| Well ID: 34-121-24497 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.90802571,"lon":-81.32476585,"icon":""}]} |
| County: Noble | |
| Municipality: | |
| Operator Name: ANTERO RESOURCES CORPORATION | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2014-06-03 | |
| Unconventional: No | |
| Configuration: Vertical | |
| Well Status: Well Drilled | |
| Violations: 0 | |
| Latitude: 39.90802571 | |
| Longitude: -81.32476585 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1402937165 | 2014-06-16 | My inspection today finds Falcon rig 27 drilled a 17.5 hole to a depth of 1905'. The rig crew ran 1870' of 13.625 casing. Allied cemented the casing in place with 1427 sacks of class A cement. I witnessed 22 barrels of cement to surface. | ||||
| -1419692932 | 2014-11-17 | My inspection today finds the drilling rig, Patterson 340, is building the bottom hole assembly to begin drilling the 8.75 curve and lateral. | ||||
| -65430217 | 2014-06-13 | I am onsite to witness the surface casing cementing operations. Falcon rig 27 drilled 380' of 24 hole and ran 367' of 18.625 inch 87.5 pound casing. Allied Oil and Gas Services circulated 757 sacks of class A cement into place. The cement mix water tested at 101 ppm chlorides on a low range Quantab. |
For data sources see[1]