If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| Province: Manitoba | | Province: Manitoba | ||
|- | |- | ||
− | | Division: [[Division No. | + | | Division: [[Division No. 6,_Manitoba|Division No. 6]] |
|- | |- | ||
− | | Subdivision: [[Wallace-Woodworth,_Division No. | + | | Subdivision: [[Wallace-Woodworth,_Division No. 6,_Manitoba|Wallace-Woodworth]] |
|- | |- | ||
| Operator Name: [[Tundra Oil & Gas Limited]] | | Operator Name: [[Tundra Oil & Gas Limited]] |
Well ID: 100.08-29-010-26W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.86197694,"lon":-100.9847678,"icon":""}]} |
Well Name: Tundra Virden Prov. HZNTL | |
Country: Canada | |
Province: Manitoba | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2012-08-18 | |
License Date: 2012-06-21 | |
Well Total Depth: 1805 | |
Latitude: 49.86197694 | |
Longitude: -100.9847678 |
For data sources see[1]
Spud Date | Contractor | Rig Number |
---|---|---|
2012-08-18 | Trinidad Drilling Ltd. | D118 |
For data sources see[2]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2012-09-29 | LINER PORT | 1346 | 1346 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1304 | 1304 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1261 | 1261 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1219 | 1219 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1176 | 1176 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1134 | 1134 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1091 | 1091 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1049 | 1049 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 1006 | 1006 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 964 | 964 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 921 | 921 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 879 | 879 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 836 | 836 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 797 | 797 | 0 | N/A | 2016-06-21 |
2012-09-29 | LINER PORT | 751 | 751 | 0 | N/A | 2016-06-21 |
For data sources see[3]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 | |
2012-09-29 | FRAC | N/A | 20/40 | SAND | 4 |
For data sources see[4]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 48.10 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 28.50 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 46.60 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 38.70 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 82.90 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 50.20 | 0 | 0.00 |
For data sources see[5]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 46.20 | 16 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 53.50 | 15 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 26.10 | 17 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 13.80 | 12 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 77.90 | 39 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 75.60 | 28 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[5]