X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304012703000

Well Details

Well ID: 0304012703000
Loading map...
Location: 00/03-27-030-01W4/0
Location Alias: 00/03-27-30-01 W4M
Location Alias 2: 00/03-27-030-01 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 01
Section: 27
County/Municipality: Special Areas No. 3
Well Name: OLY ET AL ANTELOPE 3-27-30-1
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0139423
License Date: 1989-03-23
License Status: RecCertified
Spud Date: 1989-03-27
Final Drill Date: 1989-03-30
Well Total Depth: 895.00 m
Surface Hole Latitude: 51.594004
Surface Hole Longitude: -110.068177

For data sources see[1][2]

Well History

Date Event
1989-03-23 Obtained License
1989-03-28 Surface Casing Operation Performed
1989-03-30 Finished Drilling
1989-03-30 Well Log Performed
1989-03-30 Well Mode changed to Drilled and Cased
1989-03-31 Production Casing Operation Performed
1989-03-31 Rig Released
1989-04-25 Well Log Performed
1989-04-27 Perforation Treatment Performed - Jet Perforation
1989-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-28 Perforation Treatment Performed - Jet Perforation
1989-04-28 Plug Back Performed
1989-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-29 Perforation Treatment Performed - Jet Perforation
1989-04-29 Plug Back Performed
1989-05-18 Well Began Production
1989-05-18 Well Fluid changed to Gas
1989-05-18 Well Mode changed to Flowing
1992-03-01 Well Fluid changed to Gas
1992-03-01 Well Mode changed to Suspended
1992-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-24 Plug Back Performed
1992-10-24 Well Fluid changed to Gas
1992-10-24 Well Log Performed
1992-10-24 Well Mode changed to Abandoned
1992-10-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-04-27 Perforation 852.00 855.00 13
1989-04-28 Packing Device Capped w/Cement 842.00 850.00 0
1989-04-28 Perforation 818.00 820.00 13
1989-04-29 Packing Device Capped w/Cement 804.00 812.00 0
1989-04-29 Perforation 769.20 771.50 13
1992-10-24 Packing Device Capped w/Cement 757.00 765.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 5513 0.0 0.0 0.0
1990 6082 0.0 0.0 0.0
1991 6169 0.0 0.0 0.0

For data sources see[5]

References