If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 104.09-08-001-24W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.02514058,"lon":-100.65839428,"icon":""}]} |
Well Name: Goodlands Unit No. 2 HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 001 | |
Meridian: W1 | |
Range: 24 | |
Section: 08 | |
Division: Division No. 5 | |
Subdivision: Brenda-Waskada | |
Operator Name: Tundra Oil & Gas Limited | |
License Status: Capable Of Oil Production | |
Spud Date: 2009-11-18 | |
License Date: 2009-11-25 | |
Well Total Depth: 1671.00 | |
Latitude: 49.02514058 | |
Longitude: -100.65839428 |
For data sources see[1]
Date | Event |
---|---|
2009-11-25 | Location |
2010-07-25 | Waiting On Service Rig |
2010-08-01 | Completing |
2010-09-03 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2009-11-18 | Precision Drilling | 195 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2010-08-02 | HOLLOW STEEL CARRIER | 1646.00 | 1647.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1611.00 | 1612.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1578.00 | 1579.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1543.00 | 1544.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1511.00 | 1512.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1476.00 | 1477.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1443.00 | 1444.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1408.00 | 1409.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1367.00 | 1368.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1326.00 | 1327.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1286.00 | 1287.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1245.00 | 1246.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1205.00 | 1206.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1164.00 | 1165.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1124.00 | 1125.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1090.00 | 1091.00 | 9 | N/A | 2011-03-25 |
2010-08-02 | HOLLOW STEEL CARRIER | 1050.00 | 1051.00 | 9 | N/A | 2011-03-25 |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2010-08-23 | FRAC | N/A | 20/40 | SAND | N/A | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 2.1 | |
2010-08-25 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-25 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-23 | FRAC | N/A | 20/40 | SAND | 2.4 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 | |
2010-08-24 | FRAC | N/A | 20/40 | SAND | 4.1 |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 191.10 | 0 | 0.00 |
2015 | Tundra Oil & Gas Limited | 181.10 | 0 | 0.00 |
2016 | Tundra Oil & Gas Limited | 237.00 | 0 | 0.00 |
2017 | Tundra Oil & Gas Limited | 196.10 | 0 | 0.00 |
2018 | Tundra Oil & Gas Limited | 293.90 | 0 | 0.00 |
2019 | Tundra Oil & Gas Limited | 42.00 | 0 | 0.00 |
2020 | Tundra Oil & Gas Limited | 19.40 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Tundra Oil & Gas Limited | 140.10 | 328 | 10.30 | 328 | 0.00 | 0.00 |
2015 | Tundra Oil & Gas Limited | 117.00 | 361 | 9.10 | 361 | 0.00 | 0.00 |
2016 | Tundra Oil & Gas Limited | 146.60 | 366 | 7.10 | 366 | 0.00 | 0.00 |
2017 | Tundra Oil & Gas Limited | 163.90 | 203 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Tundra Oil & Gas Limited | 233.70 | 282 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Tundra Oil & Gas Limited | 27.70 | 90 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Tundra Oil & Gas Limited | 1.80 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]