34-111-24577

Well Details

Well ID: 34-111-24577
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001235
Farm/Lease Name: DELONG UNIT
License Status: Producing
License Date: 2015-03-05
Spud Date: 2015-03-25
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-07-10
Well Total Depth: 17278.00 ft
Configuration: Horizontal
Latitude: 39.840000
Longitude: -81.240000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-03-05 Proposed Formations:POINT PLEASANT, Issued Date:3/5/2015, Expired Date:3/4/2017 12:00:00 PM, Drilling unit acres:610.165, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2015-07-10
Completion Report Received 2016-01-22
Construction Permit Expires 2017-03-04
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-01-22 8646 17187 0
8646 17187 0
8646 17187 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/24/2015 09/04/2015 8387 12,832,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.17817 211416
Hydrogen Chloride 7647-01-0 18 0.04256 50500.4
Water Antero Resources Base Fluid Water 7732-18-5 100 90.1943 107,022,000.0
AI-301 U.S. Well Services Acid Corrosion Inhibitors Coco amine 61791-14-8 5 0.00002000 22.2511
Polyethylene polyamine 68603-67-8 10 0.00004000 48.7106
Hydrogen Chloride 7647-01-0 10 0.00005000 56.1115
Diethylene Glycol 111-46-6 30 0.00014 162.385
Methenamine 100-97-0 20 0.00011 128.67
LGC-15 U.S. Well Services Gelling Agents Petroleum Distillates 64742-47-8 60 0.03615 42896.5
Guar Gum 9000-30-0 50 0.03817 45294.5
Suspending agent (solid) 14808-60-7 3 0.00584 6927.39
Surfactant 68439-51-0 3 0.00229 2717.67
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.39296 11,145,400.0
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00164 1950
SI-1100 U.S. Well Services Scale Inhibitor Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 7.5 0.00127 1508.14
Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00148 1757.64
Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00082 968.191
Phosphino carboxylic acid polymer 71050-62-9 5 0.00082 968.191
Water 7732-18-5 80 0.01004 11916.2
Ethylene Glycol 107-21-1 25 0.00355 4207.91
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00033 387.276
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00413 4905.92
Deionized Water 7732-18-5 28 0.00236 2802.24
WFRA-405 U.S. Well Services Friction Reducer Anionic Polyacrylamide Proprietary 40 0.02733 32429.3
Sodium Chloride 7647-14-5 20 0.01367 16214.6
Petroleum Distillates 64742-47-8 20 0.011 13052.8
Ethoxylated alcohol blend Proprietary 5 0.00342 4053.66
Water 7732-18-5 40 0.02733 32429.3

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-09-03 H2O 0 5706 Bbl 233020 US Well Services Inc Status check on site inspection to witness the well stimulation process found US Well Service pressure pumping initiating the 42nd of 49 total stages to be completed with 500 gallons of 15% Hcl ran ahead of the process. Bass Service company's' well head is contracted to provide well head control during the process with the well head and stimulation iron pressure rated at 15,000 psi. Renegade wireline service has perforated the well by first setting a 15,000# rated pressure completion plug at

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 562074 425 61
2016 ANTERO RESOURCES CORPORATION 2777308 518 337
2017 ANTERO RESOURCES CORPORATION 1057347 206 365
2018 ANTERO RESOURCES CORPORATION 644378 228 363
2019 ANTERO RESOURCES CORPORATION 120761 92 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 13073 61
2016 ANTERO RESOURCES CORPORATION Brine 43774 337
2017 ANTERO RESOURCES CORPORATION Brine 7037 365
2018 ANTERO RESOURCES CORPORATION Brine 6321 363
2019 ANTERO RESOURCES CORPORATION Brine 3020 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-108298861 2017-7-17 0:00: PL No Violations 0.20
-1952522211 2015-11-23 0:00 PL No Violations 0.50
-1975595550 2020-4-20 0:00: PW No Violations 1.00
-275521500 2019-1-24 0:00: PW No Violations 0.20
0108298861 2017-07-17 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control and vegetation established in the affected area of the well pad. There are (4) producing wells on the pad with the productin valves open and the wells selling to gas processing units with (4) units on location. Supporting the gas processing units are (8) steel production tanks that are 400 barrel cepacity with the tanks all situated inside a polyment lined steel containment dike area. Proper well identification is posted.
0275521500 2019-01-24 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (4) gas processing units (GPU), (2) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 80 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
1427316987 2015-03-25 Casing String Witnessed No Violations The said well was spudded on 03/25/2015 by Rocky Mountain Drillings top hole rig with a 32 x 100 conductor borehole being drilled and 100 of 26 weld connection conductor being set. Express Energy Cement service cemented the conductor using 330 sacks of class A-2% calcium .125 pps lcm 100% open hole excess cement displaced with 55 bbl of fresh water with good cement returns witnessed to surface.
1428949563 2015-04-13 Casing String Witnessed No Violations Patterson Rig 332 is now on the hole and has drilled a 17.5 surface borehole to a depth of 1,256 and ran 1,259 of 13.375 54.5# J-55 casing with a guide shoe and float collar ran. Halliburton cement service is on location to cement the casing using 1225 sacks of Halcem cement with 50% open hole cement excess ran and 50 bbl of 6% gel ran ahead with the casing pressure tested to 500 psi over lift pressure upon the landing of the plug with good cement returns to surface.
1429623114 2015-04-21 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling process found Patterson Drilling rig # 342 on location drilling the 12.250 2nd intermediate well bore at a current depth of 7,490. The company is currently implementing a 1.8 degree deviation in the direction of 36.39 degrees azimuth.
1429805923 2015-04-23 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found Patterson Drilling rig 342 on location with the 9.625 intermediate casing recently set to a depth of 7,721 and cemented in place by Halliburton Cement services. The rig is currently skidding over to 3411124578 the Delong #3-H.
1602758512 2015-06-30 Drill / Deepen / Reopen No Violations Status check inspection on the well drilling process found Patterson Drilling rig # 342 on location drilling the 8.750 horizontal well bore section at a measured depth of 11,176 in the directional Azimuth of 332 degrees and inclination of 90.80 degrees with the horizontal curve being landed at 8,899 measured depth with a 8,386 true vertical depth using 12.8# drilling mud and implementing managed pressure drilling to control the formation pressure.
1630125068 2017-07-17 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control and vegetation established in the affected area of the well pad. There are (4) producing wells on the pad with the productin valves open and the wells selling to gas processing units with (4) units on location. Supporting the gas processing units are (8) steel production tanks that are 400 barrel cepacity with the tanks all situated inside a polyment lined steel containment dike area.
1952522211 2015-11-23 Preliminary Restoration No Violations Preliminary Restoration status check inspection finds the area affected by the well pad construction has been restored with erosion control and vegetation being established and in place. Addressing the well head-Upon inspection of the well it was observed that the drilling and well completion process is now complete with the well being flow tested and capable of production. The company has erected a tank battery consisting of a total of 8 tanks of 400 barrel capacity located inside of a polymer lined metal containment dike area. Proper well identification is posted.
1978759393 2015-09-03 Casing String Witnessed No Violations Status check on site inspection to witness the well stimulation process found US Well Service pressure pumping initiating the 43rd of 49 total stages to be completed with 500 gallons of 15% Hcl ran ahead of the process. Bass Service companys well head is contracted to provide well head control during the process with the well head and stimulation iron pressure rated at 15,000 psi. Renegade wireline service has perforated the well by first setting a 15,000# rated pressure completion plug at 9,856 and the perforating the well in 6 clusters of 10 shots spaced out between the depths of 9,856 and 9,843.