If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86407091,"lon":-81.43082962,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-04-24 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.86407091 | |
Longitude: -81.43082962 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 0.0 | 880.0 | ||||
2014-3 | 116064.0 | 91.0 | 8429.0 | 91.0 | ||
2014-2 | 158003.0 | 91.0 | 12389.0 | 91.0 | ||
2014-1 | 350890.0 | 74.0 | 34651.0 | 74.0 | ||
2014-4 | 91751.0 | 92.0 | 6553.0 | 92.0 | ||
2015-1 | 71913.0 | 89.0 | 5523.0 | 89.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1212271577 | 2014-01-28 | My inspection finds the preliminary restoration requirements have been met. The tank battery consists of eighteen 400 bbl tanks that are shared with three other wells. | ||||
-133634714 | 2013-06-26 | My inspection today finds the well was struck by lightning at 7:00 pm last night. The lightning burnt out a module in the top drive. The top drive has been repaired and the rig is currently drilling at a depth of 6350'. A review of the site indicates that the operator can remove the super silt fence around the location. | ||||
1411378611 | 2013-06-24 | My inspection today finds Patterson is drilling at a depth of 5149'. | ||||
1456236498 | 2013-07-01 | My inspection today finds the rig (Patterson 343) is drilling 8.5 hole at a depth of 7020' building the curve section of the well. | ||||
1458879711 | 2013-06-11 | I am onsite to witness surface casing cementing operations. Patterson rig 343 ran 565' of 18.625 casing. Superior Well Service cemented the casing in place with 470 bbl of class A cement. 176 bbl of cement circulated to surface. | ||||
1475985360 | 2013-06-19 | My inspection today finds that the drilling rig is currently drilling 12.25 hole at a depth of 2411. I reviewed the BOP test results. | ||||
1652983689 | 2013-06-11 | My inspection today finds that the rig has drilled a 24 hole to a depth of 565'. They are preparing to run 560' of 18.625 casing. | ||||
-1680264343 | 2014-03-31 | My inspection finds well is in production. The tank battery consists of eighteen 400 bbl tanks that are shared with three other wells. The identification is posted as required. The well site is being prepared for a drilling rig. | ||||
-1906748746 | 2015-04-02 | I am accompanied Inspector David Ball today. Our inspection finds the well appears capable of production with the production valves open. The tank battery is comprised of eighteen 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad. The well site meets the preliminary restoration requirements. | ||||
-1923670241 | 2013-11-21 | My inspection today finds the service rig has drilled out the kill plug at 5001' and is running tubing to the first plug. |
For data sources see[2]