INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1292326897
|
2014-08-21
|
|
I was on location to check the status of Pep drilling. The rig is currently drilling an 14.75" diameter hole on fresh water mud at 308'. They are going to drill to 490' before installing and cementing their 11.75" diameter surface casing. They expect to be cementing this casing tonight/early morning. There are no violations at this time.
|
|
|
|
1100295942
|
2014-08-20
|
|
I was on location to check the status of Pep Drilling rigging up on location. Currently the rig is set and the pits have been dug into good soil and are being lined. The Pason drilling computer is being rigged up and the mouse and rat holes are going to be drilled. They plan on spudding the well tonight.
|
|
|
|
1604024874
|
2014-08-26
|
|
I was on location to check the status of Pep drilling. Currently the rig is drilling at 3398' in the Helderberg formation. When drilling through the Oriskany they encountered water flow and had to begin soaping the well. The air hammer failed and they tripped into the hole with a trichone bit and are currently drilling with it. The pits have been sucked down and are in good condition. There are no violations at this time.
|
|
|
|
1955208059
|
2014-08-18
|
|
I was on location to check the status of Pep Drilling rigging up on location. The rig floor has been set over the hole and the derrick is currently having some maintenance done on the pulleys and guidelines. The watertight cellar and PVC flow line has been set on location and will flow to the pits when they are dug. Currently the pits are being excavated but will not be completed until 8/19/14. They expect to spud the well 8/20/14 morning.
|
|
|
|
235462072
|
2014-08-25
|
|
I was on location to check the status of Pep Drilling this well. Currently the rig is drilling ahead at 2561' with a 7.865" hammer bit. I walked the location and new erosion controls have been installed following heavy rains seen last week. The pits are in good condition and there are no issues with the liners. The reserve pit is currently being drawn down by Mac Oil water trucks to handle any possible water encountered in the Oriskany Sandstone. They will drill on air until they reach their mud up point and load the hole with saturated brine. There are no violations at this time.
|
|
|
|