the production fluid storage area- A total of (8) 400 barrel capacity tanks are present inside a polymer lined steel containment dike area.
1519998364 2018-03-02 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section along with a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 100 (psi) pound per square inch indicated between the 9.65 and 13.375 and 900 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (4) gas processing units one for each well head on location. At the right front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site.

For data sources see[9]

References