34-111-24374

Well Details

Well ID: 34-111-24374
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-06-11
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8183164666
Longitude: -81.3041633108

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-104973216 2014-07-30 Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
-1164136253 2013-07-22 Inspection found the current drilling depth to be 12,689' using a 8.750 drill bit and drilling on oil based mud. The projected well bore total depth is 17,679'.
-1993117978 2013-08-14 The well is in the production testing stages and is being flow tested. The tubing pressure is 5000 psi. I asked the company man on site to place proper well identification on each well head.
-2041437847 2013-09-24 Inspection and status check of the completion process found the 7 stages of the well bore have been completed and Arrow well services rig is making a cleanout run on the production casing. I met with several of the service company and producing company safety representatives on site and discussed the flow back and clean out procedures, proper well head control is in place and the clean out is to be performed with fresh water with no produced water to be reused eliminating the chance of condensate being introduced to any pump on location.
-239972832 2013-12-12 Bill Stolarik and I stopped in at the location and inspected the site. Well is in production. Tanks, dike and identifications are in place.
-248919027 2013-06-24 Inspection found the current drilling depth to be 174' using a 24 bit and drilling on air with the proposed surface casing string depth to be 400'. KB is 24'.
-454331525 2013-06-13 Status check inspection found Express Energy drilling the conductor hole. The well was spudded on 06/12/13 and the drilling company is having difficulty drilling the conductor hole due to being on solid bedrock.
-701613509 2013-07-15 inspection found the drilling company Patterson Drilling rig 316 rigging up the casing crew and getting ready to run 7071' of 9.625 casing. The casing tally was received and reviewed and the company man will post me this evening of their progress.
-781576551 2013-08-14 The well is in the production testing stages and is being flow tested. The tubing pressure is 5000 psi. I asked the company man on site to place proper well identification on each well head.
-782926415 2013-07-17 Inspection and status check of the drilling progress to witness the BOP test, The Blind and Pipe rams along with the Choke Manifold were tested to 5000 psi the annular side was tested to 2500 psi. Records were also received from the 9.625 upper casing upper section cement job, The company will test the casing integrity after drilling through the 2 stage tool and running the drill string to TD near the float collar to 2700 psi.
1059096311 2013-07-29 status check inspection on the progress on the running of the 5.5 production casing. The well bore Total drilled depth was 17,688' ant the current casing depth is 12,822'.
1371296683 2013-06-14 Witness cementing of casing string Express Energy Services drilled to 90' of 32" hole and ran 90' of new 26" casing and cemented it in place with 500 sacks cement with 45 bbl of good returns.

Note: Driller encountered water 8' below ground level and also they encountered extremely hard drilling@85' they called and we granted them modified setting depth of conductor pipe.

1372266443 2013-06-26 On 06/25 & 26 I witnessed the running and setting of 392' of 18.625 surface casing with 100% cement excess ran and 75 barrels of good cement returns to surface. The casing was pressure tested to 700 psi which was 500 over lift pressure with no recorded pressure loss. The mix water was tested and showed no chlorides prior to cementing. We had several job delays due to lightening.
1373074637 2013-07-05 Notification was received from the company man on site that they have lost the 12.250 cutting head off the hammer bit in the hole at 4300' and are plugging back to 3800' with a kick plug and will deviate around the lost cutting head.
1375214600 2013-07-30 Status check inspection of the running of the 5.5 production casing, 17,685' of production casing has been ran and set in the well bore with proper centralizer placement along with a casing shoe and float collar ran. The well bore had over 2500 units of 3rd party gas and the company was circulating oil based mud trying to kill the gas pressure in order to start the cementing process.
1376479224 2013-08-14 The well bore drilling process is complete and the well is awaiting stimulation, There are 2 other wells on the pad that are in production.
1380728731 2013-10-02 Inspection of the completion process found the wire line company running in the hole to set a plug at 14,571' and perforate the 16th stage from 14,555' to 14,389' for a total stage length of 197'. A status check on the preliminary restoration found that vegetation has been established and erosion and sedimentation control is in place. With a tank production fluid tank battery erected on site with metal containment.
1383149360 2013-10-30 The well is the 3rd well on the drill pad to be completed and is now capable of production, There are 8 400 barrel production tanks on location in use.
1429716572 2013-07-16 On this day I witnessed the displacement of the bottom section plug below the DV tool which is set at 4710'. The plug was displaced with 154 barrels of oil based drilling mud on top of the wiper plug and chased with 340 barrels of KCL. The 2 stage relief tool was dropped and allowed to fall to the seat for a time frame of 30 minutes. Upon the opening of the tool relief ports the hole shall be circulated with KCL for 8 hours by the rig mud pumps allowing the bottom section cement to cure. The top section shall then be cemented.
1610460774 2013-07-08 Status check inspection plug was set at 4300' over a lost 12.250 bit with the top of the plug at 4300'. The company is currently drilling at 3616 starting their 6 degree deviation kick around the lost bit and should fall back in at 4825' under the bit. A cement ticket was received from the kick plug.
317777720 2013-06-12 Notification was received that the said well is to be spudded and the conductor set on this day. I inspected the site and reviewed the permit conditions with the drilling superintendent for Express Energy who is the drilling contractor. I shall Gps the well once the conductor is set.
337522129 2013-06-16 On this day I witnessed Allied Cement Services top off the initial conductor job that had settled out. 6 barrels of class A cement were used.
827444911 2013-09-17 Status check on the completion process found Rush Wire line Services perforating the 5th stage to be completed, a solid bridge plug was set at 16,736' and 6 clusters of 10 perforations were shot from 16,721' to 16,555' with the annular pressure being monitored electronically with a transducer.
84380566 2013-07-01 Inspection found the company just finishing testing the BOP. Records were received from the setting of the 13.375 casing string at 2063'.
992197433 2013-12-13 The well is in production and on line, The company has completed 3 wells on the pad and is currently in the process of drilling 3 more.