X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-20296"

m
m
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-20296
 
| Well ID: 37-115-20296
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.666794, -76.094813 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.666794, -76.094814 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Susquehanna County, Pennsylvania|Susquehanna]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Auburn Township, Susquehanna County, Pennsylvania|Auburn Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHESAPEAKE APPALACHIA LLC|CHESAPEAKE APPALACHIA LLC]]
+
| County: [[Susquehanna_County,_Pennsylvania|Susquehanna]]
 +
|-
 +
| Municipality: [[Auburn Township,_Susquehanna_County,_Pennsylvania|Auburn Township]]
 +
|-
 +
| Operator Name: [[CHESAPEAKE APPALACHIA LLC]]
 
|-
 
|-
 
| Well Pad ID: [[148953]]
 
| Well Pad ID: [[148953]]
Line 15: Line 19:
 
| Farm/Lease Name: NICKOLYN 5H
 
| Farm/Lease Name: NICKOLYN 5H
 
|-
 
|-
| First Permit Date: 2010-03-19
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-03-19
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2010-06-05
+
| Permit Date: 2010-03-19
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.666794
 
| Latitude: 41.666794
 
|-
 
|-
| Longitude: -76.094813
+
| Longitude: -76.094814
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-03-19
 +
| New Permit Application
 +
|-
 +
| 2010-06-05
 +
| Performed Spud Operation
 +
|-
 +
| 2010-11-02
 +
| Drilling Completion
 +
|-
 +
| 2011-01-19
 +
| Perforation
 +
|-
 +
| 2011-01-19
 +
| Performed Stimulation 
 +
|-
 +
| 2012-04-30
 +
| DEVIATED
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Job Number
!scope="col" | DATE
+
!scope="col" | Job Start Date
!scope="col" | DESCRIPTION
+
!scope="col" | Job End Date
!scope="col" | COMMENT
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | VIOLATION ID
+
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| 1930264
+
|}-->
| 2010-11-27
+
<!--==== Fluid Composition Data ====
| No Violations Noted
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Job Number
|  
+
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
| 1930389
+
| 2011-01-19
| 2010-10-27
+
| style="text-align: right;" |  
| No Violations Noted
 
| 20' 0-80' 200 sacks
 
13 3/8 0-622' 541 sacks . 40 bbls returned
 
9 5/8 0-2477' 880 sacks.  35 bbls returned.
 
  
Currently at 6870'  Company man Josh Bradford 713-758-0600 Nomac 41.  Est TD  11672" From surface to 622 - no show h2o ora gas.  216 units @1475' 32 units @ 1820.  Closed loop system.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
|-
+
| style="text-align: right;" | 0
|-
 
| 2047581
 
| 2012-03-05
 
| No Violations Noted
 
|
 
|  
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-2
+
| 2010
| style="text-align:right;" | 1524309.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 219,043.00
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2012
| style="text-align:right;" | 1416337.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 2,940,646.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 363
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 2,642,867.00
 +
| style="text-align: right;" | 286
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2014
| style="text-align:right;" | 219043.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 30.0
+
| style="text-align: right;" | 2,166,444.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 362
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 990,454.00
 +
| style="text-align: right;" | 346
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2016
| style="text-align:right;" | 0.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 991,132.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 363
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| style="text-align: right;" | 1,122,862.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2018
| style="text-align:right;" | 0.0
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 315,858.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 132
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2019
| 2010-3
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 1,298,963.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 320
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2011-2
+
| 2011
| FRACING FLUID WASTE
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 758.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 758.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE OF BRINE TO FRAC A WELL
+
|-
 +
| 2012
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,759.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,704.44 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 107.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123
 
|-
 
|-
| 2012-1
+
| 2013
| PRODUCED FLUID
+
| [[CHESAPEAKE APPALACHIA LLC]]
| style="text-align:right;" | 2759.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 55.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC007
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 54.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR119
 +
|-
 +
| 2013
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 50.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR119
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 704.12 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 54.40 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NC008
 +
|-
 +
| 2015
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 211.50 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 156.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE FOR HYDRAULIC FRACTURING
+
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 31.34 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 37.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 512.70 Tons
 +
| LANDFILL
 +
| 100933
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 866.51 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC008
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Soil Contaminated by Oil & Gas Related Spills
 +
| style="text-align: right;" | 100.90 Tons
 +
| LANDFILL
 +
| THR029
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 23.76 Tons
 +
| LANDFILL
 +
| 301626
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Synthetic Liner Materials
 +
| style="text-align: right;" | 6.04 Tons
 +
| LANDFILL
 +
| 8-0728-0004/013
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 512.70 Tons
 +
| LANDFILL
 +
| 100933
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Soil Contaminated by Oil
 +
| style="text-align: right;" | 100.90 Tons
 +
| LANDFILL
 +
| THR029
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 33.84 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 1,937.58 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC008
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 12.08 Tons
 +
| LANDFILL
 +
| 301626
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Waste Water Treatment Sludge
 +
| style="text-align: right;" | 0.40 Tons
 +
| LANDFILL
 +
| 301358
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 660.14 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC008
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 52.34 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC010
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 17.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE003
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.90 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CHESAPEAKE APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 94.05 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NC018
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1930264
 +
| Primary Facility
 +
| 2010-11-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 1930389
 +
| Primary Facility
 +
| 2010-10-27
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| 20' 0-80' 200 sacks
 +
|-
 +
| 2047581
 +
| Primary Facility
 +
| 2012-03-05
 +
| Complaint Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2394266
 +
| Primary Facility
 +
| 2015-07-30
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2717608
 +
| Primary Facility
 +
| 2018-04-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| I inspected the Nikolyn well pad on 4/12/2018.  I performed a RTNC inspection.  The wells associated with this site are as follows:  115-20296, 115-20297, 115-21015, 115-22439, 115-22440, 115-22441, 115-22461.  The cut and fill slopes were well vegetated. The cut slope had a repair protected with a mulch blanket.  There have been previous repairs to the cut slope repaired with #4 stone.  The access road and pad surface were stable and solid.  The wells were properly labeled.  There were no erosional issues noted.
 +
 +
There were no violations observed.
 +
|-
 +
| 2741638
 +
| Primary Facility
 +
| 2018-06-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Arrived on location at 11:00. United Drilling had (2) spudder rigs onsite setting 20" conductors for three new wells to be drilled on pad, the Nickolyn 1H, 3H & 6HC. An existing, previously plugged 20" conductor has had steel cap and gravel removed in preparation to re-enter this well slot under a New well permit, the Nickolyn 7HC (115-22460).
 +
- United Drilling has completed drilling (1) new conductor to a TD of 100' and plans to be drilling, setting and cementing all (3) new 20" conductors to ~100'. All new conductor slots were drilled on air.
 +
- There are (2) existing wells on this pad which were previously in production, the Nickolyn 2H & 5H. Both these wells have been temporarily shut-in and disconnected from all Production equipment in preparation for drilling new wells on pad. Both these wells had protective cages installed over production trees. Both wells had (3) 2" annular vents present. The (5/P) vents were shut-in to gauges reading: 2H: 20 psi.; 5H: 80 psi. The (13x9) & (9x5) vents were open and ve
 +
|-
 +
| 2773716
 +
| Primary Facility
 +
| 2018-08-23
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| I arrived at the site at 13:15. Patterson Drilling Rig # 580 is on the location.  The weather conditions are partly sunny skies and breezy with temperatures around 70 degrees Fahrenheit.  I met with Danny Lambert, site company man, consultant of CHK and David Newman, Drilling Superintendent of CHK.  Mr. Lambert and Mr. Newman provided me with the following information regarding site activities.  "The current drilling depth on the Nickolyn 3H well is (651.97) feet.  We just finished cementing the surface casing at (652) feet last night.  We have waited on cement to cure for (8) hours and picked up the bottom hole assembly.  We used a Halliburton Class H cement. A total of (29) barrels of cement returned to surface.  The surface string was drilled with municipal water.  The  intermediate string will be drilled to (2,600) feet.  We will drill with air/mist to (6,791) feet, which is at the top of the curve.  We will load the hole with about (400-500) barrels of oil based mud.  The well will be drilled to total d
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 20:16, 15 May 2020

Well Details

Well ID: 37-115-20296
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148953
Farm/Lease Name: NICKOLYN 5H
License Status:
Spud Date:
Permit Date: 2010-03-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.666794
Longitude: -76.094814

For data sources see[1][2][3]

Well History

Date Event
2010-03-19 New Permit Application
2010-06-05 Performed Spud Operation
2010-11-02 Drilling Completion
2011-01-19 Perforation
2011-01-19 Performed Stimulation
2012-04-30 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-01-19 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 219,043.00 30 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 2,940,646.00 363 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 2,642,867.00 286 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 2,166,444.00 362 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 990,454.00 346 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 991,132.00 363 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,122,862.00 363 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 315,858.00 132 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 1,298,963.00 320 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 758.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 2,759.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 3,704.44 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 107.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC007
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 54.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 704.12 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 54.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 211.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 156.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 31.34 Tons LANDFILL 301358
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 37.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 512.70 Tons LANDFILL 100933
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 866.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 100.90 Tons LANDFILL THR029
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 23.76 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.04 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil 512.70 Tons LANDFILL 100933
2018 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil 100.90 Tons LANDFILL THR029
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 33.84 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 1,937.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 12.08 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.40 Tons LANDFILL 301358
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 660.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 52.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 17.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 90.90 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 94.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1930264 Primary Facility 2010-11-27 Routine/Complete Inspection No Violations Noted
1930389 Primary Facility 2010-10-27 Drilling/Alteration No Violations Noted 20' 0-80' 200 sacks
2047581 Primary Facility 2012-03-05 Complaint Inspection No Violations Noted
2394266 Primary Facility 2015-07-30 Routine/Complete Inspection No Violations Noted
2717608 Primary Facility 2018-04-12 Routine/Complete Inspection No Violations Noted I inspected the Nikolyn well pad on 4/12/2018. I performed a RTNC inspection. The wells associated with this site are as follows: 115-20296, 115-20297, 115-21015, 115-22439, 115-22440, 115-22441, 115-22461. The cut and fill slopes were well vegetated. The cut slope had a repair protected with a mulch blanket. There have been previous repairs to the cut slope repaired with #4 stone. The access road and pad surface were stable and solid. The wells were properly labeled. There were no erosional issues noted.

There were no violations observed.

2741638 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted Arrived on location at 11:00. United Drilling had (2) spudder rigs onsite setting 20" conductors for three new wells to be drilled on pad, the Nickolyn 1H, 3H & 6HC. An existing, previously plugged 20" conductor has had steel cap and gravel removed in preparation to re-enter this well slot under a New well permit, the Nickolyn 7HC (115-22460).

- United Drilling has completed drilling (1) new conductor to a TD of 100' and plans to be drilling, setting and cementing all (3) new 20" conductors to ~100'. All new conductor slots were drilled on air. - There are (2) existing wells on this pad which were previously in production, the Nickolyn 2H & 5H. Both these wells have been temporarily shut-in and disconnected from all Production equipment in preparation for drilling new wells on pad. Both these wells had protective cages installed over production trees. Both wells had (3) 2" annular vents present. The (5/P) vents were shut-in to gauges reading: 2H: 20 psi.; 5H: 80 psi. The (13x9) & (9x5) vents were open and ve

2773716 Primary Facility 2018-08-23 Drilling/Alteration No Violations Noted I arrived at the site at 13:15. Patterson Drilling Rig # 580 is on the location. The weather conditions are partly sunny skies and breezy with temperatures around 70 degrees Fahrenheit. I met with Danny Lambert, site company man, consultant of CHK and David Newman, Drilling Superintendent of CHK. Mr. Lambert and Mr. Newman provided me with the following information regarding site activities. "The current drilling depth on the Nickolyn 3H well is (651.97) feet. We just finished cementing the surface casing at (652) feet last night. We have waited on cement to cure for (8) hours and picked up the bottom hole assembly. We used a Halliburton Class H cement. A total of (29) barrels of cement returned to surface. The surface string was drilled with municipal water. The intermediate string will be drilled to (2,600) feet. We will drill with air/mist to (6,791) feet, which is at the top of the curve. We will load the hole with about (400-500) barrels of oil based mud. The well will be drilled to total d

For data sources see[8]

References