If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22229 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.243461,"lon":-79.904617,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Forward Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 148982 | |
Farm/Lease Name: OLIVER EAST | |
License Status: Active | |
Spud Date: 2013-01-27 | |
Permit Date: 2012-08-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.243461 | |
Longitude: -79.904617 |
Date | Event |
---|---|
2012-08-15 | New Permit Application |
2013-01-14 | Performed Spud Operation |
2013-03-09 | Drilling Completion |
2013-07-03 | Perforation |
2013-07-03 | Performed Stage 1 of Stimulation |
2013-07-03 | Performed Stage 2 of Stimulation |
2013-07-04 | Perforation |
2013-07-04 | Performed Stage 3 of Stimulation |
2013-07-04 | Performed Stage 4 of Stimulation |
2013-07-04 | Performed Stage 5 of Stimulation |
2013-07-04 | Performed Stage 6 of Stimulation |
2013-07-04 | Performed Stage 7 of Stimulation |
2013-07-05 | Perforation |
2013-07-05 | Performed Stage 10 of Stimulation |
2013-07-05 | Performed Stage 11 of Stimulation |
2013-07-05 | Performed Stage 8 of Stimulation |
2013-07-05 | Performed Stage 9 of Stimulation |
2013-07-07 | Perforation |
2013-07-07 | Performed Stage 12 of Stimulation |
2013-07-08 | Perforation |
2013-07-08 | Performed Stage 13 of Stimulation |
2013-07-08 | Performed Stage 14 of Stimulation |
2013-07-08 | Performed Stage 15 of Stimulation |
2013-07-08 | Performed Stage 16 of Stimulation |
2013-07-08 | Performed Stage 17 of Stimulation |
2013-07-09 | Perforation |
2013-07-09 | Performed Stage 18 of Stimulation |
2013-07-09 | Performed Stage 19 of Stimulation |
2013-07-09 | Performed Stage 20 of Stimulation |
2013-07-09 | Performed Stage 21 of Stimulation |
2013-07-09 | Performed Stage 22 of Stimulation |
2013-07-10 | Perforation |
2013-07-10 | Performed Stage 23 of Stimulation |
2018-11-05 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-03 | 2013-07-10 | 7,702 | 5,159,390 | 220,556 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SP Breaker | Halliburton | Oxidizing Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00003000 | 0 |
Water | Halliburton | Carrier | Water | 7732-18-5 | 100 | 89.8988 | 0 | |
LP-65 | Halliburton | Scale Inhibitor | Ammonium Chloride | 12125-02-9 | 10 | 0.00259 | 0 | |
WG-36 | Halliburton | Gelling Agent | Guar Gum | 9000-30-0 | 100 | 0.00193 | 0 | |
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.003 | 0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.02681 | 0 | |
BA-40L | Halliburton | Buffer | Potassium carbonate | 584-08-7 | 60 | 0.0001 | 0 | |
28% HCl | Halliburton | Dissolves cement & minerals in perforations | Hydrochloric Acid | 7647-01-0 | 28 | 0.04792 | 0 | |
HAI-OS | Halliburton | Protects casing | Propargyl Alcohol | 107-19-7 | 10 | 0.00006000 | 0 | |
Methanol | 67-56-1 | 60 | 0.00036 | 0 | ||||
Sand | Halliburton | Proppant | Crystalline Silica | 14808-60-7 | 100 | 9.90549 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-07-03 | 1 | Sand | 5,460 | 8,424 | 9,662 |
2013-07-03 | 2 | Sand | 5,460 | 8,507 | 8,806 |
2013-07-04 | 3 | Sand | 5,460 | 8,594 | 8,586 |
2013-07-04 | 4 | Sand | 5,460 | 8,343 | 8,934 |
2013-07-04 | 5 | Sand | 5,460 | 8,377 | 8,743 |
2013-07-04 | 6 | Sand | 5,460 | 8,414 | 8,716 |
2013-07-04 | 7 | Sand | 5,460 | 8,326 | 8,786 |
2013-07-05 | 8 | Sand | 5,460 | 8,212 | 8,674 |
2013-07-05 | 9 | Sand | 5,460 | 8,538 | 8,869 |
2013-07-05 | 10 | Sand | 5,460 | 7,978 | 8,841 |
2013-07-05 | 11 | Sand | 5,460 | 8,246 | 8,509 |
2013-07-07 | 12 | Sand | 5,460 | 7,912 | 8,694 |
2013-07-08 | 13 | Sand | 5,460 | 7,777 | 8,313 |
2013-07-08 | 14 | Sand | 5,460 | 8,455 | 8,448 |
2013-07-08 | 15 | Sand | 5,460 | 8,502 | 8,837 |
2013-07-08 | 16 | Sand | 5,460 | 7,782 | 8,718 |
2013-07-08 | 17 | Sand | 5,460 | 7,901 | 8,063 |
2013-07-09 | 18 | Sand | 5,460 | 8,133 | 8,302 |
2013-07-09 | 19 | Sand | 5,460 | 8,007 | 8,619 |
2013-07-09 | 20 | Sand | 5,460 | 8,313 | 8,488 |
2013-07-09 | 21 | Sand | 5,460 | 8,132 | 8,578 |
2013-07-09 | 22 | Sand | 5,460 | 8,068 | 8,566 |
2013-07-10 | 23 | Sand | 5,460 | 7,749 | 9,499 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | EQT PROD CO | 477,575.00 | 62 | 0.00 | 0 | 0.00 | 0 |
2014 | EQT PROD CO | 1,217,252.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 515,888.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 482,898.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 303,185.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 280,532.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 285,728.00 | 360 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | EQT PROD CO | Produced Fluid | 10,171.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Drilling Fluid Waste | 1,420.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Produced Fluid | 430.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2013 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-121-22459 |
2013 | EQT PROD CO | Fracing Fluid Waste | 3,873.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-083-24137 |
2013 | EQT PROD CO | Produced Fluid | 410.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | EQT PROD CO | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | EQT PROD CO | Produced Fluid | 130.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | EQT PROD CO | Produced Fluid | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | EQT PROD CO | Produced Fluid | 1,120.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2014 | EQT PROD CO | Produced Fluid | 6,152.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Produced Fluid | 193.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2014 | EQT PROD CO | Fracturing Fluid Waste | 9.07 Tons | LANDFILL | 100419 |
2015 | EQT PROD CO | Fracing Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | EQT PROD CO | Produced Fluid | 1,646.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 1,271.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | Produced Fluid | 65.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Produced Fluid | 250.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | 130.00 Bbl | REUSE (AT WELL PAD) | ||
2017 | EQT PROD CO | 65.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 94.18 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 113.55 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 119.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 40.56 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | EQT PROD CO | Produced Fluid | 154.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 21.21 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ORDER 2016-415 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 69.08 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 128.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 6.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 434.30 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2130243 | Primary Facility | 2013-01-14 | Routine/Complete Inspection | No Violations Noted | John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-op inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was still under construction with ~ 75 % complete. The access road berms, soil stock pile and ~50% of the hillsides had been stabilized. There were no signs of excess erosion or sedimentation. |
2134527 | Primary Facility | 2013-01-23 | Drilling/Alteration | No Violations Noted | THE WELL IS SPUDDED AND THE CONDUCTOR IS IN. THE WELL IS COVERD. |
2138954 | Primary Facility | 2013-02-11 | Routine/Complete Inspection | No Violations Noted | John Ley, Water Quality Specialist, SWRO was on site to conduct a routine inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The pad was completed. The access road berms, soil stock pile had been stabilized. There were no signs of excess erosion or sedimentation. The water impoundment was being constructed. This area will need to be stabilized once construction is completed. The well has 20” and 13 3/8’” casing set and cemented. |
2143106 | Primary Facility | 2013-02-21 | Drilling/Alteration | No Violations Noted | PATTERSON RIG BEGAN BOTTOM HOLE @ 1,099'. |
2146603 | Primary Facility | 2013-03-05 | Drilling/Alteration | No Violations Noted | PATTERSON 227 DRILLING CURVE @ 6,828'. |
2146608 | Primary Facility | 2013-02-28 | Drilling/Alteration | No Violations Noted | RIG CORING AT 7,682'. THE WELL WILL BE CEMENTED BACK TO THE KOP. |
2148330 | Primary Facility | 2013-03-13 | Drilling/Alteration | No Violations Noted | PATTERSON 227 FINISHED DRILLING THIS WELL AT 11,326'. THE PRODUCTION CASING IS CEMENTED. THE RIG HAS MOVED TO 590598. |
2151176 | Primary Facility | 2013-03-21 | Drilling/Alteration | No Violations Noted | WELL DRILLING COMPLETE. TD @ 11,326'. THE PRODUCTION CASING IS IN. |
2156467 | Primary Facility | 2013-04-01 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. THE WELL IS NOT FRACED. THE SITE IS OK. |
2171240 | Primary Facility | 2013-05-03 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site Site 763587 (inspection record 2171160). Drilling activity for well #590596 (003-22237) was ongoing during time of inspection. No erosion or sedimentation issues were apparent. BMPs were installed according to plan and appeared adequate. Production fluids were contained and no leaks to the environment were evident. |
2209243 | Primary Facility | 2013-08-15 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site Site 763587 (inspection record 2209242). No E&S issues were evident. BMPs were installed according to plan and appeared adequate. No leaks to the environment were noted. |
2211306 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2211285). Well tag needs updated. No E&S issues noted. |
2220446 | Primary Facility | 2013-10-30 | Drilling/Alteration | No Violations Noted | WELL IS NOT HOOKED UP. PRODUCTION EQUIPTMENT INSTALLED. A PIPELINE BEING RUN. PROTECTIVE COVERING ON PARTS OF THE PAD. |
2228782 | Primary Facility | 2013-10-08 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2228779). Well tag was correct. No E&S issues noted. |
2229113 | Primary Facility | 2013-11-01 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2229112). No E&S issues noted. |
2231279 | Primary Facility | 2013-12-11 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587, inspection record 2231278). Site was lightly snow covered at time of inspection. Water impoundment had necessary freeboard. Numerous Baker tanks were lined up along two sides of the pad. Well was properly labeled. No E&S issues noted. No leaks of residual waste or fluids to the environment were evident. |
2245513 | Primary Facility | 2014-01-15 | Routine/Complete Inspection | No Violations Noted | WELL IS PRODUCING. NEW STONE ON THE PAD. WELL AND PAD IN GOOD CONDITION. |
2283024 | Primary Facility | 2014-06-04 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587). Well was properly labeled and appeared equipped for production. No dust or E&S issues noted. No leaks of residual waste or fluids to the environment were evident. |
2283069 | Primary Facility | 2014-06-25 | Routine/Complete Inspection | No Violations Noted | This well was inspected concurrently with ESX12-003-0008 EQT Oliver East Well Site (site number 763587). Inspection occurred after heavy rainfall. Water impoundment had necessary freeboard. Well was properly labeled. No E&S issues noted. No leaks of residual waste or fluids to the environment were evident. |
2287638 | Primary Facility | 2014-07-09 | Routine/Complete Inspection | No Violations Noted | THIS WELL IS COMPLETE AND HOOKED UP. |
2310640 | Primary Facility | 2014-07-23 | Routine/Complete Inspection | No Violations Noted | Site ID sign is correct. Drill rig was on site at time of inspection. Impoundment had necessary freeboard. No E&S or dust issues noted. No leaks of fluids noted. |
2310670 | Primary Facility | 2014-08-08 | Routine/Complete Inspection | No Violations Noted | Site ID sign was correct. Drill rig was on site at time of inspection. Dust suppression measures had been applied to access road. No E&S or dust issues noted. No apparent leaks of fluids. |
2310697 | Primary Facility | 2014-09-18 | Routine/Complete Inspection | No Violations Noted | Site ID sign was correct. Vegetative growth was good; site was well stabilized. No E&S or dust issues noted. No apparent leaks of production fluids. Well labels need updated. |
2377453 | Primary Facility | 2015-06-02 | Routine/Partial Inspection | No Violations Noted | On June 2, 2015, I inspected the Oliver East Pad as a routine partial inspection and made the following observations: |
2433580 | Primary Facility | 2015-11-03 | Routine/Complete Inspection | No Violations Noted | On 11/3/15, I performed a routine complete site inspection of the Oliver East site and made the following observations: |
2449900 | Primary Facility | 2016-01-29 | Routine/Complete Inspection | No Violations Noted | THIS HORIZONTAL WELL IS PROTECTED WITH CONCRETE BARRIERS AND IS HOOKED UP FOR PRODUCTION.
THE SITE IS IN GOOD CONDITION. |
2480550 | Primary Facility | 2016-04-18 | Routine/Complete Inspection | No Violations Noted | GAS WELL AND IT'S PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.
THE SITE IS IN GOOD CONDITION. |
2659355 | Primary Facility | 2017-11-07 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. |
2753146 | Primary Facility | 2018-07-18 | Routine/Complete Inspection | No Violations Noted | This well is in good condition. The pad is also clean and in good shape. |
2797517 | Primary Facility | 2018-11-02 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks and gas production units appear to be in sound condition. No accelerated erosion or sedimentation observed on well site or access road. |
For data sources see[9]