X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384251504002

Well Details

Well ID: 0384251504002
Loading map...
Location: 00/04-15-038-25W4/2
Location Alias: 00/04-15-38-25 W4M
Location Alias 2: 00/04-15-038-25 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 25
Section: 15
County/Municipality: Lacombe County
Well Name: NAL JOFFRE 4-15-38-25
Operator Name: NAL Resources Limited
License Number: 0100512
License Date: 1983-02-09
License Status: Amended
Spud Date: 1983-02-16
Final Drill Date: 1983-02-19
Well Total Depth: 1475.20 m
Surface Hole Latitude: 52.261387
Surface Hole Longitude: -113.501617

For data sources see[1][2]

Well History

Date Event
1983-02-09 Obtained License
1983-02-19 Finished Drilling
1983-02-19 Perforation Treatment Performed - Jet Perforation
1983-02-19 Well Mode changed to Drilled and Cased
1983-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-21 Well Log Performed
1983-02-26 Well Began Injection
1983-02-26 Well Fluid changed to Water
1983-02-26 Well Type changed to Injection
1991-06-15 Well Fluid changed to Water
1991-06-15 Well Mode changed to Suspended
1991-06-15 Well Type changed to Injection
1997-11-01 Well Fluid changed to Water
1997-11-01 Well Type changed to Injection
2000-07-01 Well Fluid changed to Carbon Dioxide
2000-07-01 Well Type changed to Injection
2001-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-30 Perforation Treatment Performed - Jet Perforation
2001-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-31 Well Log Performed
2001-09-01 Perforation Treatment Performed - Jet Perforation
2001-09-02 Perforation Treatment Performed - Remedial Casing
2001-09-07 Well Log Performed
2001-09-08 Perforation Treatment Performed - Jet Perforation
2001-09-08 Well Log Performed
2001-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-10 Perforation Treatment Performed - Remedial Casing
2001-10-04 Perforation Treatment Performed - Jet Perforation
2001-10-05 Well Log Performed
2001-10-07 Perforation Treatment Performed - Cement Squeeze
2001-10-07 Plug Back Performed
2001-10-12 Well Log Performed
2001-10-16 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-19 Perforation 1444.10 1448.10 13
1983-02-21 Acid Treatment 1444.10 1448.10 0
2001-08-30 Packing Device Capped w/Cement 1419.00 1425.00 0
2001-08-30 Perforation 1390.00 1390.50 17
2001-08-30 Perforation 1405.00 1405.50 17
2001-08-31 Acid Treatment 1390.00 1405.50 0
2001-09-01 Perforation 1390.00 1391.00 17
2001-09-01 Perforation 1400.00 1401.00 17
2001-09-02 Remedial Casing Cementing 1390.00 1405.50 0
2001-09-08 Perforation 1379.50 1380.50 17
2001-09-08 Perforation 1390.00 1390.50 17
2001-09-09 Acid Treatment 1379.50 1390.50 0
2001-09-10 Remedial Casing Cementing 1390.00 1390.50 0
2001-10-04 Perforation 1390.00 1391.00 17
2001-10-07 Cement Squeeze 1379.50 1391.00 0
2001-10-16 Perforation 1444.10 1448.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References