If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 292: | Line 292: | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref>{{cite web |
| title =Production Reports | | title =Production Reports | ||
|publisher = Province of Manitoba: Growth, Enterprise and Trade Branch | |publisher = Province of Manitoba: Growth, Enterprise and Trade Branch | ||
Line 311: | Line 311: | ||
|}--> | |}--> | ||
− | |||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Manitoba Wells]] | [[Category:Manitoba Wells]] |
Well ID: 103.01-10-008-29W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.63503138,"lon":-101.34890748,"icon":""}]} |
Well Name: Sinclair Unit No. 3 HZNTL WIW | |
Country: Canada | |
Province: Manitoba | |
Township: 008 | |
Meridian: W1 | |
Range: 29 | |
Section: 03 | |
Division: Division No. 6 | |
Subdivision: Pipestone | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Water Injection Well | |
Spud Date: 2010-06-15 | |
License Date: 2010-05-11 | |
Well Total Depth: 2402.00 | |
Latitude: 49.63503138 | |
Longitude: -101.34890748 |
For data sources see[1]
Date | Event |
---|---|
2010-05-11 | Location |
2010-06-28 | Drilling Ahead |
2010-06-30 | Waiting On Service Rig |
2010-07-05 | Completing |
2010-07-16 | Water Injection Well |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-06-15 | Ensign - Trinidad Drilling Inc. | 9 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2010-07-07 | HOLLOW STEEL CARRIER | 2324.00 | 2325.00 | 14 | N/A | 2010-08-12 |
2010-07-07 | HOLLOW STEEL CARRIER | 2025.17 | 2026.17 | 14 | N/A | 2010-08-12 |
2010-07-07 | HOLLOW STEEL CARRIER | 1737.52 | 1738.52 | 14 | N/A | 2010-08-12 |
2010-07-07 | HOLLOW STEEL CARRIER | 1438.59 | 1439.59 | 14 | N/A | 2010-08-12 |
2010-07-07 | HOLLOW STEEL CARRIER | 1149.65 | 1150.65 | 14 | N/A | 2010-08-12 |
2013-07-17 | 1365.27 | 1374.71 | 0 | N/A | 2017-03-16 | |
2013-07-17 | 1295.77 | 1305.21 | 0 | N/A | 2017-03-16 | |
2013-07-17 | 1216.37 | 1225.81 | 0 | N/A | 2017-03-16 | |
2013-07-16 | 1805.27 | 1814.71 | 0 | N/A | 2017-03-16 | |
2013-07-16 | 1666.42 | 1675.86 | 0 | N/A | 2017-03-16 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2010-07-09 | FRAC | N/A | 20/40 | SAND | 5.4 | |
2010-07-10 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2010-07-11 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2010-07-13 | FRAC | N/A | 20/40 | SAND | 5.3 | |
2010-07-15 | FRAC | N/A | 20/40 | SAND | 5.3 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | 0.00 | 0 | 0.00 | |
2015 | 0.00 | 0 | 0.00 | |
2016 | 0.00 | 0 | 0.00 | |
2017 | 0.00 | 0 | 0.00 | |
2018 | 0.00 | 0 | 0.00 | |
2019 | 0.00 | 0 | 0.00 | |
2020 | 0.00 | 0 | 0.00 |
For data sources see[6]