If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304012703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.594004,"lon":-110.068177,"icon":""}]} |
Location: 00/03-27-030-01W4/0 | |
Location Alias: 00/03-27-30-01 W4M | |
Location Alias 2: 00/03-27-030-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Special Areas No. 3 | |
Well Name: OLY ET AL ANTELOPE 3-27-30-1 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0139423 | |
License Date: 1989-03-23 | |
License Status: RecCertified | |
Spud Date: 1989-03-27 | |
Final Drill Date: 1989-03-30 | |
Well Total Depth: 895.00 m | |
Surface Hole Latitude: 51.594004 | |
Surface Hole Longitude: -110.068177 |
Date | Event |
---|---|
1989-03-23 | Obtained License |
1989-03-28 | Surface Casing Operation Performed |
1989-03-30 | Finished Drilling |
1989-03-30 | Well Log Performed |
1989-03-30 | Well Mode changed to Drilled and Cased |
1989-03-31 | Production Casing Operation Performed |
1989-03-31 | Rig Released |
1989-04-25 | Well Log Performed |
1989-04-27 | Perforation Treatment Performed - Jet Perforation |
1989-04-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-04-28 | Perforation Treatment Performed - Jet Perforation |
1989-04-28 | Plug Back Performed |
1989-04-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-04-29 | Perforation Treatment Performed - Jet Perforation |
1989-04-29 | Plug Back Performed |
1989-05-18 | Well Began Production |
1989-05-18 | Well Fluid changed to Gas |
1989-05-18 | Well Mode changed to Flowing |
1992-03-01 | Well Fluid changed to Gas |
1992-03-01 | Well Mode changed to Suspended |
1992-10-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-10-24 | Plug Back Performed |
1992-10-24 | Well Fluid changed to Gas |
1992-10-24 | Well Log Performed |
1992-10-24 | Well Mode changed to Abandoned |
1992-10-29 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-04-27 | Perforation | 852.00 | 855.00 | 13 |
1989-04-28 | Packing Device Capped w/Cement | 842.00 | 850.00 | 0 |
1989-04-28 | Perforation | 818.00 | 820.00 | 13 |
1989-04-29 | Packing Device Capped w/Cement | 804.00 | 812.00 | 0 |
1989-04-29 | Perforation | 769.20 | 771.50 | 13 |
1992-10-24 | Packing Device Capped w/Cement | 757.00 | 765.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 5513 | 0.0 | 0.0 | 0.0 |
1990 | 6082 | 0.0 | 0.0 | 0.0 |
1991 | 6169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]