| Well ID: 34-121-24540 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86487378,"lon":-81.37069233,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2014-10-02 | |
| Unconventional: | |
| Configuration: | |
| Well Status: Drilling | |
| Violations: 0 | |
| Latitude: 39.86487378 | |
| Longitude: -81.37069233 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1889118535 | 2014-10-30 | My inspection today finds the drilling rig, Sidewinder 54, is drilling a 17.5 hole at a depth of 1397' at an average rate of 80' per hour. The company man indicated that a substantial water flow was encountered at 1200'. | ||||
| -834619967 | 2014-10-26 | I am onsite to witness the surface casing cementing operations. I tested the cement mix water for chlorides with a low range Quantab at 2.8 or (82) parts per million. Sidewinder Drilling Rig 54 ran 397' of 18.625 J-55 casing. Four centralizers were utilized to provide sufficient standoff and foster effective circulation of cement. Allied Oil and Gas Services cemented the casing in place with 155 barrels of class A cement with 20 barrels of cement circulating to surface. The latch down plug landed at 270 psi. The casing was pressured up to 770 psi. The casing pressure test was passed. |
For data sources see[1]