37-131-20055

Well Details

Well ID: 37-131-20055
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 149228
Farm/Lease Name: RUARK EAST RUARK EAST 1 1H
License Status: Active
Spud Date: 08/02/2010
Permit Date: 7/1/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.583364
Longitude: -76.019791

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 CITRUS ENERGY CORP 2,347,983.00 162 0.00 0 0.00 0
2012 CITRUS ENERGY CORP 3,176,155.00 361 0.00 0 0.00 0
2013 CITRUS ENERGY CORP 1,642,311.00 330 0.00 0 0.00 0
2014 CITRUS ENERGY CORP 1,706,663.69 318 0.00 0 0.00 0
2015 WARREN E & P INC 1,009,599.28 254 0.00 0 0.00 0
2016 WARREN E & P INC 1,119,938.53 365 0.00 0 0.00 0
2017 WARREN E & P INC 821,407.39 363 0.00 0 0.00 0
2018 WARREN E & P INC 537,677.10 359 0.00 0 0.00 0
2019 BKV OPR LLC 130,098.58 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-S02 Drill Cuttings (in Tons) 662.00 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE
2010-S02 Produced Fluid (in Barrels) 704.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011-S02 Drill Cuttings (in Tons) 27.00 Tons LANDFILL 132310
2011-S02 Fracing Fluid Waste (in Barrels) 611.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 320.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 287.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 70.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 325.88 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 115.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015-S01 Produced Fluid (in Barrels) 55.10 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015-S02 Produced Fluid (in Barrels) 487.49 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015-S02 Produced Fluid (in Barrels) 155.30 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-S01 Other Oil & Gas Wastes (in Barrels) RWC 899 184.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-S01 Other Oil & Gas Wastes (in Barrels) RWC 899 29.35 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-S01 Other Oil & Gas Wastes (in Tons) RWC 899 11.36 Tons LANDFILL THR029
2016-S01 Produced Fluid (in Barrels) RWC 802 220.03 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-S01 Produced Fluid (in Barrels) RWC 802 44.24 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-S02 Other Oil & Gas Wastes (in Barrels) RWC 899 98.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016-S02 Other Oil & Gas Wastes (in Barrels) RWC 899 8.51 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-S02 Other Oil & Gas Wastes (in Tons) RWC 899 3.00 Tons LANDFILL THR029
2016-S02 Produced Fluid (in Barrels) RWC 802 277.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016-S02 Produced Fluid (in Barrels) RWC 802 32.87 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 5.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M01 Produced Fluid (in Barrels) RWC 802 74.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017-M01 Produced Fluid (in Barrels) RWC 802 109.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 25.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M02 Produced Fluid (in Barrels) RWC 802 123.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 38.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M03 Produced Fluid (in Barrels) RWC 802 146.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M04 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 10.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M06 Produced Fluid (in Barrels) RWC 802 101.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M07 Produced Fluid (in Barrels) RWC 802 112.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M08 Produced Fluid (in Barrels) RWC 802 74.33 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 37.30 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 37.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M10 Produced Fluid (in Barrels) RWC 802 37.30 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 224.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M12 Produced Fluid (in Barrels) RWC 802 75.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M12 Produced Fluid (in Barrels) RWC 802 147.80 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 72.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M01 Produced Fluid (in Barrels) RWC 802 37.57 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 111.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 100.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M03 Produced Fluid (in Barrels) RWC 802 283.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M04 Produced Fluid (in Barrels) RWC 802 37.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M05 Produced Fluid (in Barrels) RWC 802 64.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M05 Waste Water Treatment Sludge (in Tons) RWC 804 0.20 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2018-M06 Produced Fluid (in Barrels) RWC 802 158.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 74.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 37.33 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M08 Produced Fluid (in Barrels) RWC 802 37.33 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 74.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M09 Produced Fluid (in Barrels) RWC 802 37.33 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 109.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M12 Produced Fluid (in Barrels) RWC 802 74.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M12 Produced Fluid (in Barrels) RWC 802 37.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019-M01 Produced Fluid (in Barrels) RWC 802 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019-M02 Produced Fluid (in Barrels) RWC 802 71.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M03 Produced Fluid (in Barrels) RWC 802 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M03 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019-M03 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1957799 Primary Facility 03/15/2011 Routine/Complete Inspection No Violations Noted
1980896 Primary Facility 06/16/2011 Routine/Complete Inspection Violation(s) Noted Please refer to Inspection IDs: 1990949 & 1985807 for further information.
2039283 Primary Facility 02/02/2012 Follow-up Inspection No Violations Noted Here to check annuli for gas. 20" X 13 3/8" open, no gas , no bubbles at previous inspection.13 3/8" X 9 5/8" annulus has plate welded on with vent ,but not welded to 9 5/8' pipe - see photo, were no bubbles at previous inspection and 0 gas reading on Altair 5x gas meter for methane at this insp.. 9 5/8" X 5 1/2" was shut in for 10 to 20 min and had 0 psi, although Citrus reports gas in this annulus. On site were Kevin Costello, DEP, and for Citrus, Rick Fields, Tracy Mathews, Chris, and Julie.
2351676 Primary Facility 03/13/2015 Routine/Complete Inspection No Violations Noted
2354982 Primary Facility 03/25/2015 Routine/Complete Inspection No Violations Noted
2392383 Primary Facility 07/24/2015 Routine/Partial Inspection No Violations Noted
2429758 Primary Facility 11/17/2015 Routine/Complete Inspection No Violations Noted There was no activity at the site as we arrived around 12:00. We used an Oakton MultiParameter PCSTester 35 and a Hanna Soil Test and Electrical Conductivity & Temperature meter to screen the water in the Production Fluid Storage Tanks and Gas Production Unit containment. Conductivity readings were in the range of (700-800) microSiemens/cm in water inside the production fluid tanks containment and less than (500) microSiemens/cm in water inside the GPU containment. We collected a water sample using the PADEP Bureau of Labs Standard Analysis Code 046 in the production fluid tanks containment at N-41.58295; W-076.01905. The parameters to be analyzed are listed in the Department's 11-17-15 Macialek inspection report. The intent of screening the water for conductivity and collecting the sample is to determine if the water meets the requirements of PA Title 25, Section 78.60 and Warren's SOP in the event this containment water will be discharged to stormwater controls on-site.
2430866 Primary Facility 12/08/2015 Administrative/File Review No Violations Noted Attached are the sample results of the water sample collected in the Production Fluid Storage Tank Containment Area as indicated in the 11/17/15 inspection report. The sample results were submitted with the inspection report.
2500408 Primary Facility 2016-07-01 Routine/Complete Inspection No Violations Noted
2502820 Primary Facility 2016-07-20 Administrative/File Review In Compliance with Policy
2739600 Primary Facility 2018-06-07 Routine/Complete Inspection No Violations Noted At the time of the inspection Stone Well Service’s Workover Rig 2 was pulling tubing at the Ruark South Unit Ruark East 1 Ruark South 2H (131-20081). At the start of my inspection, I met with Gary Gerard of BKV. I conducted the inspection accompanied by Mr. Gerard. Based on the circumstances described in the findings of this report, I will conduct a Follow-Up Inspection to confirm or deny an incident of a pollution-causing substance (contaminated storm-water) had contacted the well pad surface (constructed of a permeable material) and/or the suspected substance (contaminated storm-water) had been adequately removed and disposed of in a proper manner. The Follow-Up Inspection will be conducted following the conclusion operations and preferably at the time the secondary containment is recovered. Please provide notification for when this may occur and I will attempt to coordinate an on-site visit at the time. If you have any questions, please contact me.
2744894 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:40. The weather conditions are cloudy skies and breezy with temperatures around 70 degrees Fahrenheit. There was no activity at the site. There are (3) wells at the site in the production phase, Ruark East 1H, Ruark East- Ruark South 2H, and Ruark East 11 H. I initially met with Sean Bonnice, and Cory Bradley, well pumpers of J.P. Reilly & Associates. Mr. Bonnice provided me with the following information. "A Service Rig recently moved to the BKV Macialek pad and it is currently on the BKV Mattocks pad. At the end of production tubing, which is at the end of the curve, around (7,000) feet in depth, tubing was pulled to change an x-nipple and to remove a perforated sub. Lubricators have been installed on all (3) wells. The next step is to install plungers on the wells." Matt Mercaldo, contractor manager, and Gavin Chilson, automation specialist both of BKV arrived during my conversation with the Reilly personnel. Mr. Mercaldo provided me with the following information. "The

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1980896 613690 06/16/2011 07/28/2011 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

For data sources see[6]

References