If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-121-24493 | | Well ID: 34-121-24493 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.81832762, -81.32916789 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Noble County, Ohio|Noble]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[ANTERO RESOURCES CORPORATION]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-06-06 | | Spud Date: 2014-06-06 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Well Drilled |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.81832762 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.32916789 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 1402302417 | ||
+ | | 2014-06-09 | ||
+ | | | ||
+ | | My inspection today finds Patterson Drilling drilled 380' of 24 hole. The rig ran 376' of 18.625 casing. Allied cemented the casing in place with 726 sks of class A cement. I witnessed 60 barrels of cement return to surface. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -1470229432 | | -1470229432 | ||
| 2014-06-17 | | 2014-06-17 | ||
− | | | + | | |
− | | Patterson rig 343 is drilling 12.25 | + | | Patterson rig 343 is drilling 12.25 hole at a depth of 6250'. The location is well vegetated and erosion controls are in place. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -283994270 | | -283994270 | ||
| 2014-06-07 | | 2014-06-07 | ||
− | | | + | | |
− | | My inspection finds the 30 | + | | My inspection finds the 30 conductor hole was drilled to a depth of 100'. One hundred feet of 26 casing was welded together and ran to bottom. Express Well Services cemented the casing in place with 230 sks of class A cement. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
− | | | + | | 369539035 |
− | | | + | | 2015-04-23 |
− | | | + | | |
− | | My inspection today finds | + | | My inspection today finds U.S. Well Service is providing hydraulic stimulation services. Sixty perforations were placed between 16,263' and 16,410'. All volumes and pressures were recorded in the stimulation report. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 607918819 | | 607918819 | ||
| 2014-06-10 | | 2014-06-10 | ||
− | | | + | | |
− | | I am accompanied by Brandon Trigg. Our inspection today finds the drilling rig, Patterson 343, is drilling 17.5 | + | | I am accompanied by Brandon Trigg. Our inspection today finds the drilling rig, Patterson 343, is drilling 17.5 hole at a depth of 940'. The anticipated total depth for this string is 1860'. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-121-24493 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81832762,"lon":-81.32916789,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-06 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 39.81832762 | |
Longitude: -81.32916789 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1402302417 | 2014-06-09 | My inspection today finds Patterson Drilling drilled 380' of 24 hole. The rig ran 376' of 18.625 casing. Allied cemented the casing in place with 726 sks of class A cement. I witnessed 60 barrels of cement return to surface. | ||||
-1470229432 | 2014-06-17 | Patterson rig 343 is drilling 12.25 hole at a depth of 6250'. The location is well vegetated and erosion controls are in place. | ||||
-283994270 | 2014-06-07 | My inspection finds the 30 conductor hole was drilled to a depth of 100'. One hundred feet of 26 casing was welded together and ran to bottom. Express Well Services cemented the casing in place with 230 sks of class A cement. | ||||
369539035 | 2015-04-23 | My inspection today finds U.S. Well Service is providing hydraulic stimulation services. Sixty perforations were placed between 16,263' and 16,410'. All volumes and pressures were recorded in the stimulation report. | ||||
607918819 | 2014-06-10 | I am accompanied by Brandon Trigg. Our inspection today finds the drilling rig, Patterson 343, is drilling 17.5 hole at a depth of 940'. The anticipated total depth for this string is 1860'. |