If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.07-16-013-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.0981376,"lon":-101.2487873,"icon":""}]} |
Well Name: East Manson Unit No. 5 Prov. | |
Country: Canada | |
Province: Manitoba | |
Division: Division No. 15 | |
Subdivision: Ellice-Archie | |
Operator Name: TORC Oil & Gas Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: 2010-03-07 | |
License Date: 2010-03-03 | |
Well Total Depth: 714 | |
Latitude: 50.0981376 | |
Longitude: -101.2487873 |
For data sources see[1]
Spud Date | Contractor | Rig Number |
---|---|---|
2010-03-07 | Tempco Drilling Company Inc. | D054 |
For data sources see[2]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2010-03-13 | HOLLOW STEEL CARRIER | 663.5 | 666 | 20 | N/A | 2010-04-27 |
2010-03-13 | HOLLOW STEEL CARRIER | 668 | 668.5 | 20 | N/A | 2010-04-27 |
For data sources see[3]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2010-10-14 | ACID JOB | 15 % HCL | 0.8 | N/A | ||
2010-10-14 | FRAC | N/A | 20/40 | SAND | 3 |
For data sources see[4]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Crescent Point Energy Corp. | 121.40 | 0 | 0.00 |
2015 | Crescent Point Energy Corp. | 160.40 | 0 | 0.00 |
2016 | Crescent Point Energy Corp. | 23.60 | 0 | 0.00 |
2017 | TORC Oil & Gas Ltd. | 222.10 | 0 | 0.00 |
2018 | TORC Oil & Gas Ltd. | 392.70 | 0 | 0.00 |
2019 | TORC Oil & Gas Ltd. | 57.10 | 0 | 0.00 |
For data sources see[5]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Crescent Point Energy Corp. | 58.40 | 284 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Crescent Point Energy Corp. | 52.00 | 324 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Crescent Point Energy Corp. | 27.90 | 80 | 0.00 | 0 | 0.00 | 0.00 |
2017 | TORC Oil & Gas Ltd. | 152.10 | 340 | 0.30 | 340 | 0.00 | 0.00 |
2018 | TORC Oil & Gas Ltd. | 133.40 | 350 | 2.80 | 350 | 0.00 | 0.00 |
2019 | TORC Oil & Gas Ltd. | 8.50 | 90 | 0.00 | 90 | 0.00 | 0.00 |
For data sources see[5]