X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22229"

m
 
(16 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 003-22229
+
| Well ID: 37-003-22229
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.243461, -79.904616 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.243461, -79.904617 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Allegheny County, Pennsylvania|Allegheny]]
+
| County: [[Allegheny_County,_Pennsylvania|Allegheny]]
 
|-
 
|-
| Municipality: [[Forward Township, Allegheny County, Pennsylvania|Forward Township]]
+
| Municipality: [[Forward Township,_Allegheny_County,_Pennsylvania|Forward Township]]
 
|-
 
|-
| Operator Name: [[EQT PRODUCTION CO]]
+
| Operator Name: [[EQT PROD CO]]
 
|-
 
|-
| Farm/Lease Name: OLIVER EAST 590597
+
| Well Pad ID: [[148982]]
 
|-
 
|-
| First Permit Date: 2012-08-15
+
| Farm/Lease Name: OLIVER EAST
 
|-
 
|-
| Last Permit Date: 2012-08-15
+
| License Status: Active
 
|-
 
|-
| Spud Date: 2013-01-14
+
| Spud Date: 2013-01-27
 
|-
 
|-
| Unconventional: Yes
+
| Permit Date: 2012-08-15
 
|-
 
|-
| Horizontal: Yes
+
| Well Type: GAS
 
|-
 
|-
| Producing: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: None
+
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.243461
 
| Latitude: 40.243461
 
|-
 
|-
| Longitude: -79.904616
+
| Longitude: -79.904617
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-08-15
 +
| New Permit Application
 +
|-
 +
| 2013-01-14
 +
| Performed Spud Operation
 +
|-
 +
| 2013-03-09
 +
| Drilling Completion
 +
|-
 +
| 2013-07-03
 +
| Perforation
 +
|-
 +
| 2013-07-03
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2013-07-03
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2013-07-04
 +
| Perforation
 +
|-
 +
| 2013-07-04
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2013-07-04
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2013-07-04
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2013-07-04
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2013-07-04
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2013-07-05
 +
| Perforation
 +
|-
 +
| 2013-07-05
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2013-07-05
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2013-07-05
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2013-07-05
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2013-07-07
 +
| Perforation
 +
|-
 +
| 2013-07-07
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2013-07-08
 +
| Perforation
 +
|-
 +
| 2013-07-08
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2013-07-08
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2013-07-08
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2013-07-08
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2013-07-08
 +
| Performed Stage 17 of Stimulation
 +
|-
 +
| 2013-07-09
 +
| Perforation
 +
|-
 +
| 2013-07-09
 +
| Performed Stage 18 of Stimulation
 +
|-
 +
| 2013-07-09
 +
| Performed Stage 19 of Stimulation
 +
|-
 +
| 2013-07-09
 +
| Performed Stage 20 of Stimulation
 +
|-
 +
| 2013-07-09
 +
| Performed Stage 21 of Stimulation
 +
|-
 +
| 2013-07-09
 +
| Performed Stage 22 of Stimulation
 +
|-
 +
| 2013-07-10
 +
| Perforation
 +
|-
 +
| 2013-07-10
 +
| Performed Stage 23 of Stimulation
 +
|-
 +
| 2018-11-05
 +
| Deviated
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2013-07-03
 +
| 2013-07-10
 +
| style="text-align: right;" | 7,702
 +
| style="text-align: right;" | 5,159,390
 +
| style="text-align: right;" | 220,556
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="11"| 1
 +
| rowspan="1"| SP Breaker
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Oxidizing Breaker
 +
| Sodium Persulfate
 +
| 7775-27-1
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00003000
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Carrier
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 89.8988
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| LP-65
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Scale Inhibitor
 +
| Ammonium Chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00259
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| WG-36
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Gelling Agent
 +
| Guar Gum
 +
| 9000-30-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00193
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| BE-9
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Biocide
 +
| Tributyl tetradecyl phosphonium chloride
 +
| 81741-28-8
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.003
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FR-66
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Friction Reducer
 +
| Hydrotreated light petroleum distillate
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.02681
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| BA-40L
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Buffer
 +
| Potassium carbonate
 +
| 584-08-7
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.0001
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 28% HCl
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Dissolves cement & minerals in perforations
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 28
 +
| style="text-align: right;" | 0.04792
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="2"| HAI-OS
 +
| rowspan="2"| Halliburton
 +
| rowspan="2"| Protects casing
 +
| Propargyl Alcohol
 +
| 107-19-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00006000
 +
| style="text-align: right;" | 0
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00036
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 9.90549
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2013-07-03
 +
| style="text-align: right;" | 1
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,424
 +
| style="text-align: right;" | 9,662
 +
|-
 +
| 2013-07-03
 +
| style="text-align: right;" | 2
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,507
 +
| style="text-align: right;" | 8,806
 +
|-
 +
| 2013-07-04
 +
| style="text-align: right;" | 3
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,594
 +
| style="text-align: right;" | 8,586
 +
|-
 +
| 2013-07-04
 +
| style="text-align: right;" | 4
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,343
 +
| style="text-align: right;" | 8,934
 +
|-
 +
| 2013-07-04
 +
| style="text-align: right;" | 5
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,377
 +
| style="text-align: right;" | 8,743
 +
|-
 +
| 2013-07-04
 +
| style="text-align: right;" | 6
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,414
 +
| style="text-align: right;" | 8,716
 +
|-
 +
| 2013-07-04
 +
| style="text-align: right;" | 7
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,326
 +
| style="text-align: right;" | 8,786
 +
|-
 +
| 2013-07-05
 +
| style="text-align: right;" | 8
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,212
 +
| style="text-align: right;" | 8,674
 +
|-
 +
| 2013-07-05
 +
| style="text-align: right;" | 9
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,538
 +
| style="text-align: right;" | 8,869
 +
|-
 +
| 2013-07-05
 +
| style="text-align: right;" | 10
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 7,978
 +
| style="text-align: right;" | 8,841
 +
|-
 +
| 2013-07-05
 +
| style="text-align: right;" | 11
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,246
 +
| style="text-align: right;" | 8,509
 +
|-
 +
| 2013-07-07
 +
| style="text-align: right;" | 12
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 7,912
 +
| style="text-align: right;" | 8,694
 +
|-
 +
| 2013-07-08
 +
| style="text-align: right;" | 13
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 7,777
 +
| style="text-align: right;" | 8,313
 +
|-
 +
| 2013-07-08
 +
| style="text-align: right;" | 14
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,455
 +
| style="text-align: right;" | 8,448
 +
|-
 +
| 2013-07-08
 +
| style="text-align: right;" | 15
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,502
 +
| style="text-align: right;" | 8,837
 +
|-
 +
| 2013-07-08
 +
| style="text-align: right;" | 16
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 7,782
 +
| style="text-align: right;" | 8,718
 +
|-
 +
| 2013-07-08
 +
| style="text-align: right;" | 17
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 7,901
 +
| style="text-align: right;" | 8,063
 +
|-
 +
| 2013-07-09
 +
| style="text-align: right;" | 18
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,133
 +
| style="text-align: right;" | 8,302
 +
|-
 +
| 2013-07-09
 +
| style="text-align: right;" | 19
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,007
 +
| style="text-align: right;" | 8,619
 +
|-
 +
| 2013-07-09
 +
| style="text-align: right;" | 20
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,313
 +
| style="text-align: right;" | 8,488
 +
|-
 +
| 2013-07-09
 +
| style="text-align: right;" | 21
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,132
 +
| style="text-align: right;" | 8,578
 +
|-
 +
| 2013-07-09
 +
| style="text-align: right;" | 22
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 8,068
 +
| style="text-align: right;" | 8,566
 +
|-
 +
| 2013-07-10
 +
| style="text-align: right;" | 23
 +
| Sand
 +
| style="text-align: right;" | 5,460
 +
| style="text-align: right;" | 7,749
 +
| style="text-align: right;" | 9,499
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 477,575.00
 +
| style="text-align: right;" | 62
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 1,217,252.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 515,888.00
 +
| style="text-align: right;" | 349
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 482,898.00
 +
| style="text-align: right;" | 363
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 303,185.00
 +
| style="text-align: right;" | 349
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 280,532.00
 +
| style="text-align: right;" | 356
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[EQT PROD CO]]
 +
| style="text-align: right;" | 285,728.00
 +
| style="text-align: right;" | 360
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10,171.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 1,420.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 430.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-031-27177
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 100.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-22459
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 3,873.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 60.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-083-24137
 +
|-
 +
| 2013
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 410.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24202
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 110.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 130.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23759
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 65.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23732
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,120.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-059-24202
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6,152.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 193.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-031-27177
 +
|-
 +
| 2014
 +
| [[EQT PROD CO]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 9.07 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2015
 +
| [[EQT PROD CO]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 110.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2015
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,646.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 130.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,271.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 65.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 250.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[EQT PROD CO]]
 +
 
 +
| style="text-align: right;" | 130.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[EQT PROD CO]]
 +
 
 +
| style="text-align: right;" | 65.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[EQT PROD CO]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 94.18 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 113.55 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[EQT PROD CO]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 119.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40.56 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 154.81 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 21.21 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| ORDER 2016-415
 +
|-
 +
| 2019
 +
| [[EQT PROD CO]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 69.08 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[EQT PROD CO]]
 +
| Other Oil & Gas Wastes
 +
| style="text-align: right;" | 128.67 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 6.35 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[EQT PROD CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 434.30 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2130243
 
| 2130243
 +
| Primary Facility
 
| 2013-01-14
 
| 2013-01-14
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-op inspection.  The site sign was in place and showed the proper permitting information.  The E&S controls and BMP's were in place and constructed according to plan.  The pad was still under construction with ~ 75 % complete.  The access road berms, soil stock pile and ~50% of the hillsides had been stabilized.  There were no signs of excess erosion or sedimentation.
 
| John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-op inspection.  The site sign was in place and showed the proper permitting information.  The E&S controls and BMP's were in place and constructed according to plan.  The pad was still under construction with ~ 75 % complete.  The access road berms, soil stock pile and ~50% of the hillsides had been stabilized.  There were no signs of excess erosion or sedimentation.
|
 
|-
 
 
|-
 
|-
 
| 2134527
 
| 2134527
 +
| Primary Facility
 
| 2013-01-23
 
| 2013-01-23
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| THE WELL IS SPUDDED AND THE CONDUCTOR IS IN. THE WELL IS COVERD.
 
| THE WELL IS SPUDDED AND THE CONDUCTOR IS IN. THE WELL IS COVERD.
|
 
|-
 
 
|-
 
|-
 
| 2138954
 
| 2138954
 +
| Primary Facility
 
| 2013-02-11
 
| 2013-02-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| John Ley, Water Quality Specialist, SWRO was on site to conduct a routine inspection.  The site sign was in place and showed the proper permitting information.  The E&S controls and BMP's were in place and constructed according to plan.  The pad was completed.  The access road berms, soil stock pile had been stabilized.  There were no signs of excess erosion or sedimentation.  The water impoundment was being constructed.  This area will need to be stabilized once construction is completed.  The well has 20” and 13 3/8’” casing set and cemented.
 
| John Ley, Water Quality Specialist, SWRO was on site to conduct a routine inspection.  The site sign was in place and showed the proper permitting information.  The E&S controls and BMP's were in place and constructed according to plan.  The pad was completed.  The access road berms, soil stock pile had been stabilized.  There were no signs of excess erosion or sedimentation.  The water impoundment was being constructed.  This area will need to be stabilized once construction is completed.  The well has 20” and 13 3/8’” casing set and cemented.
|  
+
|-
 +
| 2143106
 +
| Primary Facility
 +
| 2013-02-21
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| PATTERSON RIG BEGAN BOTTOM HOLE @ 1,099'.
 +
|-
 +
| 2146603
 +
| Primary Facility
 +
| 2013-03-05
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| PATTERSON 227 DRILLING CURVE @ 6,828'.
 +
|-
 +
| 2146608
 +
| Primary Facility
 +
| 2013-02-28
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| RIG CORING AT 7,682'. THE WELL WILL BE CEMENTED BACK TO THE KOP.
 +
|-
 +
| 2148330
 +
| Primary Facility
 +
| 2013-03-13
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| PATTERSON 227 FINISHED DRILLING THIS WELL AT 11,326'. THE PRODUCTION CASING IS CEMENTED. THE RIG HAS MOVED TO 590598.
 +
|-
 +
| 2151176
 +
| Primary Facility
 +
| 2013-03-21
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL DRILLING COMPLETE. TD @ 11,326'. THE PRODUCTION CASING IS IN.
 +
|-
 +
| 2156467
 +
| Primary Facility
 +
| 2013-04-01
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| DRILLING COMPLETE. THE WELL IS NOT FRACED. THE SITE IS OK.
 +
|-
 +
| 2171240
 +
| Primary Facility
 +
| 2013-05-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site Site 763587 (inspection record 2171160). Drilling activity for well #590596 (003-22237) was ongoing during time of inspection. No erosion or sedimentation issues were apparent. BMPs were installed according to plan and appeared adequate. Production fluids were contained and no leaks to the environment were evident.
 +
|-
 +
| 2209243
 +
| Primary Facility
 +
| 2013-08-15
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site Site 763587 (inspection record 2209242).  No E&S issues were evident. BMPs were installed according to plan and appeared adequate. No leaks to the environment were noted.
 +
|-
 +
| 2211306
 +
| Primary Facility
 +
| 2013-10-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2211285).  Well tag needs updated. No E&S issues noted.
 +
|-
 +
| 2220446
 +
| Primary Facility
 +
| 2013-10-30
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| WELL IS NOT HOOKED UP. PRODUCTION EQUIPTMENT INSTALLED. A PIPELINE BEING RUN. PROTECTIVE COVERING ON PARTS OF THE PAD.
 +
|-
 +
| 2228782
 +
| Primary Facility
 +
| 2013-10-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2228779).  Well tag was correct. No E&S issues noted.
 +
|-
 +
| 2229113
 +
| Primary Facility
 +
| 2013-11-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2229112).  No E&S issues noted.
 +
|-
 +
| 2231279
 +
| Primary Facility
 +
| 2013-12-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2231278).  Site was lightly snow covered at time of inspection. Water impoundment had necessary freeboard. Numerous Baker tanks were lined up along two sides of the pad. Well was properly labeled. No E&S issues noted. No leaks of residual waste or fluids to the environment were evident.
 +
|-
 +
| 2245513
 +
| Primary Facility
 +
| 2014-01-15
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| WELL IS PRODUCING. NEW STONE ON THE PAD. WELL AND PAD IN GOOD CONDITION.
 +
|-
 +
| 2283024
 +
| Primary Facility
 +
| 2014-06-04
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587).  Well was properly labeled and appeared equipped for production. No dust or E&S issues noted. No leaks of residual waste or fluids to the environment were evident.
 +
|-
 +
| 2283069
 +
| Primary Facility
 +
| 2014-06-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587).  Inspection occurred after heavy rainfall. Water impoundment had necessary freeboard. Well was properly labeled. No E&S issues noted. No leaks of residual waste or fluids to the environment were evident.
 +
|-
 +
| 2287638
 +
| Primary Facility
 +
| 2014-07-09
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| THIS WELL IS COMPLETE AND HOOKED UP.
 +
|-
 +
| 2310640
 +
| Primary Facility
 +
| 2014-07-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site ID sign is correct. Drill rig was on site at time of inspection. Impoundment had necessary freeboard. No E&S or dust issues noted. No leaks of fluids noted.
 +
|-
 +
| 2310670
 +
| Primary Facility
 +
| 2014-08-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site ID sign was correct. Drill rig was on site at time of inspection. Dust suppression measures had been applied to access road. No E&S or dust issues noted. No apparent leaks of fluids.
 +
|-
 +
| 2310697
 +
| Primary Facility
 +
| 2014-09-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site ID sign was correct. Vegetative growth was good; site was well stabilized. No E&S or dust issues noted. No apparent leaks of production fluids. Well labels need updated.
 +
|-
 +
| 2377453
 +
| Primary Facility
 +
| 2015-06-02
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| On June 2, 2015, I inspected the Oliver East Pad as a routine partial inspection and made the following observations:
 +
|-
 +
| 2433580
 +
| Primary Facility
 +
| 2015-11-03
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 11/3/15, I performed a routine complete site inspection of the Oliver East site and made the following observations:
 +
|-
 +
| 2449900
 +
| Primary Facility
 +
| 2016-01-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| THIS HORIZONTAL WELL IS PROTECTED WITH CONCRETE BARRIERS AND IS HOOKED UP FOR PRODUCTION.
 +
THE SITE IS IN GOOD CONDITION.
 +
|-
 +
| 2480550
 +
| Primary Facility
 +
| 2016-04-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| GAS WELL AND IT'S PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.
 +
THE SITE IS IN GOOD CONDITION.
 +
|-
 +
| 2659355
 +
| Primary Facility
 +
| 2017-11-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition.
 +
|-
 +
| 2753146
 +
| Primary Facility
 +
| 2018-07-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is in good condition. The pad is also clean and in good shape.
 +
|-
 +
| 2797517
 +
| Primary Facility
 +
| 2018-11-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks and gas production units appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
|}
+
|-
== Waste Data ==
+
|}-->
 +
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
+
|-
|}
+
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 13:46, 20 May 2020

Well Details

Well ID: 37-003-22229
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Forward Township
Operator Name: EQT PROD CO
Well Pad ID: 148982
Farm/Lease Name: OLIVER EAST
License Status: Active
Spud Date: 2013-01-27
Permit Date: 2012-08-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.243461
Longitude: -79.904617

For data sources see[1][2][3]

Well History

Date Event
2012-08-15 New Permit Application
2013-01-14 Performed Spud Operation
2013-03-09 Drilling Completion
2013-07-03 Perforation
2013-07-03 Performed Stage 1 of Stimulation
2013-07-03 Performed Stage 2 of Stimulation
2013-07-04 Perforation
2013-07-04 Performed Stage 3 of Stimulation
2013-07-04 Performed Stage 4 of Stimulation
2013-07-04 Performed Stage 5 of Stimulation
2013-07-04 Performed Stage 6 of Stimulation
2013-07-04 Performed Stage 7 of Stimulation
2013-07-05 Perforation
2013-07-05 Performed Stage 10 of Stimulation
2013-07-05 Performed Stage 11 of Stimulation
2013-07-05 Performed Stage 8 of Stimulation
2013-07-05 Performed Stage 9 of Stimulation
2013-07-07 Perforation
2013-07-07 Performed Stage 12 of Stimulation
2013-07-08 Perforation
2013-07-08 Performed Stage 13 of Stimulation
2013-07-08 Performed Stage 14 of Stimulation
2013-07-08 Performed Stage 15 of Stimulation
2013-07-08 Performed Stage 16 of Stimulation
2013-07-08 Performed Stage 17 of Stimulation
2013-07-09 Perforation
2013-07-09 Performed Stage 18 of Stimulation
2013-07-09 Performed Stage 19 of Stimulation
2013-07-09 Performed Stage 20 of Stimulation
2013-07-09 Performed Stage 21 of Stimulation
2013-07-09 Performed Stage 22 of Stimulation
2013-07-10 Perforation
2013-07-10 Performed Stage 23 of Stimulation
2018-11-05 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-03 2013-07-10 7,702 5,159,390 220,556

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SP Breaker Halliburton Oxidizing Breaker Sodium Persulfate 7775-27-1 100 0.00003000 0
Water Halliburton Carrier Water 7732-18-5 100 89.8988 0
LP-65 Halliburton Scale Inhibitor Ammonium Chloride 12125-02-9 10 0.00259 0
WG-36 Halliburton Gelling Agent Guar Gum 9000-30-0 100 0.00193 0
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.003 0
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.02681 0
BA-40L Halliburton Buffer Potassium carbonate 584-08-7 60 0.0001 0
28% HCl Halliburton Dissolves cement & minerals in perforations Hydrochloric Acid 7647-01-0 28 0.04792 0
HAI-OS Halliburton Protects casing Propargyl Alcohol 107-19-7 10 0.00006000 0
Methanol 67-56-1 60 0.00036 0
Sand Halliburton Proppant Crystalline Silica 14808-60-7 100 9.90549 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-07-03 1 Sand 5,460 8,424 9,662
2013-07-03 2 Sand 5,460 8,507 8,806
2013-07-04 3 Sand 5,460 8,594 8,586
2013-07-04 4 Sand 5,460 8,343 8,934
2013-07-04 5 Sand 5,460 8,377 8,743
2013-07-04 6 Sand 5,460 8,414 8,716
2013-07-04 7 Sand 5,460 8,326 8,786
2013-07-05 8 Sand 5,460 8,212 8,674
2013-07-05 9 Sand 5,460 8,538 8,869
2013-07-05 10 Sand 5,460 7,978 8,841
2013-07-05 11 Sand 5,460 8,246 8,509
2013-07-07 12 Sand 5,460 7,912 8,694
2013-07-08 13 Sand 5,460 7,777 8,313
2013-07-08 14 Sand 5,460 8,455 8,448
2013-07-08 15 Sand 5,460 8,502 8,837
2013-07-08 16 Sand 5,460 7,782 8,718
2013-07-08 17 Sand 5,460 7,901 8,063
2013-07-09 18 Sand 5,460 8,133 8,302
2013-07-09 19 Sand 5,460 8,007 8,619
2013-07-09 20 Sand 5,460 8,313 8,488
2013-07-09 21 Sand 5,460 8,132 8,578
2013-07-09 22 Sand 5,460 8,068 8,566
2013-07-10 23 Sand 5,460 7,749 9,499

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 EQT PROD CO 477,575.00 62 0.00 0 0.00 0
2014 EQT PROD CO 1,217,252.00 365 0.00 0 0.00 0
2015 EQT PROD CO 515,888.00 349 0.00 0 0.00 0
2016 EQT PROD CO 482,898.00 363 0.00 0 0.00 0
2017 EQT PROD CO 303,185.00 349 0.00 0 0.00 0
2018 EQT PROD CO 280,532.00 356 0.00 0 0.00 0
2019 EQT PROD CO 285,728.00 360 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 EQT PROD CO Produced Fluid 10,171.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Drilling Fluid Waste 1,420.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 430.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2013 EQT PROD CO Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-121-22459
2013 EQT PROD CO Fracing Fluid Waste 3,873.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 60.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2013 EQT PROD CO Produced Fluid 410.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 EQT PROD CO Produced Fluid 130.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 EQT PROD CO Produced Fluid 65.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 EQT PROD CO Produced Fluid 1,120.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014 EQT PROD CO Produced Fluid 6,152.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 193.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2014 EQT PROD CO Fracturing Fluid Waste 9.07 Tons LANDFILL 100419
2015 EQT PROD CO Fracing Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 EQT PROD CO Produced Fluid 1,646.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 130.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 1,271.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Produced Fluid 250.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO 130.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Other Oil & Gas Wastes 94.18 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid 113.55 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes 119.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 40.56 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid 154.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 21.21 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2019 EQT PROD CO Other Oil & Gas Wastes 69.08 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 128.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 6.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid 434.30 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2130243 Primary Facility 2013-01-14 Routine/Complete Inspection No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-op inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was still under construction with ~ 75 % complete. The access road berms, soil stock pile and ~50% of the hillsides had been stabilized. There were no signs of excess erosion or sedimentation.
2134527 Primary Facility 2013-01-23 Drilling/Alteration No Violations Noted THE WELL IS SPUDDED AND THE CONDUCTOR IS IN. THE WELL IS COVERD.
2138954 Primary Facility 2013-02-11 Routine/Complete Inspection No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct a routine inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was completed. The access road berms, soil stock pile had been stabilized. There were no signs of excess erosion or sedimentation. The water impoundment was being constructed. This area will need to be stabilized once construction is completed. The well has 20” and 13 3/8’” casing set and cemented.
2143106 Primary Facility 2013-02-21 Drilling/Alteration No Violations Noted PATTERSON RIG BEGAN BOTTOM HOLE @ 1,099'.
2146603 Primary Facility 2013-03-05 Drilling/Alteration No Violations Noted PATTERSON 227 DRILLING CURVE @ 6,828'.
2146608 Primary Facility 2013-02-28 Drilling/Alteration No Violations Noted RIG CORING AT 7,682'. THE WELL WILL BE CEMENTED BACK TO THE KOP.
2148330 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted PATTERSON 227 FINISHED DRILLING THIS WELL AT 11,326'. THE PRODUCTION CASING IS CEMENTED. THE RIG HAS MOVED TO 590598.
2151176 Primary Facility 2013-03-21 Drilling/Alteration No Violations Noted WELL DRILLING COMPLETE. TD @ 11,326'. THE PRODUCTION CASING IS IN.
2156467 Primary Facility 2013-04-01 Drilling/Alteration No Violations Noted DRILLING COMPLETE. THE WELL IS NOT FRACED. THE SITE IS OK.
2171240 Primary Facility 2013-05-03 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site Site 763587 (inspection record 2171160). Drilling activity for well #590596 (003-22237) was ongoing during time of inspection. No erosion or sedimentation issues were apparent. BMPs were installed according to plan and appeared adequate. Production fluids were contained and no leaks to the environment were evident.
2209243 Primary Facility 2013-08-15 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site Site 763587 (inspection record 2209242). No E&S issues were evident. BMPs were installed according to plan and appeared adequate. No leaks to the environment were noted.
2211306 Primary Facility 2013-10-02 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2211285). Well tag needs updated. No E&S issues noted.
2220446 Primary Facility 2013-10-30 Drilling/Alteration No Violations Noted WELL IS NOT HOOKED UP. PRODUCTION EQUIPTMENT INSTALLED. A PIPELINE BEING RUN. PROTECTIVE COVERING ON PARTS OF THE PAD.
2228782 Primary Facility 2013-10-08 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2228779). Well tag was correct. No E&S issues noted.
2229113 Primary Facility 2013-11-01 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2229112). No E&S issues noted.
2231279 Primary Facility 2013-12-11 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2231278). Site was lightly snow covered at time of inspection. Water impoundment had necessary freeboard. Numerous Baker tanks were lined up along two sides of the pad. Well was properly labeled. No E&S issues noted. No leaks of residual waste or fluids to the environment were evident.
2245513 Primary Facility 2014-01-15 Routine/Complete Inspection No Violations Noted WELL IS PRODUCING. NEW STONE ON THE PAD. WELL AND PAD IN GOOD CONDITION.
2283024 Primary Facility 2014-06-04 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587). Well was properly labeled and appeared equipped for production. No dust or E&S issues noted. No leaks of residual waste or fluids to the environment were evident.
2283069 Primary Facility 2014-06-25 Routine/Complete Inspection No Violations Noted This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587). Inspection occurred after heavy rainfall. Water impoundment had necessary freeboard. Well was properly labeled. No E&S issues noted. No leaks of residual waste or fluids to the environment were evident.
2287638 Primary Facility 2014-07-09 Routine/Complete Inspection No Violations Noted THIS WELL IS COMPLETE AND HOOKED UP.
2310640 Primary Facility 2014-07-23 Routine/Complete Inspection No Violations Noted Site ID sign is correct. Drill rig was on site at time of inspection. Impoundment had necessary freeboard. No E&S or dust issues noted. No leaks of fluids noted.
2310670 Primary Facility 2014-08-08 Routine/Complete Inspection No Violations Noted Site ID sign was correct. Drill rig was on site at time of inspection. Dust suppression measures had been applied to access road. No E&S or dust issues noted. No apparent leaks of fluids.
2310697 Primary Facility 2014-09-18 Routine/Complete Inspection No Violations Noted Site ID sign was correct. Vegetative growth was good; site was well stabilized. No E&S or dust issues noted. No apparent leaks of production fluids. Well labels need updated.
2377453 Primary Facility 2015-06-02 Routine/Partial Inspection No Violations Noted On June 2, 2015, I inspected the Oliver East Pad as a routine partial inspection and made the following observations:
2433580 Primary Facility 2015-11-03 Routine/Complete Inspection No Violations Noted On 11/3/15, I performed a routine complete site inspection of the Oliver East site and made the following observations:
2449900 Primary Facility 2016-01-29 Routine/Complete Inspection No Violations Noted THIS HORIZONTAL WELL IS PROTECTED WITH CONCRETE BARRIERS AND IS HOOKED UP FOR PRODUCTION.

THE SITE IS IN GOOD CONDITION.

2480550 Primary Facility 2016-04-18 Routine/Complete Inspection No Violations Noted GAS WELL AND IT'S PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.

THE SITE IS IN GOOD CONDITION.

2659355 Primary Facility 2017-11-07 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition.
2753146 Primary Facility 2018-07-18 Routine/Complete Inspection No Violations Noted This well is in good condition. The pad is also clean and in good shape.
2797517 Primary Facility 2018-11-02 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks and gas production units appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road.

For data sources see[9]

References