If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-111-24577 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84698434,"lon":-81.24554036,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2015-03-25 | |
| Unconventional: | |
| Configuration: | |
| Well Status: Drilling | |
| Violations: 0 | |
| Latitude: 39.84698434 | |
| Longitude: -81.24554036 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1427316987 | 2015-03-25 | The said well was spudded on 03/25/2015 by Rocky Mountain Drilling's top hole rig with a 32 x 100' conductor borehole being drilled and 100' of 26 weld connection conductor being set. Express Energy Cement service cemented the conductor using 330 sacks of class A-2% calcium .125 pps lcm 100% open hole excess cement displaced with 55 bbl of fresh water with good cement returns witnessed to surface. | ||||
| 1428949563 | 2015-04-13 | Patterson Rig 332 is now on the hole and has drilled a 17.5 surface borehole to a depth of 1,256' and ran 1,259' of 13.375 54.5# J-55 casing with a guide shoe and float collar ran. Halliburton cement service is on location to cement the casing using 1225 sacks of Halcem cement with 50% open hole cement excess ran and 50 bbl of 6% gel ran ahead with the casing pressure tested to 500 psi over lift pressure upon the landing of the plug with good cement returns to surface. | ||||
| 1429623114 | 2015-04-21 | Status check inspection on the current drilling process found Patterson Drilling rig # 342 on location drilling the 12.250 2nd intermediate well bore at a current depth of 7,490'. The company is currently implementing a 1.8 degree deviation in the direction of 36.39 degrees azimuth. | ||||
| 1429805923 | 2015-04-23 | Status check inspection on the current drilling progress found Patterson Drilling rig 342 on location with the 9.625 intermediate casing recently set to a depth of 7,721' and cemented in place by Halliburton Cement services. The rig is currently skidding over to 3411124578 the Delong #3-H. |
For data sources see[1]