If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31176 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.745839,"lon":-79.411156,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Kittanning Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 144991 | |
Farm/Lease Name: BLANEY 591764 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-11-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.745839 | |
Longitude: -79.411156 |
Date | Event |
---|---|
2013-11-14 | New Permit Application |
2014-08-01 | New Permit Application |
2015-04-08 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-03-31 | 2016-04-07 | 7,317 | 11,168,800 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MC MX 8-2544 | Multi-Chem Group | Live Culture - Nitrate Reducing Bacteria | Sodium chloride | 7647-14-5 | 100 | 0.00994744 | 10297.5 |
Sodium nitrate | 7631-99-4 | 5 | 0.000497372 | 514.876 | ||||
LD-2550 | Multi-Chem Group | Additive | Inner salt of alkyl amines | Proprietary | 60 | 0.00947271 | 9806.08 | |
Sodium chloride | 7647-14-5 | 10 | 0.00157878 | 1634.35 | ||||
Sl-6 | C and J Energy Services | Scale Inhibitor | Methanol | 67-56-1 | 1 | 0.000250207 | 259.012 | |
Trade Secret | Proprietary | 7 | 0.00175145 | 1813.09 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000500413 | 518.024 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000500413 | 518.024 | ||||
Cl-3 | C and J Energy Services | Corrosion Inhibitor | 1-octanol | 111-87-5 | 2.5 | 0.00000496 | 5.134 | |
4-nonylphenol, Branched, Ethoxylated | 127087-87-0 | 5 | 0.00000992 | 10.269 | ||||
Isopropanol | 67-63-0 | 2.5 | 0.00000496 | 5.134 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.00002976 | 30.806 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.00007936 | 82.148 | ||||
2-butoxyethanol | 111-76-2 | 15 | 0.00002976 | 30.806 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.00003968 | 41.074 | ||||
Tar Bases, Quinoline Derivs., Benzyl Chloride-quaternized | 72480-70-7 | 15 | 0.00002976 | 30.806 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00000496 | 5.134 | ||||
1-decanol | 112-30-1 | 5 | 0.00000992 | 10.269 | ||||
Water | C and J Energy Services | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.0347 | 93,203,400.0 | |
LD-2250 | Multi-Chem Group | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0161767 | 16746 | |
Sodium chloride | 7647-14-5 | 5 | 0.00269611 | 2791 | ||||
Ethoxylated alcohol | Proprietary | 5 | 0.00269611 | 2791 | ||||
Fatty nitrogen derived amides | Proprietary | 5 | 0.00269611 | 2791 | ||||
Polyacrylate | Proprietary | 30 | 0.0161767 | 16746 | ||||
MC MX 5-3886 | Multi-Chem Group | Specialty Brine | Calcium nitrate.4H2O | 13477-34-4 | 100 | 0.110348 | 114231 | |
Sand (Proppant) | C and J Energy Services | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.65085 | 9,990,500.0 | |
Hydrochloric Acid (15%) | C and J Energy Services | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0148791 | 15402.8 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 920,548.00 | 260 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 706,808.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 500,726.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 383,846.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | EQT PROD CO | Drilling Fluid Waste | 445.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Drill Cuttings | 569.00 Tons | LANDFILL | 100434 |
2015 | EQT PROD CO | Fracturing Fluid Waste | 7.69 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015 | EQT PROD CO | Drill Cuttings | 482.02 Tons | LANDFILL | 101397 |
2015 | EQT PROD CO | Fracing Fluid Waste | 3,820.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 29.55 Tons | LANDFILL | 101397 |
2016 | EQT PROD CO | Servicing Fluid | 30.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 540.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 4,810.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Fracturing Fluid Waste | 3,700.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Synthetic Liner Materials | 97.50 Tons | LANDFILL | 101397 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 10,930.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 195.84 Bbl | LANDFILL | 101397 |
2016 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 2D0859721 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 5,845.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 22,153.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | EQT PROD CO | Waste Water Treatment Sludge | 50.98 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | EQT PROD CO | Produced Fluid | 5,029.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 450.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 88,806.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2017 | EQT PROD CO | Produced Fluid | 3,441.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 545.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | 3,455.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | EQT PROD CO | Produced Fluid | 3,565.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | 1,706.00 Bbl | REUSE (AT WELL PAD) | ||
2018 | EQT PROD CO | Produced Fluid | 1,092.13 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 3,197.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 40.71 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 21.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 1,165.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 257.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | EQT PROD CO | Produced Fluid | 135.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 57.21 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Produced Fluid | 157.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 17.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 2.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Produced Fluid | 92.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 155.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 74.29 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 32.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Produced Fluid | 1,443.30 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 37.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2362089 | Primary Facility | 2015-04-16 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. All cut and fill slopes had been temporarily stabilized with seed and mulch. All site and access road controls had been properly installed and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2366338 | Primary Facility | 2015-05-01 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard issues were present at the site. Conductor pipe (26”) was set at 40 ft. and was cemented in. 13 3/8” pipe was set at 888 feet. The pipe was cemented with Class A of 460 sacks with 48 bbl. Return. The 9 5/8” pipe was set at 3555 feet. Cement of pipe was completed with 1325 sks of Class AI and 66 bbl. Return. The drilling was continued to the Onondaga formation at 7460 feet. |
2368621 | Primary Facility | 2015-05-05 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard issues were present at the site. Conductor pipe (26”) was set at 40 ft. and was cemented in. 13 3/8” pipe was set at 895 feet. The pipe was cemented with Class A of 1370 sacks with 61 bbl. Return. Top of coal seam was 284’ to 288’. Basket set at 260’. The 9 5/8” pipe was set at 3580 feet. Cement of pipe was completed with 1250 sks of Class A and 35 bbl. Return. |
2378071 | Primary Facility | 2015-06-10 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. All cut and fill slopes had been temporarily stabilized with seed and mulch. All site and access road controls had been properly installed and there was no observed accelerated erosion or sedimentation in relation to the site or access road. One of the two impoundments shown on the plan drawings had been constructed, lined and a fence had been installed. |
2378269 | Primary Facility | 2015-05-01 | Drilling/Alteration | No Violations Noted | drilling 591764 |
2378319 | Primary Facility | 2015-05-28 | Drilling/Alteration | No Violations Noted | drilling 590948 |
2378325 | Primary Facility | 2015-05-20 | Drilling/Alteration | No Violations Noted | drilling 591764 |
2378338 | Primary Facility | 2015-05-13 | Drilling/Alteration | No Violations Noted | drilling 591662 |
2389865 | Primary Facility | 2015-07-15 | Complaint Inspection | No Violations Noted | ID Sign in place. Patterson 227 rig up and drilling. |
2401256 | Primary Facility | 2015-07-10 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard issues were present at the site. Patterson rig 227 moved to well and was in preparation to start drilling out the horizontal section of the well. KOP was 5,381 feet. TD was 13,946 feet. Production pipe (5 ½”) was cemented with 710 sacks of Class A Lead and 840 sacks of Class H tail. |
2406787 | Primary Facility | 2015-09-14 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, wells were not equipped for production. Work was underway onsite to prep the site for well stimulation activities. Containment was being laid and Baker Tanks were onsite to be put into place on containment. Impoundments had been constructed onsite, they had been properly lined and contained fluids. There was more than two feet of lined freeboard in each impoundment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2417335 | Primary Facility | 2015-08-10 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard issues were present at the site. Drilling well 590948 |
2417405 | Primary Facility | 2015-10-20 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no freeboard issues were present at the site. Drilling well 591775. |
2420109 | Primary Facility | 2015-08-31 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no freeboard issues were present at the site. Drilling well 591661 |
2437917 | Primary Facility | 2016-01-04 | Routine/Complete Inspection | No Violations Noted | Well is drilled-waiting on frac. Well head casing-equipment ok. |
2441177 | Primary Facility | 2016-01-15 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well had not been stimulated. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Two ipoundments located onsite and they contained fluids. Both impoundments had more than the required two feet of lined freeboard. |
2470318 | Primary Facility | 2016-03-31 | Drilling/Alteration | No Violations Noted | Operator prepping for 20 stage frac @ time of inspection. Joined company man for pre-frac job safety walk through. Equipment looked ok. |
2472917 | Primary Facility | 2016-04-08 | Drilling/Alteration | No Violations Noted | Operator had finished 20 stage frac and was moving frac support equipment off site at the time of this inspection. Well site equipment looked ok. |
2478039 | Primary Facility | 2016-04-25 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, work was underway to equip the well for production. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Impoundments located onsite and they both contained fluids and had more than the required freeboard. Based upon the observation of deposits in both impoundments it was inferred that flowback fluids had been contained within each of the impoundments. |
2507384 | Primary Facility | 2016-08-02 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Impoundments located onsite and they both contained fluids and had more than the required freeboard. Work was underway to empty the impoundments of their fluid contents and solids to prepare them for liner removal and regrading. |
2529542 | Primary Facility | 2016-10-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Earthwork was underway to restore the site and bring it into agreement with the PCSM plan contained within the ESCGP. |
2547488 | Primary Facility | 2016-12-28 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that earthmoving activities to restore the site had been completed. The site had been temporarily stabilized and thatnthe vegetation had begun to grow but had not yet attained 70% uniform coverage. |
2560276 | Primary Facility | 2017-02-09 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2595748 | Primary Facility | 2017-05-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2658883 | Primary Facility | 2017-11-09 | Site Restoration | No Violations Noted | Multi-well pad. At time of inspection, well drilled and appears equipped for production. |
2709299 | Primary Facility | 2018-03-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2720512 | Primary Facility | 2018-04-12 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. At time of inspection, wells 591765, 590949, 591764, 590948, 591775, 591662, 591661 drilled and appear equipped for production.
The ESCGP for this site was previously terminated on 10/27/2017. |
2774783 | Primary Facility | 2018-09-13 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and complete tank battery look ok. |
2820900 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]