X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24374

Well Details

Well ID: 34-111-24374
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000538
Farm/Lease Name: GARY UNIT
License Status: Producing
License Date: 2014-05-07
Spud Date: 2013-06-11
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-08-01
Well Total Depth: 17685.00 ft
Configuration: Horizontal
Latitude: 39.810000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-26 Proposed Formations:POINT PLEASANT, Issued Date:4/26/2013, Expired Date:4/26/2015 12:00:00 PM, Drilling unit acres:452.533, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-08-01
Correction to Well 2013-08-30 CORRECTION TO TARGET & SURFACE INFORMATON (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 645.286 ACRES.
Completion Report Received 2014-01-23
APP 2014-05-07 Proposed Formations:POINT PLEASANT, Issued Date:5/7/2014, Expired Date:5/6/2016 12:00:00 PM, Drilling unit acres:645.989, Proposed Well Type:OG, Proposed Well Class:EDPW
Construction Permit Expires 2016-05-06
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-01-24 8877 17508 0
8877 17508 0
8877 17508 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/16/2013 10/09/2013 8107 11,671,600.0 533812

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Antero Resources Base Fluid Water 7732-18-5 100 89.8797 97,341,100.0
LGC-15 U.S. Well Services, LLC Gelling Agents Suspending agent (solid) 14808-60-7 3 0.01054 11414.7
Guar Gum 9000-30-0 50 0.06891 74634.4
Petroleum Distillates 64742-47-8 60 0.06527 70683.2
Surfactant 68439-51-0 3 0.00413 4478.06
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.07803 84508
Hydrogen Chloride 7641-01-1 18 0.01864 20186.2
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0 0
Deionized Water 7732-18-5 28 0 0
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.7782 10,589,900.0
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00094 1018
WFRA-405 U.S. Well Services, LLC Friction Reducer Anionic Polyacrylamide Proprietary 0 0.02507 27148.4
Ethoxylated alcohol blend Proprietary 5 0.00313 3393.55
Petroleum Distillates 64742-47-8 22 0.02018 21854.4
Water 7732-18-5 40 0.02507 27148.4
Crystalline Salt 12125-02-9 5 0.00313 3393.55
SI-1000 U.S. Well Services, LLC Scale Inhibitor Anionic Copolymer Proprietary 0 0.00425 4599.39
Ethylene Glycol 107-21-1 20 0.00384 4157.47
Water 7732-18-5 30 0.0032 3466.98
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitors Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.00005000 57.4209
Triethyl Phosphate 78-40-0 3 0.00001000 9.34497
Ethylene Glycol 107-21-1 31 0.0002 214.672
Isopropyl Alcohol 67-63-0 3 0.00001000 7.42156
Ethoxylated Nonylphenol 68412-54-4 5 0.00001000 15.5749
2-Butoxyethanol 111-76-2 7 0.00005000 50.7218
N,N-Dimethylformamide 68-12-2 15 0.00006000 66.353
Water 7732-18-5 20 0.00002000 19.7033
Cinnamaldehyde 104-55-2 5 0.00005000 58.209

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-10-04 H2O 15 6193 Bbl 255960 US Well Services Inc STAGE 22

60 SHOTS

2013-09-30 H2O 15 6306 Bbl 257500 US Well Services Inc STAGE 10

60 SHOTS

2013-09-17 H2O 15 6586 Bbl 200638 Superior Well Services STAGE 5

60 SHOTS

2013-10-07 H2O 15 5902 Bbl 263380 US Well Services Inc STAGE 37

60 SHOTS

2013-09-17 H2O 15 7147 Bbl 229080 US Well Services Inc STAGE 3

60 SHOTS

2013-10-05 H2O 15 5967 Bbl 256670 US Well Services Inc STAGE 27

60 SHOTS

2013-10-01 H2O 15 7078 Bbl 207780 Superior Well Services STAGE 13

60 SHOTS

2013-09-19 H2O 15 5708 Bbl 235498 US Well Services Inc STAGE 7

60 SHOTS

2013-09-30 H2O 15 7110 Bbl 244740 US Well Services Inc STAGE 9

60 SHOTS

2013-10-07 H2O 15 6736 Bbl 246310 US Well Services Inc STAGE 38

60 SHOTS

2013-10-06 H2O 15 5691 Bbl 225810 US Well Services Inc STAGE 31

60 SHOTS

2013-10-01 H2O 15 6230 Bbl 262130 US Well Services Inc STAGE 12

60 SHOTS

2013-10-04 H2O 15 6843 Bbl 235340 US Well Services Inc STAGE 26

60 SHOTS

2013-10-09 H2O 15 6188 Bbl 256270 US Well Services Inc STAGE 44

60 SHOTS

2013-10-01 H2O 15 6302 Bbl 262170 US Well Services Inc STAGE 11

60 SHOTS

2013-09-17 H2O 15 6620 Bbl 130760 US Well Services Inc STAGE 4

60 SHOTS

2013-10-06 H2O 15 6639 Bbl 256970 US Well Services Inc STAGE 32

60 SHOTS

2013-10-02 H2O 15 6073 Bbl 238040 US Well Services Inc STAGE 18

60 SHOTS

2013-10-05 H2O 15 6109 Bbl 261985 US Well Services Inc STAGE 41

60 SHOTS

2013-10-02 H2O 15 6249 Bbl 260100 US Well Services Inc STAGE 15

60 SHOTS

2013-10-02 H2O 15 6193 Bbl 259800 US Well Services Inc STAGE 16

60 SHOTS

2013-09-30 H2O 15 6783 Bbl 262840 US Well Services Inc STAGE 8

60 SHOTS

2013-10-04 H2O 15 6108 Bbl 257830 US Well Services Inc STAGE 23

60 SHOTS

2013-10-03 H2O 15 6193 Bbl 260150 US Well Services Inc STAGE 19

60 SHOTS

2013-10-03 H2O 15 6235 Bbl 248305 US Well Services Inc STAGE 20

60 SHOTS

2013-10-03 H2O 15 6218 Bbl 253650 US Well Services Inc STAGE 21

60 SHOTS

2013-10-06 H2O 15 6055 Bbl 285245 US Well Services Inc STAGE 29

60 SHOTS

2013-09-17 ACID 0 6620 Bbl 130760 US Well Services Inc Stage 4 to be completed with 60 perforations shot in the horizontal well bore section.
2013-10-08 H2O 15 5869 Bbl 262500 US Well Services Inc STAGE 39

60 SHOTS

2013-10-07 H2O 15 6119 Bbl 258370 US Well Services Inc STAGE 34

60 SHOTS

2013-10-06 H2O 15 6038 Bbl 258565 US Well Services Inc STAGE 30

60 SHOTS

2013-10-09 H2O 15 6216 Bbl 260895 US Well Services Inc STAGE 43

60 SHOTS

2013-09-16 H2O 15 6651 Bbl 232210 US Well Services Inc STAGE 1

60 SHOTS

2013-10-04 H2O 15 6061 Bbl 258775 US Well Services Inc STAGE 25

60 SHOTS

2013-09-18 H2O 15 5995 Bbl 66318 US Well Services Inc STAGE 6

60 SHOTS

2013-10-04 H2O 15 6059 Bbl 257020 US Well Services Inc STAGE 24

60 SHOTS

2013-10-07 H2O 15 6635 Bbl 250900 US Well Services Inc STAGE 36

60 SHOTS

2013-10-06 H2O 15 5986 Bbl 248150 US Well Services Inc STAGE 33

60 SHOTS

2013-10-05 H2O 15 6043 Bbl 262570 US Well Services Inc STAGE 28

60 SHOTS

2013-10-02 H2O 15 6164 Bbl 261400 US Well Services Inc STAGE 17

60 SHOTS

2013-10-08 H2O 15 5871 Bbl 251530 US Well Services Inc STAGE 40

60 SHOTS

2013-10-07 H2O 15 6641 Bbl 232710 US Well Services Inc STAGE 35

60 SHOTS

2013-10-01 H2O 15 6948 Bbl 226890 US Well Services Inc STAGE 14

60 SHOTS

2013-09-16 H2O 15 6615 Bbl 263850 US Well Services Inc STAGE 2

60 SHOTS

2013-10-08 H2O 15 6522 Bbl 149830 US Well Services Inc STAGE 42

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ANTERO RESOURCES CORPORATION 1329318 2959 67
2014 ANTERO RESOURCES CORPORATION 2752275 721 345
2015 ANTERO RESOURCES CORPORATION 1238199 1055 365
2016 ANTERO RESOURCES CORPORATION 734202 206 363
2017 ANTERO RESOURCES CORPORATION 573519 170 365
2018 ANTERO RESOURCES CORPORATION 461587 162 365
2019 ANTERO RESOURCES CORPORATION 103402 78 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ANTERO RESOURCES CORPORATION Brine 12259 67
2014 ANTERO RESOURCES CORPORATION Brine 51260 345
2015 ANTERO RESOURCES CORPORATION Brine 10031 365
2016 ANTERO RESOURCES CORPORATION Brine 6654 363
2017 ANTERO RESOURCES CORPORATION Brine 3984 365
2018 ANTERO RESOURCES CORPORATION Brine 3233 365
2019 ANTERO RESOURCES CORPORATION Brine 623 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-104973216 2014-7-30 0:00: PL No Violations
-1164136253 2013-7-22 0:00: DD No Violations 1.50
-1562463184 2019-1-29 0:00: PW No Violations 0.10
-1852827231 2018-3-7 0:00:0 PW No Violations 0.20
-1993117978 2013-8-14 0:00: PW No Violations
-2041437847 2013-9-24 0:00: CT No Violations 2.80
-239972832 2013-12-12 0:00 PW No Violations 0.50
-248919027 2013-6-24 0:00: DD No Violations 1.50
-454331525 2013-6-13 0:00: DD No Violations 1.00
-701613509 2013-7-15 0:00: DD No Violations
-781576551 2013-8-14 0:00: PW No Violations
-782926415 2013-7-17 0:00: DD No Violations 2.00
0084380566 2013-07-01 Drill / Deepen / Reopen No Violations Inspection found the company just finishing testing the BOP. Records were received from the setting of the 13.375 casing string at 2063.
0104973216 2014-07-30 Preliminary Restoration No Violations Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
0239972832 2013-12-12 Production Wells No Violations Bill Stolarik and I stopped in at the location and inspected the site. Well is in production. Tanks, dike and identifications are in place.
0248919027 2013-06-24 Drill / Deepen / Reopen No Violations Inspection found the current drilling depth to be 174 using a 24 bit and drilling on air with the proposed surface casing string depth to be 400. KB is 24.
0317777720 2013-06-12 Drill / Deepen / Reopen No Violations Notification was received that the said well is to be spudded and the conductor set on this day. I inspected the site and reviewed the permit conditions with the drilling superintendent for Express Energy who is the drilling contractor. I shall Gps the well once the conductor is set.
0337522129 2013-06-16 Casing String Witnessed No Violations On this day I witnessed Allied Cement Services top off the initial conductor job that had settled out. 6 barrels of class A cement were used.
0454331525 2013-06-13 Drill / Deepen / Reopen No Violations Status check inspection found Express Energy drilling the conductor hole. The well was spudded on 06/12/13 and the drilling company is having difficulty drilling the conductor hole due to being on solid bedrock.
0701613509 2013-07-15 Drill / Deepen / Reopen No Violations inspection found the drilling company Patterson Drilling rig 316 rigging up the casing crew and getting ready to run 7071 of 9.625 casing. The casing tally was received and reviewed and the company man will post me this evening of their progress.
0781576551 2013-08-14 Production Wells No Violations The well is in the production testing stages and is being flow tested. The tubing pressure is 5000 psi. I asked the company man on site to place proper well identification on each well head.
0782926415 2013-07-17 Drill / Deepen / Reopen No Violations Inspection and status check of the drilling progress to witness the BOP test, The Blind and Pipe rams along with the Choke Manifold were tested to 5000 psi the annular side was tested to 2500 psi. Records were also received from the 9.625 upper casing upper section cement job, The company will test the casing integrity after drilling through the 2 stage tool and running the drill string to TD near the float collar to 2700 psi.
0827444911 2013-09-17 Completion Testing No Violations Status check on the completion process found Rush Wire line Services perforating the 5th stage to be completed, a solid bridge plug was set at 16,736 and 6 clusters of 10 perforations were shot from 16,721 to 16,555 with the annular pressure being monitored electronically with a transducer.
0992197433 2013-12-13 Production Wells No Violations The well is in production and on line, The company has completed 3 wells on the pad and is currently in the process of drilling 3 more.
1059096311 2013-07-29 Casing String Witnessed No Violations status check inspection on the progress on the running of the 5.5 production casing. The well bore Total drilled depth was 17,688 ant the current casing depth is 12,822.
1164136253 2013-07-22 Drill / Deepen / Reopen No Violations Inspection found the current drilling depth to be 12,689 using a 8.750 drill bit and drilling on oil based mud. The projected well bore total depth is 17,679.
1261280386 2018-03-07 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 100 pounds pressure and the 9.625 casing well head reads 1,000 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair.
1371296683 2013-06-14 Casing String Witnessed No Violations Witness cementing of casing string Express Energy Services drilled to 90 of 32 hole and ran 90 of new 26 casing and cemented it in place with 500 sacks cement with 45 bbl of good returns.

Note: Driller encountered water 8 below ground level and also they encountered extremely hard drilling@85 they called and we granted them modified setting depth of conductor pipe.

1372266443 2013-06-26 Casing String Witnessed No Violations On 06/25 & 26 I witnessed the running and setting of 392 of 18.625 surface casing with 100% cement excess ran and 75 barrels of good cement returns to surface. The casing was pressure tested to 700 psi which was 500 over lift pressure with no recorded pressure loss. The mix water was tested and showed no chlorides prior to cementing. We had several job delays due to lightening.
1373074637 2013-07-05 Drill / Deepen / Reopen No Violations Notification was received from the company man on site that they have lost the 12.250 cutting head off the hammer bit in the hole at 4300 and are plugging back to 3800 with a kick plug and will deviate around the lost cutting head.
1375214600 2013-07-30 Casing String Witnessed No Violations Status check inspection of the running of the 5.5 production casing, 17,685 of production casing has been ran and set in the well bore with proper centralizer placement along with a casing shoe and float collar ran. The well bore had over 2500 units of 3rd party gas and the company was circulating oil based mud trying to kill the gas pressure in order to start the cementing process.
1376479224 2013-08-14 Drill / Deepen / Reopen No Violations The well bore drilling process is complete and the well is awaiting stimulation, There are 2 other wells on the pad that are in production.
1380728731 2013-10-02 Completion Testing No Violations Inspection of the completion process found the wire line company running in the hole to set a plug at 14,571 and perforate the 16th stage from 14,555 to 14,389 for a total stage length of 197. A status check on the preliminary restoration found that vegetation has been established and erosion and sedimentation control is in place. With a tank production fluid tank battery erected on site with metal containment.
1383149360 2013-10-30 Production Wells No Violations The well is the 3rd well on the drill pad to be completed and is now capable of production, There are 8 400 barrel production tanks on location in use.
1429716572 2013-07-16 Casing String Witnessed No Violations On this day I witnessed the displacement of the bottom section plug below the DV tool which is set at 4710. The plug was displaced with 154 barrels of oil based drilling mud on top of the wiper plug and chased with 340 barrels of KCL. The 2 stage relief tool was dropped and allowed to fall to the seat for a time frame of 30 minutes. Upon the opening of the tool relief ports the hole shall be circulated with KCL for 8 hours by the rig mud pumps allowing the bottom section cement to cure. The top section shall then be cemented.
1562463184 2019-01-29 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 60 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 80 psi.
1610460774 2013-07-08 Drill / Deepen / Reopen No Violations Status check inspection plug was set at 4300 over a lost 12.250 bit with the top of the plug at 4300. The company is currently drilling at 3616 starting their 6 degree deviation kick around the lost bit and should fall back in at 4825 under the bit. A cement ticket was received from the kick plug.
1852827231 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the back of the pad, and a midstream facility behind the gas processing units.
1993117978 2013-08-14 Production Wells No Violations The well is in the production testing stages and is being flow tested. The tubing pressure is 5000 psi. I asked the company man on site to place proper well identification on each well head.
2041437847 2013-09-24 Completion Testing No Violations Inspection and status check of the completion process found the 7 stages of the well bore have been completed and Arrow well services rig is making a cleanout run on the production casing. I met with several of the service company and producing company safety representatives on site and discussed the flow back and clean out procedures, proper well head control is in place and the clean out is to be performed with fresh water with no produced water to be reused eliminating the chance of condensate being introduced to any pump on location.
2095342462 2020-5-22 0:00: PW No Violations 1.00
317777720 2013-6-12 0:00: DD No Violations 3.00
337522129 2013-6-16 0:00: CS No Violations 1.00
827444911 2013-9-17 0:00: CT No Violations 1.20
84380566 2013-7-1 0:00:0 DD No Violations
992197433 2013-12-13 0:00 PW No Violations 1.00

For data sources see[10]

References