If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275072409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.318225,"lon":-114.852116,"icon":""}]} |
Location: 00/09-24-027-07W5/0 | |
Location Alias: 00/09-24-27-07 W5M | |
Location Alias 2: 00/09-24-027-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 5 | |
Range: 07 | |
Section: 24 | |
County/Municipality: Municipal District of Bighorn No. 8 | |
Well Name: Canlin WCATH 9-24-27-7 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0287925 | |
License Date: 2003-06-03 | |
License Status: Abandoned | |
Spud Date: 2003-07-11 | |
Final Drill Date: 2003-08-04 | |
Well Total Depth: 2615.00 m | |
Surface Hole Latitude: 51.318225 | |
Surface Hole Longitude: -114.852116 |
Date | Event |
---|---|
2003-06-03 | Obtained License |
2003-07-12 | Direction Drilling Operation Performed - Deviate |
2003-07-16 | Surface Casing Operation Performed |
2003-07-29 | Well Log Performed |
2003-08-04 | Finished Drilling |
2003-08-04 | Well Log Performed |
2003-08-04 | Well Mode changed to Drilled and Cased |
2003-08-05 | Well Log Performed |
2003-08-07 | Production Casing Operation Performed |
2003-08-07 | Rig Released |
2003-09-05 | Well Log Performed |
2003-09-10 | Perforation Treatment Performed - Jet Perforation |
2003-09-18 | Perforation Treatment Performed - Fractured |
2003-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-20 | Perforation Treatment Performed - Jet Perforation |
2003-09-20 | Plug Back Performed |
2003-09-20 | Well Mode changed to Abandoned Zone |
2003-09-23 | Perforation Treatment Performed - Fractured |
2003-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-28 | Perforation Treatment Performed - Jet Perforation |
2003-09-28 | Plug Back Performed |
2004-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-01-22 | Perforation Treatment Performed - Jet Perforation |
2004-01-22 | Plug Back Performed |
2004-01-23 | Perforation Treatment Performed - Cement Plug |
2004-01-23 | Perforation Treatment Performed - Remedial Casing |
2004-01-24 | Perforation Treatment Performed - Cement Plug |
2004-01-24 | Perforation Treatment Performed - Jet Perforation |
2004-01-24 | Perforation Treatment Performed - Remedial Casing |
2004-01-26 | Perforation Treatment Performed - Cement Plug |
2004-01-26 | Perforation Treatment Performed - Jet Perforation |
2004-01-26 | Perforation Treatment Performed - Remedial Casing |
2004-01-26 | Well Log Performed |
2004-01-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2004-01-30 | Perforation Treatment Performed - Cement Plug |
2004-01-30 | Perforation Treatment Performed - Remedial Casing |
2004-02-05 | Perforation Treatment Performed - Jet Perforation |
2004-02-06 | Perforation Treatment Performed - Cement Plug |
2004-02-06 | Perforation Treatment Performed - Remedial Casing |
2004-05-02 | Well Log Performed |
2004-06-19 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2003-07-12 | 42.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-09-10 | Perforation | 2483.00 | 2486.00 | 17 |
2003-09-18 | Fracture | 2483.00 | 2486.00 | 0 |
2003-09-20 | Packing Device Capped w/Cement | 2464.00 | 2472.00 | 0 |
2003-09-20 | Perforation | 2278.00 | 2282.00 | 17 |
2003-09-23 | Fracture | 2278.00 | 2282.00 | 0 |
2003-09-28 | Packing Device Capped w/Cement | 2260.00 | 2268.00 | 0 |
2003-09-28 | Perforation | 2163.00 | 2166.00 | 17 |
2004-01-22 | Packing Device Capped w/Cement | 2147.00 | 2155.00 | 0 |
2004-01-22 | Perforation | 1271.00 | 1274.00 | 13 |
2004-01-23 | Remedial Casing Cementing | 1271.00 | 1274.00 | 0 |
2004-01-23 | Cement Plug | 1164.60 | 1271.00 | 0 |
2004-01-24 | Perforation | 674.50 | 677.50 | 17 |
2004-01-24 | Remedial Casing Cementing | 674.50 | 677.50 | 0 |
2004-01-24 | Cement Plug | 641.30 | 674.50 | 0 |
2004-01-26 | Perforation | 552.00 | 555.00 | 17 |
2004-01-26 | Remedial Casing Cementing | 552.00 | 555.00 | 0 |
2004-01-26 | Cement Plug | 507.00 | 552.00 | 0 |
2004-01-29 | Hydra Jet Perforation | 494.50 | 498.50 | 1 |
2004-01-30 | Remedial Casing Cementing | 494.50 | 498.50 | 0 |
2004-01-30 | Cement Plug | 490.00 | 494.50 | 0 |
2004-02-05 | Perforation | 473.00 | 475.00 | 13 |
2004-02-05 | Perforation | 482.00 | 484.00 | 13 |
2004-02-06 | Remedial Casing Cementing | 482.00 | 484.00 | 0 |
2004-02-06 | Remedial Casing Cementing | 473.00 | 475.00 | 0 |
2004-02-06 | Cement Plug | 413.70 | 473.00 | 0 |
For data sources see[5]